Listing $1,558,888.78 in stimulus funds from Interior, Department of for Tuolumne

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
LASATER CONSTRUCTION CO, INC $287,225 Our project consists of removing an existing sand potable water treatment plant and replace it with a filtered water treatment plant with a backwash tank. The new water treatment plant will be designed and built by a vender and will be delivered to the s Bureau of Reclamation 12/11/2009
SUPPRESSION SYSTEMS INC $248,694 Award will have us demolish the existing CO2 fire suppression system & install a new Novec clean agent fire suppression system, sliding fire doors, and new fire/smoke HVAC Dampers.
This spending item is part of a $322,819 allocation. See details
Bureau of Reclamation 12/11/2009
K S Brueckner $227,547 The purpose of this project is to make several different specified campsites and campgrounds ADA compliant. In order to do this the Contractor will be removing some existing site furnishings and replacing them with ADA compliant furnishings. Existing grad
This spending item is part of a $1,382,306 allocation. See details
Bureau of Reclamation 5/15/2010
CUSTOM BUILDERS $191,000 Removal and dismanteling of trailers at Lake Berryesa. Windows will be removed prior to demolish. If metal roof and siding can be saved it will be recycled. Job site will be cleaned. Removal of all patio and parking pads and concrete will be removed f Bureau of Reclamation 12/31/2009
CREATIVE RECREATIONAL SYSTEMS, INC $177,390 The purpose of this project is to make several different specified campsites and campgrounds ADA compliant. In order to do this the Contractor will be removing some existing site furnishings and replacing them with ADA compliant furnishings. Existing grad
This spending item is part of a $1,382,306 allocation. See details
Bureau of Reclamation 5/15/2010
TUOLUMNE ME-WUK TRIBAL COUNCIL. $157,125 Highway Planning and Construction Operation and Administration of ARRA Indian Reservation Roads Program. Indian Affairs (Assistant Secretary) 9/15/2010
BD WATER TRUCK SERVICE, INC. $99,400 Heavy equipment rental with operator Bureau of Land Management 3/24/2010
CENTRAL STATES MANUFACTURING & SALES CORPORATION $79,288 Plumbing material and supplies. Bureau of Reclamation 8/19/2010
WESTON SOLUTIONS, INC $46,260 The purpose of this project is to conduct a Removal Site Investigation (RSI). The overall purpose of the RSI is to determine the presence and extent of heavy metal contamination in a portion of at the Longfellow Mill site, located in Big Oak Flat, Tuolumn Bureau of Land Management 2/24/2010
Mountain Alarm Inc $44,960 The purpose of this project is to make several different specified campsites and campgrounds ADA compliant. In order to do this the Contractor will be removing some existing site furnishings and replacing them with ADA compliant furnishings. Existing grad
This spending item is part of a $1,382,306 allocation. See details