District of Columbia County, D.C., funds by Transportation, Department of
Listing $2,193,918,041.16 in stimulus funds from Transportation, Department of for District of Columbia
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NATIONAL RAILROAD PASSENGER CORPORATION | $1,295,804,688 | National Railroad Passenger Corporation Grants The Grantee shall furnish all personnel, facilities, equipment, and other materials and services (except as otherwise specified in the grant) necessary to implement a series of individual capital projects with priority for those projects that repair, reheha... Show more | Federal Railroad Administration | 3/19/2009 |
NATIONAL RAILROAD PASSENGER CORPORATION | $449,944,000 | High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants American Recovery and Reinvestment Act of 2009 project for Amtrak G?? NEC Power, Signal, Track, Catenary Improvements provides $450 million to boost capacity, reliability, and speed in one of the most heavily-t-traveled sections of the Northeast Corridor, c... Show more | Federal Railroad Administration | 8/18/2011 |
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | $184,083,396 | Federal Transit_Formula Grants The Washington Metropolitan Area Transit Authority (Metro) Capital Transit Recovery Act grant will invest in public transportation through the following: - Purchase of 47 low-floor hybrid buses and 74 paratransit vans and related equipment to meet the su | Federal Transit Administration | 7/31/2009 |
NATIONAL RAILROAD PASSENGER CORPORATION | $36,000,000 |
High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants The Pennsylvania Department of Transportation will reconstruct the State Interlocking outside of the Harrisburg Train Station. The project includes the completion of final design and the construction of track,k, electric traction, signal, and civil site wo... Show more
This spending item is part of a $40,000,000 allocation.
See details
|
Federal Railroad Administration | 9/30/2011 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $25,823,005 | Highway Planning and Construction 'Bridge Construction','The project includes the demolition and reconstruction of the existing New York Avenue Bridge over the railraod.' | Federal Highway Administration | 9/24/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $19,553,626 | Highway Planning and Construction 'Streetscape Construction','Reconstruction and streetscape improvements of 6.5 lane miles of Pennsylvania Avenue' | Federal Highway Administration | 5/20/2009 |
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | $17,749,826 | Federal Transit_Capital Investment Grants This award will allow the Washington Metropolitan Area Transit Authority to invest in public transportation by: - Executing and implementing a track pad/shock absorber rehabilitation program. - Purchasing and installing emergency tunnel carts and storage | Federal Transit Administration | 6/10/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $13,836,556 | Highway Planning and Construction The work consists of resurfacing roadways along various locations, citywide. In areas of existing asphalt concrete surface, the work will consists of pavement milling to a depth of one (1) to two (2) inches, cleaning and routing of deteriorated pavement | Federal Highway Administration | 2/02/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $13,091,190 |
Surface Transportation _ Discretionary Grants for Capital Investment. The TIGER grant will allow the National Capital region to invest in public transportation by implementing a regional network of priority bus corridors and construction of a multimodal transit center. Improvements in bus transportatation will occur along pri... Show more
This spending item is part of a $58,838,000 allocation.
See details
|
Federal Transit Administration | 12/30/2010 |
DELOITTE CONSULTING LLP | $12,585,425 | Provide assistance consisting of mission-oriented business consulting services in support of FRA's Office of Passenger and Freight Programs, with a specific focus on advising FRA in the establishment of a grants management program that is commensurate wit | Federal Railroad Administration | 3/13/2009 |
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | $11,068,550 |
Surface Transportation _ Discretionary Grants for Capital Investment. The TIGER grant will allow the National Capital region to invest in public transportation by implementing a regional network of priority bus corridors and construction of a multimodal transit center. Improvements in bus transportatation will occur along pri... Show more
This spending item is part of a $58,838,000 allocation.
