Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Larimer County, Colo., funds by Interior, Department of

Listing $18,364,643.82 in stimulus funds from Interior, Department of for Larimer

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
ABHE & SVOBODA, INC. $10,846,607 Flatiron Powerplant, Recoating and Relining of Penstocks 1 and 2, Colorado-Big Thompson Project, Colorado. This contract was funded by the American Recovery and Reinvestment Act of 2009
This spending item is part of a $12,557,481 allocation. See details
Bureau of Reclamation 12/22/2009
GARNEY COMPANIES, INC. $1,710,874 Flatiron Powerplant, Recoating and Relining of Penstocks 1 and 2, Colorado-Big Thompson Project, Colorado. This contract was funded by the American Recovery and Reinvestment Act of 2009
This spending item is part of a $12,557,481 allocation. See details
Bureau of Reclamation 12/22/2009
EDAW, INC. $1,012,966 National Historic Trails Inventory
This spending item is part of a $2,289,803 allocation. See details
Bureau of Land Management 5/14/2010
SYNERGETICS INCORPORATED $394,253 The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a Geological Survey 9/18/2009
SYNERGETICS INCORPORATED $388,253 The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a Geological Survey 9/18/2009
SYNERGETICS INCORPORATED $379,013 The project work is in the Central Region Geologic Hazards Team, Geologic Division, which is headquartered in Golden, Colorado. The Geologic Hazards Team (GHT) conducts research in geology, geophiysics, seismology, engineering seismology, geomagnetism, a Geological Survey 9/18/2009
BLUE LINE BUILDING SERVICES, INC. $352,577 Reroof of Beaver Meadow Roof National Park Service 8/27/2009
TETRA TECH CONSTRUCTION SERVICES, INC. $303,816 Install safety closures at abandoned mines throughout the Mojave National Preserve to protect visitors and preserve resources.
This spending item is part of a $1,082,358 allocation. See details
National Park Service 4/01/2010
SYNERGETICS INCORPORATED $270,250 The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien Geological Survey 9/18/2009
SYNERGETICS INCORPORATED $252,250 The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien Geological Survey 9/18/2009
SYNERGETICS INCORPORATED $246,539 The mission of the National Earthquake Information Center (NEIC) is to determine rapidly the location and size of all destructive earthquakes worldwide and to immediately disseminate this information to concerned national and international agencies, scien Geological Survey 9/18/2009
SCIPAR, INC. $245,875 The programmable automation components include the following Allen Bradley parts: Item #1 Quantity: 13; 17-slot PAC Backplane Chassis, part number 1756-A17; Item #2 Quantity: 4; 10-slot PAC Backplane Chassis, part number 1756-A10; Item #3 Quantity: 24; Bureau of Reclamation 10/22/2009
HYDRO ELECTRIC LLC $239,499 Installation of photovoltaics throughout the ANWR Facility. U.S. Fish and Wildlife Service 3/31/2010
EDAW, INC. $216,925 WY Trails Inventory
This spending item is part of a $530,415 allocation. See details
Bureau of Land Management 3/10/2010
RIDGWAY VALLEY ENTERPRISES, INC. $204,221 Remove existing decking on the Many Parks Curve Boardwalk and replace with new composite decking. To include re-leveling, cleaning and repainting of the steel superstructure. Existing wood railing will be replaced with steel railing. National Park Service 1/26/2010
BROWN CONSTRUCTION CONSULTING $187,020 Design build energy efficient headquarters/administrative/visitor building in Audubon NWR, ND.
This spending item is part of a $6,057,444 allocation. See details
U.S. Fish and Wildlife Service 6/10/2009
EDAW, INC. $179,101 Farmington Title III Construction RFI responses.
This spending item is part of a $454,811 allocation. See details
Bureau of Land Management 5/03/2010
AECOM, INC. $135,409 Noble Trail Management Plan Bureau of Land Management 4/20/2010
IN-SITU, INC $122,274 Equip Bureau of Reclamation 3/24/2010
PCC PREFERRED CONTRACTING & CONSULTING LLC $115,017 Title: Sewer Rehabilitation National Park Service 10/30/2009
SYNERGETICS INCORPORATED $108,443 The US Geological Survey Advanced National Seismic System (ANSS) National Operations Center (NOC) in Golden, Colorado has commenced the development of improved seismic monitoring and information delivery systems in response to the December, 2004, tsunami Geological Survey 9/18/2009
SYNERGETICS INCORPORATED $108,443 The US Geological Survey Advanced National Seismic System (ANSS) National Operations Center (NOC) in Golden, Colorado has commenced the development of improved seismic monitoring and information delivery systems in response to the December, 2004, tsunami Geological Survey 9/18/2009
RIDGWAY VALLEY ENTERPRISES, INC. $93,138 Rehabilitation of Moraine Park Campground Sewer at Rocky Mtn National Park National Park Service 4/20/2010
HACH COMPANY $52,316 For purchase of OTT CBS Bubbler Geological Survey 9/30/2009
ALPINEWORKS INC. $35,027 Sub-Awardee will provide materials and labor to complete this project National Park Service 3/16/2010
AECOM TECHNICAL SERVICES, INC. $30,990 Yosemite National Park, CA - Title I A/E Preliminary design services for Solar Equipment at El Portal Complex
This spending item is part of a $124,065 allocation. See details
National Park Service 10/16/2009
SPATIAL DATA TECHNOLOGIES, INC $25,407 custom mobile data collection application National Park Service 9/25/2009
IN-SITU, INC $20,355 Provide water temperature/conductivity/level sensor/dataloggers. Geological Survey 6/08/2009
IN-SITU, INC $19,214 Provide water temperature/conductivity/level sensor/dataloggers and ancillary equipment in support of the Yellowstone Volcano observatory mission. Geological Survey 8/13/2009
FROST ELECTRIC SUPPLY COMPANY $18,283 Programmable automation controller, miscellaneous interconnect devices including the following: Item #1 Quantity: 35; 1m SC/SC Duplex 62.5/125 Multimode Fiber Patch Cable ? Black, Wirewerks, Part number; PC-2ABK-SCCSCC-001; Item #2 Quantity: 3; RJ45 Ca Bureau of Reclamation 12/08/2009
COMPONENT SPECIALTIES, INC. $13,796 The items to be provided for maintenance network projects including the following 1) interconnect items including Quantity: 220; End plate, IDEC; Part number BNE15W Quantity: 5500; DIN ring terminal block, IDEC Part number: BNH15MW Quantity: 50; M Bureau of Reclamation 10/01/2009
ASRC MANAGEMENT SERVICES, INC. $11,995 1.Complete ARRA enhancements to the Fisheries Information System (FIS). U.S. Fish and Wildlife Service 6/08/2009
SAGINAW CONTROL & ENGINEERING, INC. $9,186 METAL ELECTRICAL ENCLOSURES Bureau of Reclamation 10/01/2009
Ctl/Thompson, Inc. $8,507 Farmington Title III Construction RFI responses.
This spending item is part of a $454,811 allocation. See details
Bureau of Land Management 5/03/2010
Ctl/Thompson, Inc. $6,804 Jupiter Inlet Restoration, Landscape Architecture.
This spending item is part of a $218,829 allocation. See details
Bureau of Land Management 8/27/2009