Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Orange County, Calif., funds by Interior, Department of

Listing $19,346,535.33 in stimulus funds from Interior, Department of for Orange

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
IRVINE RANCH WATER DISTRICT $11,602,000 Water Reclamation and Reuse Program The design and construction of Wells 21 and 22 Project. Bureau of Reclamation 4/30/2010
IRVINE RANCH WATER DISTRICT $1,755,414 Water Reclamation and Reuse Program The design and construction of Natural Treatment System Site No. 67. Bureau of Reclamation 12/23/2009
CAROLLO ENGINEERS, INC. $1,701,005 Water 2025 Construction of the Oro Grande Wash Recharge Project
This spending item is part of a $3,609,079 allocation. See details
Bureau of Reclamation 9/29/2009
APERTURE FILMS, LTD. $607,705 We will provide all design-build services including comprehensive reasearch and all necessary information for exhibit development, planning, design, production and installation of interpretive media. We will begin by redesigning the existing exhibit plan
This spending item is part of a $3,431,314 allocation. See details
National Park Service 5/06/2010
APERTURE FILMS, LTD. $414,747 Creating Media For National Park Site In New York City National Park Service 5/12/2010
IRVINE RANCH WATER DISTRICT $398,000 Water Reclamation and Reuse Program The design and construction of the Tustin Legacy Well 1. Bureau of Reclamation 3/29/2010
AHTNA ENGINEERING SERVICES, LLC $356,167 Placing aggregate base course, installing vehicle barriers and renovating multiple parking lots.
This spending item is part of a $417,452 allocation. See details
U.S. Fish and Wildlife Service 6/07/2010
AHTNA ENGINEERING SERVICES, LLC $282,760 Construct new water systems at various BLM sites including well construction, abandonment of existing well, relocation of existing photovoltaic system, installation of heat trace, construction of a stainless steel water storage tank.
This spending item is part of a $361,142 allocation. See details
U.S. Fish and Wildlife Service 6/15/2010
AHTNA ENGINEERING SERVICES, LLC $280,768 Building improvements including roofing, ventilation and insulation.
This spending item is part of a $354,124 allocation. See details
U.S. Fish and Wildlife Service 6/25/2010
CREATE GREEN ENERGY INC. $239,545 Design and Install Photovoltaic Solar Energy System at Golden Gate NRA National Park Service 9/20/2011
RBC LUBRON BEARING SYSTEMS, INC. $195,640 8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP.
This spending item is part of a $17,480,694 allocation. See details
Bureau of Reclamation 3/27/2010
PADILLA & ASSOCIATES INC $156,154 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
PADILLA & ASSOCIATES INC $156,154 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
CALIFORNIA STATE UNIVERSITY, FULLERTON $150,000 Volcano Hazards Program Research and Monitoring. This study focuses on understanding the timescales and manner in which the 2006 eruption of Augustine Volcano in Alaska was triggered, which will improve our understanding of volcanic eruption processes and therefore improve our ability to accurately f... Show more Geological Survey 11/23/2009
CSU Fullerton $150,000 U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 Magma Mixing in Real-Time Geological Survey 3/08/2010
PADILLA & ASSOCIATES INC $110,224 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
PADILLA & ASSOCIATES INC $110,224 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
West Hazmat Drilling Corp $100,027 Preparation of an Environmental Evaluation/Cost Analysis (EE/CA) for the Sonoma mercury mine site. Perform historical document review, a limited site investigation which will include soil and groundwater sampling, preparation of a topographic map of the s
This spending item is part of a $456,049 allocation. See details
Bureau of Land Management 2/10/2010
COPP CONTRACTING INC $91,204 parking lot construction chipseal, labor and material Bureau of Land Management 11/09/2009
COPP CONTRACTING INC $91,204 parking lot construction, chip seal Bureau of Land Management 11/09/2009
Master-Halco, Inc. $55,329 Provide and deliver to Chickamauga & Chattanooga NMP 3370 LaFayette Road Ft. Oglethorpe, GA 30742 8,700 Western Split Cedar Fence Rails 10 ft. long and stackable. With no tenons.
This spending item is part of a $56,985 allocation. See details
National Park Service 5/19/2010
C & S PRODUCTS, INC. $55,203 Video teleconference equipment Geological Survey 2/22/2010
CTG ENTERPRISES, INC. $52,000 61094-0000-000 Project is seeking Leadership Environmental and Energy Design certification for new construction [LEED NC 2009] under United States Green Building Council [USGBC]. We are performing Fundamental and Enhanced Commissioning for the San Diego N U.S. Fish and Wildlife Service 12/16/2009
West Hazmat Drilling Corp $48,045 Preparation of an Environmental Evaluation/Cost Analysis (EE/CA) for the Helen mercury mine site. Perform historical document review, a limited site investigation which will include soil and groundwater sampling, preparation of a topographic map of the si
This spending item is part of a $273,990 allocation. See details
Bureau of Land Management 2/10/2010
K S Dunbar & Associates Inc $46,770 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
CHAMBERS GROUP, INC. $46,467 The project consists of three major tasks; (1) (a) Literature search of existing previous cultural surveys and recorded cultural resources along 13 miles of Smokey Valley Road in Washoe County, NV; (b) cultural field surveys with metal detectors in some Bureau of Land Management 9/19/2009
UNDERSEA SYSTEMS INTERNATIONAL, INC. $32,809 Dive Masks For PN Region Dive Team Bureau of Reclamation 9/22/2010
GANAHL LUMBER COMPANY $22,551 Building Materials. Indian Affairs (Assistant Secretary) 6/29/2010
S.R. BRAY LLC $10,000 The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T
This spending item is part of a $15,313,773 allocation. See details
Bureau of Reclamation 7/30/2010
K S Dunbar & Associates Inc $9,750 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009
GANAHL LUMBER COMPANY $8,390 Fencing materials National Park Service 5/12/2010
QUANTUM AUTOMATION $7,579 Qty 35 Power Supplies + Qty 18 Redundancy Kits Bureau of Reclamation 10/07/2009
K S Dunbar & Associates Inc $2,700 Water Reclamation and Reuse Program The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc
This spending item is part of a $9,313,000 allocation. See details
Bureau of Reclamation 12/31/2009