See details
|
Federal Transit Administration | 12/30/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $9,201,213 | Highway Planning and Construction Great Streets project Nannie Helen Burroughs NE from Minnesota Ave to Eastern Ave. Streetscape improvements, construction improvements to sidewalks, curbs, gutters, streets, tree boxes, replace street trees and install other streetscape elements. | Federal Highway Administration | 8/25/2010 |
METRO PAVING CORPORATION | $7,101,860 | The project consists of reconstructing,rehabilitating,and resurfacing approximately 1.2 miles of Rock Creek and Potomac Parkway.The limits of construction for this project designated as PRA-ROCR 3A6 extend from Beach Drive to the P Street Bridge.The work | Federal Highway Administration | 8/11/2010 |
DISTRICT OF COLUMBIA GOVERNMENT | $6,611,874 | Highway Planning and Construction 'Streetscape Construction','Upgrade 25 block faces to comply with Downtown Streetscape and Streetlight regulation and promote economic development' | Federal Highway Administration | 4/27/2009 |
DELOITTE CONSULTING LLP | $6,262,681 |
The main objective of this project is to extend the work that was begun as part of the Employee Information Management program, in projects from 2005 to 2008, to provide Amtrak with a standard, reliable and extensible HR, Payroll and Time Management Syste
This spending item is part of a $6,789,594 allocation.
See details
|
National Railroad Passenger Corporation (AMTRAK) | 9/23/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $6,237,520 | Highway Planning and Construction 'Street Resurfacing',' Roadway work leading up to Eastern Avenue bridge over Kenilworth Avenue.' | Federal Highway Administration | 9/24/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $5,826,765 | Highway Planning and Construction 'Streetscape Construction','Reconstruction watermain replacement and streetscape improvements along 1.8 lane miles of a mixed use corridor connecting the Historic DuPont Circle and Strivers section neighborhoods' | Federal Highway Administration | 7/16/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $5,383,959 | Highway Planning and Construction 'Street Restoration','Resurface and rejuvenate the corridor. Improvements will provide better surfaces for pedestrians and motorists.' | Federal Highway Administration | 5/14/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $5,111,669 | Highway Planning and Construction The work consists of installation of new sidewalk or replacement of defective sidewalk along various locations citywide. The sidewalk may be concrete or brick and will be installed per DC Standards. Curb and gutter replacement work may be included if det | Federal Highway Administration | 2/02/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $4,845,806 | Highway Planning and Construction 'Streetlight Construction','Streetlighting needs upgrading on Dalecarlia Pkwy and Bladensburg Rd to improve safety' | Federal Highway Administration | 4/24/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $4,744,845 | Highway Planning and Construction 'Bridge Construction','Demolition and reconstruction of the existing Eastern Avenue bridge over Kenilworth Avenue.' | Federal Highway Administration | 9/24/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $3,629,384 | Highway Planning and Construction 'Streetscape Construction','Transportation and streetscape improvements to include sidewalk, curb and gutter, mill and overlay of street, new streetlights, traffic signals, safety improvements, infrastructure and utility coordination and upgrades, landsca | Federal Highway Administration | 9/24/2009 |
DELOITTE CONSULTING LLP | $3,438,026 | Provide assistance consisting of mission-oriented business consulting services in support of FRA's Office of Passenger and Freight Programs, with a specific focus on advising FRA in the establishment of a grants management program that is commensurate wit | Federal Railroad Administration | 9/14/2011 |
DISTRICT OF COLUMBIA GOVERNMENT | $3,000,000 | Highway Planning and Construction 'Bicycle Sharing Program','Purchase and install 40 SmartBike stations and 480 SmartBikes throughout the city' | Federal Highway Administration | 8/19/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $2,945,683 | Highway Planning and Construction 'Streetscape Construction','Roadway reconstruction and new sidewalks along 2.1 lane miles will provide a pedestrian connection to Rock Creek National Park for residents of Hawthorne and Barnaby Woods.' | Federal Highway Administration | 7/16/2009 |
HILL INTERNATIONAL, INC. | $2,941,451 |
Project Management Oversight services for the Federal Transit Administration (FTA) for ARRA funded projects. Three Work Order assignments have been received to date that include monitoring of Grantee projects in FTA Regions 3 and 4.
This spending item is part of a $3,077,340 allocation.
