Placer County, Calif., funds by Department of the Air Force

Listing $1,026,491.42 in stimulus funds from Department of the Air Force for Placer

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
RUA & SON MECHANICAL, INCORPORATED $491,040 The work under this contract will consist of furnishing all labor, equipment, materials, design, engineering and installation of a roof framing and standing seam metal roof system necessary to remove and replace the existing built-up roof (BUR) system an
This spending item is part of a $1,050,442 allocation. See details
Department of the Air Force 8/11/2010
EDDIE OJEDA CONCRETE $348,312 The work under this contract will consist of furnishing all labor, equipment, materials, design, engineering and installation of a roof framing and standing seam metal roof system necessary to remove and replace the existing built-up roof (BUR) system an
This spending item is part of a $1,050,442 allocation. See details
Department of the Air Force 8/11/2010
RUA & SON MECHANICAL, INCORPORATED $115,295 The work under this contract will consist of furnishing all labor, equipment, materials, design, engineering and installation of a roof framing and standing seam metal roof system necessary to remove and replace the existing built-up roof (BUR) system on
This spending item is part of a $202,354 allocation. See details
Department of the Air Force 8/11/2010
EDDIE OJEDA CONCRETE $71,844 The work under this contract will consist of furnishing all labor, equipment, materials, design, engineering and installation of a roof framing and standing seam metal roof system necessary to remove and replace the existing built-up roof (BUR) system on
This spending item is part of a $202,354 allocation. See details
Department of the Air Force 8/11/2010