Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Pima County, Ariz., funds by Interior, Department of

Listing $13,146,221.98 in stimulus funds from Interior, Department of for Pima

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
KRAUS-ANDERSON CONSTRUCTION COMPANY $2,515,868 The contract includes upgrades to the existing San Simon Elementary School in Sells, AZ. Upgrades include: 1) New HVAC systems in all buildings including new DDC controls, 2) New lighting throughout the existing classrooms and common areas of the school, Indian Affairs (Assistant Secretary) 9/28/2009
CIMARRON MEDICAL INFORMATICS $1,996,404 Implementation of RPMS Reference Lab System at 75 IHS and tribal health facilities. Office of Policy, Management and Budget/Chief Financial Officer 9/29/2010
WESTERN EMULSIONS, INC. $1,310,345 Deliver and distribute CRS-2P asphalt emulsion to various Roads Construction Projects in Montana for the BIA Indian Affairs (Assistant Secretary) 3/03/2010
WESTLAND RESOURCES, INC. $988,345 Wildlife Exclusion and bat survey and Coronado National Memorial and Saguaro National Park. National Park Service 5/07/2010
LINE AND SPACE LLC $708,484 Design for a new Administrative Headquarters Office for the San Diego National Wildlife Refuge U.S. Fish and Wildlife Service 6/01/2009
NFIRMC JOINT VENTURE $680,832 Install Safety Closures at Abandoned Mines to Protect Visitors and Preserve Resources. National Park Service 4/08/2010
WLB GROUP, INC. THE $622,500 Highway Planning and Construction Project ID Numbers: H58A0100,H58A0200,H58A0300,H58A0400, H58A0500, & H58A0600; To furnish all labor, materials, equipment, and services to provide project planning, preconstruction services and tribal project management to develop plans, special contract
This spending item is part of a $1,431,665 allocation. See details
Indian Affairs (Assistant Secretary) 6/16/2010
A & S PAVING, INC. $508,059 Highway Planning and Construction Design portion complete. Modification of $508,059 to furnish all labor, materials, equipment and services to provide construction and tribal project management activities for crack, cleaning and sealing, asphalt-rubber concrete pavement, sign installation
This spending item is part of a $533,059 allocation. See details
Indian Affairs (Assistant Secretary) 1/29/2010
SOUTHWESTERN DAKOTAH, INC. $370,106 The work of this contract consists of the general construction of 3,750 LF of a 10 waterline in Bunker Rd, installation of 940 LF of a 6 waterline ate the horse stables, with service to the blimp hangar, valve vault modifications at the Ft. Barry Water t
This spending item is part of a $1,010,249 allocation. See details
National Park Service 5/12/2010
STATISTICAL RESEARCH, INC. $316,847 National Historic Trails Inventory
This spending item is part of a $2,289,803 allocation. See details
Bureau of Land Management 5/14/2010
TOHONO O'ODHAM NATION, THE $288,020 Native American Employment and Training American Recovery and Reinvestment Act funds Indian Affairs (Assistant Secretary) 7/01/2009
TOHONO O'ODHAM NATION, THE $288,020 The additional ARRA funding allowed us to support 71 individuals toward self-sufficiency in training, educational, career exploration and employment service. This program year the youth portion of the progam increased enrollment and allowed us to cost sha Indian Affairs (Assistant Secretary) 7/01/2009
TOHONO O'ODHAM NATION, THE $288,020 Native American Employment and Training American Recovery and Reinvestment Act Funds Indian Affairs (Assistant Secretary) 7/01/2009
PALMER, PAUL $149,000 clear mesquite trees from 2000 acres on federal land U.S. Fish and Wildlife Service 2/25/2010
JAMES WOODWARD THE LIGHTHOUSE CONSULTANT LLC $144,829 Restoration of the Fire Island National Seashore Historic Lighthouse Lens in Captree Island, NY.
