Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Pueblo County, Colo., funds by Army, Department of

Listing $1,054,015.78 in stimulus funds from Army, Department of for Pueblo

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
EL PASO PLUMBING, INC. $559,460 Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control Center in Bldg. 845. Design and Construct the renovation of the existing Command
This spending item is part of a $6,189,695 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/10/2009
SOUTH SIDE LAWN & LANDSCAPING LLC $239,611 Design and Construction of a Child Development Center at Peterson Air Force Base
This spending item is part of a $8,146,116 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/29/2009
BAHA CONSTRUCTION INC $184,902 Provide all plant, labor, equipment, materials, design, engineering, and incidentals necessary to accomplish the following: Repair/Upgrade the Peterson Installation Control Center in Bldg. 845. Design and Construct the renovation of the existing Command
This spending item is part of a $6,189,695 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/10/2009
A-VAR ELECTRIC, INC. $51,735 The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/23/2010
A-VAR ELECTRIC, INC. $12,830 The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/23/2010
A-VAR ELECTRIC, INC. $5,478 The project includes replacing 12 boilers in 12 separate buildings during the summer of 2010 at Ft. Carson. The project includes engineering design services, demolition of existing boilers, installation of new boilers, piping connections, and boiler flue
This spending item is part of a $850,662 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/23/2010