See details
|
Federal Transit Administration | 11/23/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $2,900,000 | The Long Bridge is a two track railroad bridge that was constructed in the late 19th and early 20th century. It carries traffic from three operators: CSX Transportation (CSXT), Amtrak, and the Virginia Railway Express (VRE) and it is the only railroad br | Federal Railroad Administration | 12/09/2011 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $2,812,250 | Highway Planning and Construction Implements citywide vehicle detection stations. Determine number of vehicles passing through various permanent count stations, occupancy, speed and classification of vehicles. | Federal Highway Administration | 7/22/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $2,593,768 | Highway Planning and Construction 'Safe Routes to School','Improve pedestrian linkages to neighborhood schools.' | Federal Highway Administration | 8/18/2009 |
METROPOLITAN WASHINGTON COUNCIL OF GOVERNMENTS | $2,335,942 |
Surface Transportation _ Discretionary Grants for Capital Investment. The TIGER grant will allow the National Capital region to invest in public transportation by implementing a regional network of priority bus corridors and construction of a multimodal transit center. Improvements in bus transportatation will occur along pri... Show more
This spending item is part of a $58,838,000 allocation.
See details
|
Federal Transit Administration | 12/30/2010 |
CAPITOL PAVING OF D.C., INC. | $2,305,696 | The overall purpose of this particular project is to widen the roadway, installation of a new sewer system and resufacing of the roadway. We expect to have a smoothh surface and maybe eleviate some traffic concerns. | Federal Highway Administration | 1/21/2010 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $1,751,132 | Highway Planning and Construction 'Uninterruptible Power to Traffic Signals','Deploy uninterruptible power supply for critical intersections to provide up to 8 hours of uninterruptible power supply at critical intersections' | Federal Highway Administration | 7/28/2009 |
INDUS CORPORATION | $1,684,838 | Analysis, Design, Development services for the Recovery Act Database System (RADS). Reporting and Tracking support for the FHWA Chief Financial Officer. Note regarding Officers Compensation Table: The amounts are annual numbers for the calendar year e | Federal Highway Administration | 5/13/2009 |
DISTRICT OF COLUMBIA, GOVERNMENT OF | $1,598,787 | Highway Planning and Construction Rehabilitation of Sherman Ave. NW from Florida to Park Road. The project involves the reconfiguration of roadway, widening of sidewalk, relocation and upgrading traffic signals, upgrading street lights, construction of new median, planting trees in the m | Federal Highway Administration | 8/04/2010 |
FINANCIAL BUSINESS SOLUTIONS, LLC | $1,225,000 | ARRA:FINANCIAL MANAGEMENT OVERSIGHT PROGRAM | Federal Transit Administration | 4/05/2011 |
SAMLIN MILLIGAN | $1,200,000 | ARRA:FINANCIAL MANAGEMENT OVERSIGHT PROGRAM | Federal Transit Administration | 4/05/2011 |
BATTELLE MEMORIAL INSTITUTE | $1,083,429 |
The purpose of this project is to assist DOT in developing and maintaining an ARRA reporting system for their grantees
This spending item is part of a $1,104,451 allocation.
See details
|
Federal Highway Administration | 6/19/2009 |
SAGRES CONSTRUCTION LLC | $1,082,971 | National Mall & Memorial Parks Project PRA-NAMA 500(2), Solicitation Number DTFH71-10-B-00020, located in Washington, D.C | Federal Highway Administration | 4/08/2010 |
DELOITTE & TOUCHE L.L.P. | $1,081,413 |
The long term objective of this program is to achieve full adoption and implementation of Identity and Access Management functionality that will: Provide the capability for new Amtrak applications to be single sign-on aware. Support Amtrak employee identi
This spending item is part of a $1,574,866 allocation.
See details
|
National Railroad Passenger Corporation (AMTRAK) | 4/05/2010 |
FORT MYER CONSTRUCTION CORPORATION | $1,055,441 |
Madison Drive. 14th to 3rd Streets, NW. Washington DC Roadway Rehabilitation. Asphalt Pavement Replacement & Improvements
This spending item is part of a $1,073,691 allocation.