This spending item is part of a $358,448 allocation. See details
U.S. Fish and Wildlife Service 5/12/2010
WESTERN EMULSIONS, INC. $131,950 Deliver CRS-2P emulsion to various jobsites Indian Affairs (Assistant Secretary) 8/10/2010
EMPIRE PUMP CORPORATION $128,929 Provide and install water well systems: electric and solar U.S. Fish and Wildlife Service 12/24/2009
HARRIS ENVIRONMENTAL GROUP $128,470 Work involves performing project management to ensure compliance of the NPS?s construction contract for the construction of closures at AMLs in Coronado National Memorial,Grand Canyon Nation Park AML and ORgan Pipe National Monument AML. Work under this National Park Service 9/16/2010
The J R Tuttle Co $119,560 Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation. See details
Indian Affairs (Assistant Secretary) 6/24/2010
WESTLAND RESOURCES, INC. $99,618 Abandoned Rock Mine Surveys in Arizona with NEPA
This spending item is part of a $1,225,308 allocation. See details
National Park Service 8/24/2009
RIDGWAY VALLEY ENTERPRISES, INC. $83,901 Saguaro Red Hills Visitor Center Reroof National Park Service 7/23/2010
HARRIS ENVIRONMENTAL GROUP $81,013 Work involves performing project management to ensure compliance of the NPS?s construction contract for the construction of closures at AMLs in Coronado National Memorial and Saguaro National Park. Work under this contract requires a biological monitor f National Park Service 5/12/2010
ASTENIUS, BENNETT $76,950 Bobwhite quayle revegatation U.S. Fish and Wildlife Service 12/15/2009
ASTENIUS, BENNETT $76,950 Revegatation for endangered bobwhite quail U.S. Fish and Wildlife Service 12/15/2009
R Dahlstrom Construction Company LLC $67,057 White Sands National Monument: Rehabilitation of Headquarters Building
This spending item is part of a $175,835 allocation. See details
National Park Service 3/11/2010
FOREST SERVICE $65,697 Direct a crew of SCA interns in completion of cultural resource surveys of up to 12000 acres of the Buenos Aires National Wildlife Refuge U.S. Fish and Wildlife Service 12/14/2009
A & S PAVING, INC. $62,297 Highway Planning and Construction Design completed, $110,000 modification to furnish all labor, materials, equipment and services to provide construction and tribal project management activities for sign installations and pavement markings at select locations on 2.0 miles of Routes 2,3,4
This spending item is part of a $120,000 allocation. See details
Indian Affairs (Assistant Secretary) 1/29/2010
PASCUA YAQUI TRIBE $57,703 Highway Planning and Construction Design completed, $110,000 modification to furnish all labor, materials, equipment and services to provide construction and tribal project management activities for sign installations and pavement markings at select locations on 2.0 miles of Routes 2,3,4
This spending item is part of a $120,000 allocation. See details
Indian Affairs (Assistant Secretary) 1/29/2010
PEARSON EDUCATION, INC. $56,000 Professional Development to support the purchase of K-8 Reading for San Simon School. Indian Affairs (Assistant Secretary) 7/16/2010
PRIZIM INC $53,995 This is a fixed price contract. Final Report submitted. Work is being undertaken south of Imperial Dam for the Laguna Restoration Project in support of Lower Colorado River Multi-Species Conservation Program (LCR MSCP). Work proposed for the Laguna Rest Bureau of Reclamation 11/18/2009
SOUTHERN ARIZONA YORK CONTRACTING, INC $47,262 HVAC Replacement National Park Service 6/26/2009
PEARSON EDUCATION, INC. $42,373 K-5 Reading Textbooks and Intervention books Indian Affairs (Assistant Secretary) 7/14/2010
PEARSON EDUCATION, INC. $42,290 Reading Textbooks and Reading Intervention Books to improve reading performance Indian Affairs (Assistant Secretary) 8/19/2010
A & S PAVING, INC. $41,986 Road Maintenance_Indian Roads To furnish all labor, materials and personnel to perform Tribal project management, route assessments on 17.3 miles of roadways; pavement preservation activities and safety improvements activities
This spending item is part of a $63,157 allocation. See details
Indian Affairs (Assistant Secretary) 3/26/2010
HARRIS ENVIRONMENTAL GROUP $31,800 A cultural resources inventory of approximately 2,214 acres in the LosPosos project area withing the Las Cienegas National Conservation Area (LCNCA) Bureau of Land Management 11/06/2009
HARRIS ENVIRONMENTAL GROUP $31,800 A cultural Resources inventory of approximately 2,214 acres in the Los Posos project area within the Las Cienegas National Conservation ARea (LCNCA) Bureau of Land Management 11/06/2009
HARRIS ENVIRONMENTAL GROUP $29,995 To survey and assess the presence of the Mojave population of the desert tortoise at 46 mine sites within the Death Valley Greenwater Valley, California National Park Service 5/10/2010
DESERT VIEW PAINTING, INC $29,987 Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation. See details
Indian Affairs (Assistant Secretary) 6/24/2010
