Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Lake and Peninsula County, Alaska, funds by Interior, Department of

Listing $1,418,878.00 in stimulus funds from Interior, Department of for Lake and Peninsula

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
NEWHALEN TRIBAL COUNCIL $583,108 Highway Planning and Construction Design for phases 1 & 2 for 2 miles of route 1003,1012, 1013 1014 1017. This grant will provide funds for engineering and design services. Indian Affairs (Assistant Secretary) 5/10/2010
BRISTOL BAY NATIVE ASSOCIATION, INC. $247,941 Highway Planning and Construction Indian Reservation Roads Award for Dago Creek Road (4PPT) realignment project. Indian Affairs (Assistant Secretary) 7/02/2010
LEVELOCK VILLAGE COUNCIL $219,607 Highway Planning and Construction Design for 1st and 7th st to improve roads and conditions Indian Affairs (Assistant Secretary) 4/09/2010
CHIGNIK LAGOON, VILLAGE $58,670 Highway Planning and Construction Preliminary design activities associated with approximately 4.7 miles of new construction of a gravel road, Routes 1012 and 2100, Section 10. Indian Affairs (Assistant Secretary) 6/09/2010
CHIGNIK LAGOON, VILLAGE $58,670 Highway Planning and Construction Provide design services for a geotechnical report on our inter-tribal road between Chignik Lagoon and Chignik Lake Indian Affairs (Assistant Secretary) 6/30/2010
PERRYVILLE VILLAGE COUNCIL $47,098 Construction Of Project NO. E01378A1, Perryville Guardrail Installation-Tsunami Shelter Road, Including Road Maintenance Supplemental Indian Affairs (Assistant Secretary) 5/12/2010
CHIGNIK LAKE TRADITONAL COUNCIL $42,471 Highway Planning and Construction Chignik Lake Road Rehabilitation, Culvert Replacements. Indian Affairs (Assistant Secretary) 5/25/2010
CHIGNIK LAKE TRADITONAL COUNCIL $42,471 Chignik Lake Road Rehabilitation, Culvert Replacements. Indian Affairs (Assistant Secretary) 5/25/2010
CHIGNIK BAY TRIBAL COUNCIL $37,237 Phase I Design Project to Develop Survey,Environmental, and Rights-of-Way Documents for the Extension of Gustav Street Road Project in Chignik Bay Alaska Indian Affairs (Assistant Secretary) 4/19/2010
CHIGNIK BAY TRIBAL COUNCIL $37,237 Highway Planning and Construction Phase I Design Project to Develop Survey,Environmental, and Rights-of-Way Documents for the Extension of Gustav Street Road Project in Chignik Bay Alaska Indian Affairs (Assistant Secretary) 4/19/2010
NONDALTON TRIBAL COUNCIL $22,184 Design of Project No./ID NO. E01353A 1, route 1004 for grading, drainage, resurfacing and widening. Indian Affairs (Assistant Secretary) 4/08/2010
NONDALTON TRIBAL COUNCIL $22,184 Highway Planning and Construction Design for route 1004 for grading, drainage, resurfacing,and widening Indian Affairs (Assistant Secretary) 4/01/2010
KOKHANOK TRIBAL COUNCIL $0 Highway Planning and Construction Project E01264A1-Design for Main and School Road, Phase 1.
This spending item is part of a $50,518 allocation. See details
Indian Affairs (Assistant Secretary) 4/08/2010