See details
|
Federal Highway Administration | 9/15/2010 |
DISTRICT OF COLUMBIA GOVERNMENT | $1,000,000 | Highway Planning and Construction 'Resurfacing Construction','Roadway in critical need of resurfacing' | Federal Highway Administration | 4/24/2009 |
DMP GROUP, LLC , THE | $762,500 | Invest in public transportation by providing technical assistance and oversight in the implementation of ARRA projects by FTA receipients. | Federal Transit Administration | 5/26/2010 |
BAKER & BOTTS, L.L.P. | $585,197 | Legal advisory services in connection with the evaluation and negotiation of an application for TIFIA credit assistance | Federal Highway Administration | 5/05/2011 |
BAKER & BOTTS, L.L.P. | $584,178 | Legal advisory services in connection with the evaluation and negotiation of an application for TIFIA credit assistance | Federal Highway Administration | 3/15/2011 |
Recycled Aggregates, LLC | $515,145 |
ADD PHASE IV OF THE FAIRFAX COUNTY PARKWAY INCLUDING INTERMEDIATE AND FINAL DESIGN AND CONSTRUCTION OF BRIDGES B693 AND B694 AND RAMP D, LOOP B,AND EXTENDED BOUDINOT DRIVE
This spending item is part of a $22,800,000 allocation.
See details
|
Federal Highway Administration | 6/29/2009 |
LOCKHEED MARTIN SERVICES, INC. | $497,500 |
This project involves all services needed to implement upgrades to the Fuel Storage Tank (FST) system located at the Ronkonkoma, New York Air Route Traffic Control Center (ZNY). This project has been awarded under Contract DTFA0102C0016, Initial Modificat
This spending item is part of a $2,275,055 allocation.
See details
|
Federal Aviation Administration | 8/26/2010 |
AOC SOLUTIONS INC | $485,827 | Contractor services to support Federa Transit Administration in the improvement of internal controls and self assessment activities in compliance with Federal Managers' Financial Integrity Act (FMFIA) and OMB Circular A-123 programs. | Federal Transit Administration | 9/21/2011 |
AOC SOLUTIONS INC | $485,827 | Contractor services to support Federal Transit Administration in the improvement of internal controls and self assessment activities in compliance with the Federal Managers' Financial Integrity Act (FMFIA0 and OMB Circular A-123 programs. | Federal Transit Administration | 9/21/2011 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $452,509 |
This project is for construction inspection at various Air Route Traffic Control Centers nationwide. This project has been awarded under Contract DTFA0102C0016, Modification 755. The initial Modification was in the amount of $1,402,800. Modification No.91
This spending item is part of a $708,161 allocation.
See details
|
Federal Aviation Administration | 7/24/2009 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $407,355 |
This project is for construction management and engineering services for the upgrade, replacement, and installation of the Electrical Line Distribution (ELD) Systems at the Fort Lauderdale International Airport located in Fort Lauderdale, Florida. This pr
This spending item is part of a $1,204,335 allocation.
See details
|
Federal Aviation Administration | 5/05/2010 |
HANKS, HANKS & ASSOCIATES LLC | $395,395 | ARRA Related Acquisition Support Services for the Federal Transit Procurement Office to effectively support ARRA related contracts and to support program/technical staff in processing services/commercial requirements through the entire acquisition process | Federal Transit Administration | 8/30/2010 |
LOCKHEED MARTIN SERVICES, INC. | $361,305 |
This project is for construction management and engineering services for the upgrade, replacement, and installation of the Electrical Line Distribution (ELD) Systems at the Fort Lauderdale International Airport located in Fort Lauderdale, Florida. This pr
This spending item is part of a $1,204,335 allocation.
