Listing $6,266,319.32 in stimulus funds from General Services Administration for Boulder

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
PCL CONSTRUCTION SERVICES, INC $2,346,489 This project is to change out the mechanical and electrical systems in the building to achieve greater energy efficiency using Recovery Act Funds. Located in Boulder,CO Public Buildings Service 3/17/2010
GANDALF ASSOCIATES, INC. $1,861,273 The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas.
This spending item is part of a $58,612,383 allocation. See details
Public Buildings Service 5/20/2009
TRANE U.S. INC. $633,739 Trane Chiller Rebuild at David Skaggs Research Center, Boulder, CO. Public Buildings Service 2/16/2010
ROCKY MOUNTAIN INSTITUTE $296,400 Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation. See details
Public Buildings Service 2/17/2010
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION $288,500 Commissioning Services for the New United States Courthouse in Billings, Montana: Option Year 3 (9/29/09-9/28/2010). Purchase Order Modification PS02 dated 9/29/10-increase funding by $39,590.22, changing contract total from $809,057.41 to $848,647.63 9/2
This spending item is part of a $953,753 allocation. See details
Public Buildings Service 12/28/2009
ANDERSON HALLAS ARCHITECTS, PC $213,340 The purpose of this project is to implement Energy Conservation Measures at the David Skaggs Research Center in Boulder, Colorado as identified in the Recommissioning report that was created by Andrews & Anderson Architects and Enabled Energy Incorporated
This spending item is part of a $360,912 allocation. See details
Public Buildings Service 12/07/2009
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION $160,614 Services required to implement Energy Conservation Measures as identified in the Design Documents for the David Skaggs Research Center Energy conservation projects plans and specifications dated February 16, 2010 and Chiller Rebuild Specification dated Ja
This spending item is part of a $268,964 allocation. See details
Public Buildings Service 3/26/2010
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION $127,000 Purchase Order Modification PO02 issued to exercise the option for Commissioning Services and Construction Phase Services - New United States Courthouse in Austin Texas. 3/21/11:rcvd PS05 mod - increase funding by $68,507.29 to revised total of $281,614.2
This spending item is part of a $253,839 allocation. See details
Public Buildings Service 7/25/2009
K2 AUDIO, LLC $95,443 Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation. See details
Public Buildings Service 2/17/2010
Brown Civil Engineering $91,726 Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation. See details
Public Buildings Service 2/17/2010
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION $73,786 The purpose of this project is to implement Energy Conservation Measures at the David Skaggs Research Center in Boulder, Colorado as identified in the Recommissioning report that was created by Andrews & Anderson Architects and Enabled Energy Incorporated
This spending item is part of a $360,912 allocation. See details
Public Buildings Service 12/07/2009
CIVITAS, INC $35,000 Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation. See details
Public Buildings Service 2/17/2010
Jva, Inc. $17,402 To develop a statement of work for the repair and alteration of the Pierre Federal Office Building to replace the exisiting curtain wall system and repair basement water infiltration issues. There will be construction management services and the project
This spending item is part of a $50,304 allocation. See details
Public Buildings Service 7/28/2009
ANDERSON HALLAS ARCHITECTS, PC $15,704 Services required to implement Energy Conservation Measures as identified in the Design Documents for the David Skaggs Research Center Energy conservation projects plans and specifications dated February 16, 2010 and Chiller Rebuild Specification dated Ja
This spending item is part of a $268,964 allocation. See details
Public Buildings Service 3/26/2010
ANDREWS AND ANDERSON ARCHITECT PC $9,904 The David Skaggs Research Center is located at 325 Broadway in Boulder, Colorado. It is 415,000 sf. And completed in 1999. The building's exterior construction has a concrete superstructure, applied precast concrete and native sandstone with a nominal R
This spending item is part of a $114,127 allocation. See details
Public Buildings Service 6/09/2009