Recovery Tracker

How Much Stimulus Funding is Going to Your County?

San Diego County, Calif., funds by Army, Department of

Listing $5,791,270.81 in stimulus funds from Army, Department of for San Diego

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SYGNOS, INC. $2,714,000 ROOFING AND EVAPORATIVE COOLER UPGRADES AT THE CALIFORNIA NATIONAL GUARD MATES FACILITY AT CAMP ROBERTS, CA.
This spending item is part of a $2,994,611 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/30/2009
WHITEHORN CONSTRUCTION COMPANY $1,613,525 Building Renovation. U.S. Army Corps of Engineers, except civil program financing 9/30/2009
HERNANDEZ CONSTRUCTION CORPORATION $756,496 PROJECT NUBMER: 325157 AS A PART OF TRICARE MANAGEMENT ACTIVITY - DEFENSE HEALTH PROGRAM, RECOVERY ACT I.E.PACIFIC WAS ISSUED A CONTRACT FOR THE CAMP PENDLETON BLDG 22190 DENTAL CLINIC RENOVATION, LOCATED AT MARINE CORPS BASE CAMP PENDLETON, CA AS NEGOTIA
This spending item is part of a $1,302,604 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/18/2009
I.E.-PACIFIC, INC. $384,525 PROJECT NUBMER: 325157 AS A PART OF TRICARE MANAGEMENT ACTIVITY - DEFENSE HEALTH PROGRAM, RECOVERY ACT I.E.PACIFIC WAS ISSUED A CONTRACT FOR THE CAMP PENDLETON BLDG 22190 DENTAL CLINIC RENOVATION, LOCATED AT MARINE CORPS BASE CAMP PENDLETON, CA AS NEGOTIA
This spending item is part of a $1,302,604 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/18/2009
MCCLAIN MECHANICAL SYSTEMS $85,000 Lead paint removal, interior Painting, Epoxy Floor Covering. remove and replace HVAC, Electrical and Fire Suppression Systems with new up to current building codes.
This spending item is part of a $2,107,120 allocation. See details
Army, Department of 4/19/2010
COUNTYWIDE MECHANICAL SYSTEMS, INC. $60,156 PROJECT NUBMER: 325157 AS A PART OF TRICARE MANAGEMENT ACTIVITY - DEFENSE HEALTH PROGRAM, RECOVERY ACT I.E.PACIFIC WAS ISSUED A CONTRACT FOR THE CAMP PENDLETON BLDG 22190 DENTAL CLINIC RENOVATION, LOCATED AT MARINE CORPS BASE CAMP PENDLETON, CA AS NEGOTIA
This spending item is part of a $1,302,604 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/18/2009
COASTAL FLOORING, INC. $55,211 PROJECT NUBMER: 325157 AS A PART OF TRICARE MANAGEMENT ACTIVITY - DEFENSE HEALTH PROGRAM, RECOVERY ACT I.E.PACIFIC WAS ISSUED A CONTRACT FOR THE CAMP PENDLETON BLDG 22190 DENTAL CLINIC RENOVATION, LOCATED AT MARINE CORPS BASE CAMP PENDLETON, CA AS NEGOTIA
This spending item is part of a $1,302,604 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/18/2009
COASTAL PACIFIC ENTERPRISES $46,216 PROJECT NUBMER: 325157 AS A PART OF TRICARE MANAGEMENT ACTIVITY - DEFENSE HEALTH PROGRAM, RECOVERY ACT I.E.PACIFIC WAS ISSUED A CONTRACT FOR THE CAMP PENDLETON BLDG 22190 DENTAL CLINIC RENOVATION, LOCATED AT MARINE CORPS BASE CAMP PENDLETON, CA AS NEGOTIA
This spending item is part of a $1,302,604 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/18/2009
JP MOTORSPORTS LLC $37,201 INSTALLATION AND PURCHASE OF OUTBOARD MOTORS FOR 27' SAFE BOAT U.S. Army Corps of Engineers, except civil program financing 3/25/2010
HALCROW, INC. $22,291 TO 0002 Mission Bay Eelgrass Survey: Field investigation, laboratory testing, and report preparation for defined portions of the Corps of EngineersG?? Mission Bay Harbor Maintenance Dredging Project (Corps project) to include: vibratory coring sampling,
This spending item is part of a $197,763 allocation. See details
Army, Department of 7/24/2009
Wulff Mechanical, Inc. $9,150 Phase 1 Hangar roof replacement and repairs.
This spending item is part of a $2,749,068 allocation. See details
Army, Department of 8/19/2009
MCCLAIN MECHANICAL SYSTEMS $7,500 Phase 1 Hangar roof replacement and repairs.
This spending item is part of a $2,749,068 allocation. See details
Army, Department of 8/19/2009