District of Columbia County, D.C., funds by Smithsonian Institution
Listing $15,865,913.64 in stimulus funds from Smithsonian Institution for District of Columbia
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BISCAYNE CONTRACTORS, INC. | $2,674,421 |
General Contracting, demolition, Hazmat removal
This spending item is part of a $3,686,421 allocation.
See details
|
Smithsonian Institution | 9/30/2009 |
SCHINDLER ELEVATOR CORPORATION | $2,646,101 | SEC shall furnish all supervision, labor, materials,and equipment necessary to complete escalator repair and upgrade work at NASM, as well as elevator upgrade work at the NMAH | Smithsonian Institution | 6/12/2009 |
M & M SALES, INC. | $2,136,885 | Recovery-Install high voltage electrical safety improvements | Smithsonian Institution | 4/10/2009 |
FORT MYER CONSTRUCTION CORPORATION | $1,900,512 |
To provide supervision, labor, equipment and materials required to Repair the three (3) Bridges at the National Zoological Park (NZP). Washington DC
This spending item is part of a $1,959,505 allocation.
See details
|
Smithsonian Institution | 10/15/2009 |
POTOMAC ABATEMENT, INC. | $1,012,000 |
General Contracting, demolition, Hazmat removal
This spending item is part of a $3,686,421 allocation.
See details
|
Smithsonian Institution | 9/30/2009 |
SEVERN ASSOCIATES, LLC | $701,863 |
Providing all of the supervision, labor, material, and equipment tp perform construction services necessary for replacement of the roof and exterior repairs at the Lion/Tiger Complex and Research Hill Buildings, which include the Neocropsy, Biological Res
This spending item is part of a $2,703,958 allocation.
See details
|
Smithsonian Institution | 6/02/2009 |
WORCESTER EISENBRANDT, INC. | $553,000 |
Provide all labor, materials, equipment, and supervision for the restoration of the exterior masonary at the Smithsonian Institution's Arts and Industries Building (AIB)
This spending item is part of a $932,261 allocation.
See details
|
Smithsonian Institution | 6/18/2009 |
BOVIS LEND LEASE, INC. | $550,626 | Provide project management support for the Smithsonian's AIB & NZP projects relating to the Recovery Act projects | Smithsonian Institution | 4/16/2009 |
HSU DEVELOPMENT, INC. | $516,475 |
Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
BOVIS LEND LEASE, INC. | $383,728 | Provide Construction Management support services for Smithsonian's AIB ARRA Demolition & Hazmat Removal and Masonry Restoration Projects | Smithsonian Institution | 9/23/2009 |
EDIFICE GROUP, INC. | $379,262 |
Provide all labor, materials, equipment, and supervision for the restoration of the exterior masonary at the Smithsonian Institution's Arts and Industries Building (AIB)
This spending item is part of a $932,261 allocation.
See details
|
Smithsonian Institution | 6/18/2009 |
BOVIS LEND LEASE, INC. | $366,323 | Construction Management support services for Smithsonian NZP Bridge Repairs Project | Smithsonian Institution | 5/04/2009 |
CYNERGY ELECTRIC COMPANY, INC. | $355,665 |
Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
CYNERGY ELECTRIC COMPANY, INC. | $350,951 |
Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
HSU DEVELOPMENT, INC. | $294,248 |
Provide all supervision, labor, material, and equipment for Replacement of Five (5) Medium Voltage Interrupter Selector Switches and seven (7) Transformers in Six (6) Buildings located at the Smithsonian Institution's National Zoological Park, Washington
This spending item is part of a $1,000,865 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
DJB CONTRACTING, INCORPORATED | $254,210 |
NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation.
See details
|
Smithsonian Institution | 8/17/2009 |
PHOENIX FIRE PROTECTION, INC. | $228,549 |
Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
HELLER ELECTRIC COMPANY, INC. | $223,447 |
Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
SAS VENTURES, INC. | $114,832 |
Provide all supervision, labor, material and equipment for Removal and Replacement of the Fire Protection in the Visitor Center and the Propagation Buildings & Boiler Plant
This spending item is part of a $1,083,303 allocation.
See details
|
Smithsonian Institution | 6/05/2009 |
M. D. MILLER CO., INC. | $58,993 |
To provide supervision, labor, equipment and materials required to Repair the three (3) Bridges at the National Zoological Park (NZP). Washington DC
This spending item is part of a $1,959,505 allocation.
See details
|
Smithsonian Institution | 10/15/2009 |
SMITHGROUP, INC. | $56,479 | Recovery funds- Arts & Industries Bldg Phase 1 Demolition and Hazmat Removal Construction Phase Services | Smithsonian Institution | 6/26/2009 |
ATLANTIC REFINISHING & RESTORATION, INC | $50,253 |
NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation.
See details
|
Smithsonian Institution | 8/17/2009 |
SMITHGROUP, INC. | $39,331 | Recovery funds- Arts & Industries Bldg Masonry Repairs Construction Phase Services | Smithsonian Institution | 7/09/2009 |
Gales Warning Charters, Inc. | $10,060 |
NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation.
See details
|
Smithsonian Institution | 8/17/2009 |
ARAMIS CONSTRUCTION, INC. | $4,500 |
NZP Rock Creek Police Station and Outlying buildings
This spending item is part of a $323,008 allocation.
See details
|
Smithsonian Institution | 8/17/2009 |
Waypoint Contracting Services, LLC | $3,200 |
Providing all of the supervision, labor, material, and equipment tp perform construction services necessary for replacement of the roof and exterior repairs at the Lion/Tiger Complex and Research Hill Buildings, which include the Neocropsy, Biological Res
This spending item is part of a $2,703,958 allocation.
See details
|
Smithsonian Institution | 6/02/2009 |