THE STUDENT CONSERVATION ASSOCIATION INC $28,086 Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. The award funded services to the Buenos Aires National Wildlife Refuge from the Student Conservation Association's (SCA) Conservation Intern (CI) program, which recruits and maintains qualified young people in environmental and co... Show more U.S. Fish and Wildlife Service 12/17/2009
PEARSON EDUCATION, INC. $28,000 Professional Development services to support the implementation of the program that the school has purchased. The expected outcome is that we should teacher improvement in using the program with fidelity and student achievement in reading should also imp Indian Affairs (Assistant Secretary) 8/19/2010
GREEN WORLD SOLUTIONS, INC. $26,656 Reading Consultant Services. The Reading consultant is to work with the faculty at Santa Rosa Boarding School for approximately 10 months, to provide reading professional development and technical assistance to support effective implementation of the Rea Indian Affairs (Assistant Secretary) 9/13/2010
DESERT ARCHAEOLOGY, INC $25,500 Contract for drainage improvements at Casa Grande National Monument. The work involves importing fill material and applying it in areas that are experiencing erosion from water runoff and foot traffic. The filling is being done in archaeologically sensiti National Park Service 9/11/2009
Kimley-Horn and Associates, Inc. $25,000 Highway Planning and Construction Design portion complete. Modification of $508,059 to furnish all labor, materials, equipment and services to provide construction and tribal project management activities for crack, cleaning and sealing, asphalt-rubber concrete pavement, sign installation
This spending item is part of a $533,059 allocation. See details
Indian Affairs (Assistant Secretary) 1/29/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $21,680 Cultural Survey, Empire Well Project Bureau of Land Management 6/23/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $21,680 Cultural Resource Inventory, Hummel House Project Bureau of Land Management 5/19/2010
PASCUA YAQUI TRIBE $21,171 Road Maintenance_Indian Roads To furnish all labor, materials and personnel to perform Tribal project management, route assessments on 17.3 miles of roadways; pavement preservation activities and safety improvements activities
This spending item is part of a $63,157 allocation. See details
Indian Affairs (Assistant Secretary) 3/26/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $20,117 Aldridge Survey Bureau of Land Management 4/02/2010
PALMER, PAUL $19,885 clean out stock ponds on Buenos Aires Wildlife Refuge U.S. Fish and Wildlife Service 12/05/2009
TIERRA RIGHT OF WAY SERVICES, LTD. $19,790 Black Canyon Trail condition assessment. Bureau of Land Management 1/07/2010
WILLIAM SELF ASSOCIATES, INC. $18,986 The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov Bureau of Land Management 10/02/2009
Van Wagenen Surveying $18,000 Provide all labor, equipment and material necessary to re-construct 2.8 miles of road BIA Route 232 on the Tohono O'odham Nation, Pima County, Arizona. The primary scopes of work include roadway grading, drainage improvements, place aggregate base course,
This spending item is part of a $1,414,457 allocation. See details
Indian Affairs (Assistant Secretary) 3/30/2010
ADVANCED RESOURCE SOLUTIONS, INC $14,720 AZ Trail Condition Assessment Bureau of Land Management 12/18/2009
PEARSON EDUCATION, INC. $13,257 Reading Textbooks and Reading Intervention Books to improve reading performance Indian Affairs (Assistant Secretary) 8/20/2010
PEARSON EDUCATION, INC. $12,012 6, 7, and 8th Grade Literature and Writing and Grammar books Indian Affairs (Assistant Secretary) 9/07/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $10,830 Cultural Survey, Bird Dog Project Bureau of Land Management 6/21/2010
PEARSON EDUCATION, INC. $10,500 6, 7, and 8th Grade Literature and Writing and Grammar books Indian Affairs (Assistant Secretary) 8/11/2010
WILLIAM SELF ASSOCIATES, INC. $8,126 The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov Bureau of Land Management 10/02/2009
WESTERN EMULSIONS, INC. $8,000 BIA to pick-up CSS-1 at our plant in Billings, MT Indian Affairs (Assistant Secretary) 3/01/2010
WILLIAM SELF ASSOCIATES, INC. $6,963 The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov Bureau of Land Management 10/02/2009
PEARSON EDUCATION, INC. $4,003 Online Reading Library Indian Affairs (Assistant Secretary) 9/07/2010
PASCUA YAQUI TRIBE $0 Highway Planning and Construction Design portion complete. Modification of $508,059 to furnish all labor, materials, equipment and services to provide construction and tribal project management activities for crack, cleaning and sealing, asphalt-rubber concrete pavement, sign installation
This spending item is part of a $533,059 allocation. See details
Indian Affairs (Assistant Secretary) 1/29/2010
SOUTHWESTERN DAKOTAH, INC. $0 Demo, Site Utilities Upgrade, and Construction of new Classroom/ Library shall be performed
This spending item is part of a $1,226,200 allocation. See details
Indian Affairs (Assistant Secretary) 6/24/2010