Yuma County, Ariz., funds by General Services Administration

Listing $34,874,916.22 in stimulus funds from General Services Administration for Yuma

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MAC ELECTRIC, INC. $8,816,520 Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation. See details
Public Buildings Service 3/18/2010
Tempe Mechanical $3,361,948 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
SUNDT CONSTRUCTION, INC. $3,263,578 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Hawkeye Electric, Inc. $2,614,642 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
FOLEY MASONRY AND TILE INC $2,176,533 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
PACIFIC STEEL, INC. $1,851,098 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
ABACUS PROJECT MANAGEMENT INC. $1,506,040 Provide Construction Management services for a new Federal Courthouse in Yuma, AZ. The facility will be approximately 56,000 square feet and will include space for the US Magistrate Court; Bankruptcy Court; Probation Office; Pre-trial Services; District
This spending item is part of a $1,696,877 allocation. See details
Public Buildings Service 7/29/2010
EHRLICH, STEVEN ARCHITECTS $1,481,561 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
PERFORMANCE CONTRACTING GROUP, INC. $1,046,908 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
AT YOUR SERVICE HEATING & COOLING, LLC $940,418 Design and build out solar field to connect to generator station at the Port of Entry in San Luis, AZ
This spending item is part of a $1,315,418 allocation. See details
Public Buildings Service 8/26/2010
Otis Elevator Company $828,906 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Western Millwork Inc $778,026 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
CORNERSTONE DETENTION PRODUCTS, INC. $704,842 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
AMERICAN DIRECT PROCUREMENT, INC. $426,078 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
LSW ENGINEERS ARIZONA, INCORPORATED $417,840 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
DMS ROOFING, INC. $369,729 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Just Rite Acoustics, Inc. $351,196 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
OTIS ELEVATOR COMPANY $346,970 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
AMTEK ELECTRIC, LLC $340,000 Design and build out solar field to connect to generator station at the Port of Entry in San Luis, AZ
This spending item is part of a $1,315,418 allocation. See details
Public Buildings Service 8/26/2010
CORRADINI CORP. $236,262 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Yuma Carpets & Tile, Inc. $200,322 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
AERO AUTOMATIC SPRINKLER COMPANY $180,900 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
ARVISO ENGINEERING INC $176,580 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Biltrite, Inc. $172,759 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
GEN3 AZ $160,501 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Kinetic Control Corp $158,394 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Caruso Turley Scott, Inc. $137,573 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Harris/Arizona Rebar Inc. $128,548 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
UNDERWOOD BROS., INC. $124,900 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
TEN EYCK LANDSCAPE ARCHITECTS, INC. $118,654 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Charles Court Construction, Inc. $110,923 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
CEMEX CONSTRUCTION MATERIALS SOUTH, LLC $102,786 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
DESERT EXCAVATING, INC $100,044 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
PILKINGTON COMMERCIAL CO., INC. $100,000 Stipend for new US federal Courthouse Yuma AZ Public Buildings Service 12/15/2010
SUNDT CONSTRUCTION, INC. $100,000 Stipend for the Phase Two Submittal re: New U.S. Federal Courthouse in Yuma, AZ. Public Buildings Service 12/14/2010
KIEWIT BUILDING GROUP INC. $100,000 Stipend for Phase Two Submittal. Recovery - New U.S. Federal Courthouse in Yuma, AZ. Public Buildings Service 12/15/2010
PSOMAS $98,249 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
ABACUS PROJECT MANAGEMENT INC. $86,727 The project consists of Design and Construction Management services for a new 276kw Photovoltaic System installation servicing buildings located within the Land Port of Entry facilities in San Luis, AZ. Land Port of Entry is located at the Mexico border Public Buildings Service 9/08/2010
SOUTHWEST METALSMITHS, INC. $74,355 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
WEIDLINGER ASSOCIATES, INC. $59,000 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
ROLF JENSEN & ASSOCIATES, INC. $56,800 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Ardy's Window Coverings & Repairs $56,632 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
FACILITEC, INC. $48,745 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Flanigan Lifts & Elevator Services Inc $45,902 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
D. H. PACE COMPANY, INC. $44,611 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Gort Metals Corporation $40,268 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
PIE FORENSIC CONSULTANTS, INC. $39,125 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
Banker Insulation, Inc. $36,680 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
J.R.P. CONSTRUCTION, L.L.C. $35,000 Design and build out solar field to connect to generator station at the Port of Entry in San Luis, AZ
This spending item is part of a $1,315,418 allocation. See details
Public Buildings Service 8/26/2010
NEWSON BROWN ACOUSTICS LLC $33,600 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
TORRENT RESOURCES, INCORPORATED $27,950 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
NICKLAUS ENGINEERING, INC. $19,840 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
TERRACON CONSULTANTS, INC. $15,000 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
STANTEC CONSULTING SERVICES INC. $8,007 Develop American Land Title Association (ALTA) Survey of Yuma, AZ courthouse. Supply draft ALTA Survey within 30 calendar days from General Services Administration's Notice to Proceed (dated March 18, 2010) to include seven copies and one copy in electron
This spending item is part of a $9,163 allocation. See details
Public Buildings Service 3/18/2010
TRULY NOLEN OF AMERICA, INC. $7,056 Federal Courthouse, to be located in Yuma, AZ, constructed of Load Bearing CMU & Structural Steel with Membrane Roof System to meet ATFP requirement. Includes admin & courtroom spaces constructed with metal stud framing & drywall systems with high end fi
This spending item is part of a $22,832,815 allocation. See details
Public Buildings Service 11/15/2010
CITIZENS TITLE & TRUST $2,983 Escrow/Title Services Public Buildings Service 3/04/2010
GUTIERREZ CANALES ENGINEERING, P.C. $2,650 Environmental Site Assessment U.S. Magistrate Court House Yuma, AZ. Public Buildings Service 4/05/2010
JAY V. VANCE, MAI, LLC $2,600 Appraisal for Yuma Courthouse at 98 West 1St., Yuma, AZ 85364 Public Buildings Service 1/13/2010
ARCHITECTURE COMPANY, THE $1,156 Develop American Land Title Association (ALTA) Survey of Yuma, AZ courthouse. Supply draft ALTA Survey within 30 calendar days from General Services Administration's Notice to Proceed (dated March 18, 2010) to include seven copies and one copy in electron
This spending item is part of a $9,163 allocation. See details
Public Buildings Service 3/18/2010