Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Mobile County, Ala., funds by Commerce, Department of

Listing $6,130,601.56 in stimulus funds from Commerce, Department of for Mobile

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
NATURE CONSERVANCY, THE $2,155,301 Habitat Conservation The goal of this project is to create a vertical oyster reef/breakwater which will provide shoreline stabilization/restoration along two stretches of shoreline (estimated at 1.5-2.0 miles of total shoreline) in two different project locations identified i
This spending item is part of a $2,956,446 allocation. See details
National Oceanic and Atmospheric Administration 6/25/2009
BENDER SHIPBUILDING & REPAIR CO., INC. $1,077,167 Dry-docking and repairs to the NOAA Ship Gordon Gunter
This spending item is part of a $1,525,677 allocation. See details
National Oceanic and Atmospheric Administration 11/23/2009
MARINE ENVMTL SCNCES CNSORTIUM $563,705 Habitat Conservation The goal of this project is to create a vertical oyster reef/breakwater which will provide shoreline stabilization/restoration along two stretches of shoreline (estimated at 1.5-2.0 miles of total shoreline) in two different project locations identified i
This spending item is part of a $2,956,446 allocation. See details
National Oceanic and Atmospheric Administration 6/25/2009
BOAT PEOPLE S.O.S., INC. $461,539 Broadband Technology Opportunities Program (BTOP) Neighborhood Empowerment and Support through Teamwork - Community Technology Center Bayou La Batre (NEST-CTC) will facilitate and support broadband access for vulnerable and underserved residents of Bayou La Batre, Alabama and surrounding areas of Sou... Show more National Institute of Standards and Technology 8/19/2010
AUTOMATED LOGIC CORPORATION $348,750 HVAC Retrofit and Control Systems Upgrade National Oceanic and Atmospheric Administration 3/31/2010
HILL MARINE REFRIGERATION INC $283,555 Dockside Major Repair Period (MRP) for NOAA Ship Oregon II Base Items: General Reuiements, Habitability Upgrades, Steel and Aluminum Repairs, Piping Repairs, Mechanical Repairs, Main Engine Major Overhaul, Ship Service Diesel Generator Major Ovehaul/Upgr
This spending item is part of a $3,863,739 allocation. See details
National Oceanic and Atmospheric Administration 1/28/2010
HADCO SERVICES, INC. $246,414 Dockside Major Repair Period (MRP) for NOAA Ship Oregon II Base Items: General Reuiements, Habitability Upgrades, Steel and Aluminum Repairs, Piping Repairs, Mechanical Repairs, Main Engine Major Overhaul, Ship Service Diesel Generator Major Ovehaul/Upgr
This spending item is part of a $3,863,739 allocation. See details
National Oceanic and Atmospheric Administration 1/28/2010
UNIVERSITY OF SOUTH ALABAMA $237,440 Habitat Conservation The goal of this project is to create a vertical oyster reef/breakwater which will provide shoreline stabilization/restoration along two stretches of shoreline (estimated at 1.5-2.0 miles of total shoreline) in two different project locations identified i
This spending item is part of a $2,956,446 allocation. See details
National Oceanic and Atmospheric Administration 6/25/2009
ABC Applicators Inc $227,309 Dry-docking and repairs to the NOAA Ship Gordon Gunter
This spending item is part of a $1,525,677 allocation. See details
National Oceanic and Atmospheric Administration 11/23/2009
HILLER SYSTEMS INCORPORATED $198,655 MMC shall provide engineering, design, technical and support efforts necessary for development of a complete and accurate technical description of the FSV 6 ship. This effort will produce a design with descriptive documentation, which meets the requirem
This spending item is part of a $74,975,588 allocation. See details
National Oceanic and Atmospheric Administration 4/19/2010
HILLER SYSTEMS INCORPORATED $77,660 MMC shall provide engineering, design, technical and support efforts necessary for development of a complete and accurate technical description of the FSV 6 ship. This effort will produce a design with descriptive documentation, which meets the requirem
This spending item is part of a $74,975,588 allocation. See details
National Oceanic and Atmospheric Administration 4/19/2010
Centerline Inc $71,717 Dry-docking and repairs to the NOAA Ship Gordon Gunter
This spending item is part of a $1,525,677 allocation. See details
National Oceanic and Atmospheric Administration 11/23/2009
HILLER SYSTEMS INCORPORATED $71,360 MMC shall provide engineering, design, technical and support efforts necessary for development of a complete and accurate technical description of the FSV 6 ship. This effort will produce a design with descriptive documentation, which meets the requirem
This spending item is part of a $74,975,588 allocation. See details
National Oceanic and Atmospheric Administration 4/19/2010
Allen-Southern Electric Motor Service, Inc. $64,258 Dry-docking and repairs to the NOAA Ship Gordon Gunter
This spending item is part of a $1,525,677 allocation. See details
National Oceanic and Atmospheric Administration 11/23/2009
MARITECH MARINE & INDUSTRIAL SERVICES, INC. $45,771 Dry-docking and repairs to the NOAA Ship Gordon Gunter
This spending item is part of a $1,525,677 allocation. See details
National Oceanic and Atmospheric Administration 11/23/2009