Listing $26,997,990.20 in stimulus funds from U.S. Army Corps of Engineers for Riverside

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HARPER CONTRACTING, INC. $24,249,343 Project No. 104779, Temporarily re-align the Santa Ana River. Reconstruct the existing washed away river banks and armor them with rip rap and make minor alignment adjustments. Restore the original to the original alignment. Re-align the golf course a U.S. Army Corps of Engineers - civil program financing only 9/30/2009
AGRI-CHEMICAL & SUPPLY INC. $1,393,733 Project Number 104779 Santa Ana River Mainstream Flood Control Project Mitigation, Habitat Restoration and Species Management This project provides mitigation for impacts to riparian and other floodplain habitat caused by the Santa Ana River Mainstem fl U.S. Army Corps of Engineers - civil program financing only 9/30/2009
HDR/CDM, A JOINT VENTURE $801,141 Project Number 104788; Final design, design documents, and a construction cost estimate for Perris II Desalter Well Pumping Facilities, Brine and off-site water and sewer pipline projects
This spending item is part of a $1,095,700 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
GENTERRA CONSULTANTS, INC. $218,456 Modification 3 to Task Order No. 1 U.S. Army Corps of Engineers - civil program financing only 9/09/2009
KRIEGER & STEWART, INCORPORATED $164,965 Project Number 104788; Final design, design documents, and a construction cost estimate for Perris II Desalter Well Pumping Facilities, Brine and off-site water and sewer pipline projects
This spending item is part of a $1,095,700 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
THOMSEN COMPANY, INC. THE $100,594 Project Number 104788; Final design, design documents, and a construction cost estimate for Perris II Desalter Well Pumping Facilities, Brine and off-site water and sewer pipline projects
This spending item is part of a $1,095,700 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
WESTERN VIDEO, INC. $31,738 8 CHANNEL DVR WITH DVD, PELCO SPECTRA IV ENVIRO CAM 35X W/C MONROE NAVIGATION FIELD OFFICE U.S. Army Corps of Engineers - civil program financing only 2/28/2010
SIMON WONG ENGINEERING, INC. $29,000 Project Number 104788; Final design, design documents, and a construction cost estimate for Perris II Desalter Well Pumping Facilities, Brine and off-site water and sewer pipline projects
This spending item is part of a $1,095,700 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/17/2009
FOOTHILL ENGINEERING AND DEWATERING, INC. $9,020 Project #: 104781 consists of the construction of a 460 MGD (million gallons per day) In-plant Secondary Effluent Pump Station. Related key element of this IPSEPS include: approach channels, wet well, appurtenances, 84' diameter force mains (piping syst
This spending item is part of a $24,825,295 allocation. See details