See details
|
Federal Aviation Administration | 5/05/2010 |
DMP GROUP, LLC , THE | $348,271 | Invest in public transportation by providing oversight of grantee compliance with Title VI requirements for ARRA-funded capital projects. | Federal Transit Administration | 9/23/2010 |
PARSONS GOVERNMENT SERVICES INC. | $333,000 | This project involves environmental services to support air quality monitoring during asbestos abatement activities at CERAP San Juan, Puerto Rico. This project has been awarded under Contract DTFA0102C0016. Lockheed Martin Services,Inc. (L-M), Parsons' p | Federal Aviation Administration | 5/02/2012 |
HANKS, HANKS & ASSOCIATES LLC | $305,741 | ARRA Acquisition Support the purpose of this acquisition is to provide professional acquisition support services for the Office of Procurement in support of its critical mission requirements emanating for the additional ARRA related funded contracts and t | Federal Transit Administration | 4/05/2011 |
LOCKHEED MARTIN SERVICES, INC. | $303,391 |
This project has been awarded under Contract DTFA0102C0016, Modification 723. The Modification is in the amount of $4,245,000 and is with associated the removal and replacement of various aging and unreliable window-mounted and wall-mounted air conditioni
This spending item is part of a $1,011,304 allocation.
See details
|
Federal Aviation Administration | 5/15/2009 |
BOOZ ALLEN HAMILTON INC. | $303,157 |
Due to the ARRA, the TEAM-WEB application will have to undergo system modifications as identified and defined by FTA, then approved via Work Authorization. The newest amendment added $200,000 (3/23/2011) in possible additional funding to the original $60,
This spending item is part of a $680,000 allocation.
See details
|
Federal Transit Administration | 8/05/2010 |
HANKS, HANKS & ASSOCIATES LLC | $258,950 | ARRA Professional Acquisition Support to Department of Transportation for the Office of Civil Rights. | Federal Transit Administration | 3/22/2011 |
LOCKHEED MARTIN SERVICES, INC. | $255,652 |
This project is for construction inspection at various Air Route Traffic Control Centers nationwide. This project has been awarded under Contract DTFA0102C0016, Modification 755. The initial Modification was in the amount of $1,402,800. Modification No.91
This spending item is part of a $708,161 allocation.
See details
|
Federal Aviation Administration | 7/24/2009 |
LOCKHEED MARTIN SERVICES, INC. | $246,741 |
This project has been awarded under Contract DTFA0102C0016, Modification 723. The Modification is in the amount of $4,245,000 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-mounted air conditioni
This spending item is part of a $986,963 allocation.
See details
|
Federal Aviation Administration | 5/15/2009 |
FINANCIAL BUSINESS SOLUTIONS, LLC | $242,711 | ARRA:FINANCIAL MANAGEMENT OVERSIGHT PROGRAM | Federal Transit Administration | 3/07/2011 |
SAMLIN MILLIGAN | $242,711 | ARRA:FINANCIAL MANAGEMENT OVERSIGHT PROGRAM | Federal Transit Administration | 2/25/2011 |
SAMLIN MILLIGAN | $242,711 | ARRA: FINANCIAL MANAGEMENT OVERSIGHT PROGRAM | Federal Transit Administration | 2/25/2011 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $188,031 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.632 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-moun
This spending item is part of a $305,649 allocation.
See details
|
Federal Aviation Administration | 5/17/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $187,499 | Develop and execute grant accrual and estimated liability methodology for Recovery Act funds. | Federal Highway Administration | 9/11/2009 |
BAKER & BOTTS, L.L.P. | $156,380 | Legal advisory services in connection with the evaluation and negotiation of an application for TIFIA cedit assistance on Texas State Highway 161 Project. | Federal Highway Administration | 5/17/2010 |
BAKER & BOTTS, L.L.P. | $156,380 | Legal advisory services in connection with the evaluation and negotiation of an application for TIFIA credit assistance | Federal Highway Administration | 5/17/2010 |
DMP GROUP, LLC , THE | $150,490 | Invest in public transportation by providing technical assistance and training in the implementation of ARRA projects by State DOTs. | Federal Transit Administration | 3/23/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $136,170 | This project is comprised of four main tasks:G?? Task 1 G?? Analysis of Data and Accrual Preparation for Recovery Act and Discretionary TIGER Grants G?? Task 2 G?? Development of an Auditable Methodology G?? Task 3 G?? Functional Testing and Validation U | Federal Highway Administration | 9/24/2010 |
LOCKHEED MARTIN SERVICES, INC. | $117,618 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.632 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-moun
This spending item is part of a $305,649 allocation.
See details
|
Federal Aviation Administration | 5/17/2010 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $113,674 | This project is comprised of four main tasks:G?? Task 1 G?? Analysis of Data and Accrual Preparation for Recovery Act and Discretionary TIGER Grants G?? Task 2 G?? Development of an Auditable Methodology G?? Task 3 G?? Functional Testing and Validation U | Federal Highway Administration | 9/23/2011 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $109,080 |
This project has been awarded under Contract DTFA0102C0016, Modification 723. The Modification is in the amount of $4,245,000 and is with associated the removal and replacement of various aging and unreliable window-mounted and wall-mounted air conditioni
This spending item is part of a $464,499 allocation.
See details
|
Federal Aviation Administration | 5/15/2009 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $100,790 |
This project involves design for the Electric Line Distribution upgrades at the following airports: Dallas Love Field Airport located in Dallas, Texas; Houston-Hobby International Airport located in Houston, Texas; and Kansas City International Airport lo
This spending item is part of a $200,482 allocation.
See details
|
Federal Aviation Administration | 6/15/2009 |
INTERNATIONAL BUSINESS MACHINES CORPORATION | $100,255 | Under this award, the Contractor shall furnish the following: Task 1: Calculate Grant Accrual for three quarters and perform data analysis and accrual preparation for the Recovery Act, including discretionary TIGER Grants Task 2: Develop an auditable me | Federal Highway Administration | 6/26/2012 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $100,195 |
This project has been awarded under Contract DTFA0102C0016, Modification 849. The Modification is in the amount of $150,000 and is associated with site surveys and planning for the removal and replacement of various aging and unreliable window-mounted and
This spending item is part of a $145,195 allocation.
See details
|
Federal Aviation Administration | 3/31/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $94,387 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.632 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-moun
This spending item is part of a $159,404 allocation.
See details
|
Federal Aviation Administration | 7/27/2010 |
DMP GROUP, LLC , THE | $93,500 | Invest in public transportation by providing oversight of grantee compliance with EEO requirements for ARRA-funded capital projects. | Federal Transit Administration | 4/08/2011 |
NATIONAL ASSOCIATES, INC. | $92,698 | TEMPORARY HELP | Federal Highway Administration | 9/24/2010 |
MCNEAL PROFESSIONAL SERVICES, INC. | $72,000 | ARRA Professional Acquisition Support Services | Federal Transit Administration | 2/17/2011 |
LOCKHEED MARTIN SERVICES, INC. | $65,017 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.632 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-moun
This spending item is part of a $159,404 allocation.
See details
|
Federal Aviation Administration | 7/27/2010 |
LOCKHEED MARTIN SERVICES, INC. | $65,017 |
This project has been awarded under Contract DTFA0102C0016, Modification 848. The Modification is in the amount of $190,515 of which $130,000 has been allocated for this project. The purpose of the project is to provide engineering designs for the upgrade
This spending item is part of a $108,402 allocation.
See details
|
Federal Aviation Administration | 3/31/2010 |
LOCKHEED MARTIN SERVICES, INC. | $61,172 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.63 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-mount
This spending item is part of a $178,792 allocation.
See details
|
Federal Aviation Administration | 5/17/2010 |
LOCKHEED MARTIN SERVICES, INC. | $61,172 |
This project has been awarded under Contract DTFA0102C0016, Modification 910. The total Modification is in the amount of $2,080,700 of which $918,360.40 has been allocated for this project. The purpose of this project is to provide on-site engineering sup
This spending item is part of a $565,279 allocation.
See details
|
Federal Aviation Administration | 8/10/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $52,065 |
This project is for construction management and inspection services for an FAA awarded construction contract for upgrades to the Electric Line Distribution system at the Portland International Airport located in Portland, Oregon. This project has been awa
This spending item is part of a $74,565 allocation.
See details
|
Federal Aviation Administration | 2/25/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $49,154 |
This project involves all services needed to implement upgrades to the Fuel Storage Tank (FST) system located at the Ronkonkoma, New York Air Route Traffic Control Center (ZNY). This project has been awarded under Contract DTFA0102C0016, Initial Modificat
This spending item is part of a $2,275,055 allocation.
See details
|
Federal Aviation Administration | 8/26/2010 |
NATIONAL ASSOCIATES, INC. | $46,349 | TEMPORARY HELP | Federal Highway Administration | 9/24/2010 |
NATIONAL ASSOCIATES, INC. | $46,349 | TEMPORARY HELP | Federal Highway Administration | 9/24/2010 |
LOCKHEED MARTIN SERVICES, INC. | $45,000 |
This project involves construction of the Runway 31 MALSR located at the Northeast Georgia Regional Airport located in Winder, Georgia. This project has been awarded under Contract DTFA0102C0016, Modification 725. The Modification is in the amount of $769
This spending item is part of a $619,000 allocation.
See details
|
Federal Aviation Administration | 6/15/2009 |
LOCKHEED MARTIN SERVICES, INC. | $45,000 |
This project involves design for the Electric Line Distribution upgrades at the following airports: Dallas Love Field Airport located in Dallas, Texas; Houston-Hobby International Airport located in Houston, Texas; and Kansas City International Airport lo
This spending item is part of a $200,482 allocation.
See details
|
Federal Aviation Administration | 6/15/2009 |
LOCKHEED MARTIN SERVICES, INC. | $45,000 |
This project has been awarded under Contract DTFA0102C0016, Modification 849. The Modification is in the amount of $150,000 and is associated with site surveys and planning for the removal and replacement of various aging and unreliable window-mounted and
This spending item is part of a $145,195 allocation.
See details
|
Federal Aviation Administration | 3/31/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $44,729 |
This project has been awarded under Contract DTFA0102C0016, Modification 723. The Modification is in the amount of $4,245,000 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-mounted air conditioni
This spending item is part of a $986,963 allocation.
See details
|
Federal Aviation Administration | 5/15/2009 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $43,385 |
This project has been awarded under Contract DTFA0102C0016, Modification 848. The Modification is in the amount of $190,515 of which $130,000 has been allocated for this project. The purpose of the project is to provide engineering designs for the upgrade
This spending item is part of a $108,402 allocation.
See details
|
Federal Aviation Administration | 3/31/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $22,928 |
This project has been awarded under Contract DTFA0102C0016, Modification 723. The Modification is in the amount of $4,245,000 and is with associated the removal and replacement of various aging and unreliable window-mounted and wall-mounted air conditioni
This spending item is part of a $1,011,304 allocation.
See details
|
Federal Aviation Administration | 5/15/2009 |
LOCKHEED MARTIN SERVICES, INC. | $22,500 |
This project is for construction management and inspection services for an FAA awarded construction contract for upgrades to the Electric Line Distribution system at the Portland International Airport located in Portland, Oregon. This project has been awa
This spending item is part of a $74,565 allocation.
See details
|
Federal Aviation Administration | 2/25/2010 |
MACROSYS, LLC | $21,022 |
The purpose of this project is to assist DOT in developing and maintaining an ARRA reporting system for their grantees
This spending item is part of a $1,104,451 allocation.
See details
|
Federal Highway Administration | 6/19/2009 |
IVIS PSC INC | $20,887 | Administrative Support Clerk to perfrom a wide range of duties and responsibilities, to include filing, reporting, inspection of files, organizing materials, reviewing incoming materials, classifyings or sorting information, tracking materials, performing | Federal Highway Administration | 4/17/2009 |
DC Line Inc | $18,250 |
Madison Drive. 14th to 3rd Streets, NW. Washington DC Roadway Rehabilitation. Asphalt Pavement Replacement & Improvements
This spending item is part of a $1,073,691 allocation.
See details
|
Federal Highway Administration | 9/15/2010 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $10,687 |
This project has been awarded under Contract DTFA0102C0016, Modification 873 and 903. The total Modification is in the amount of $1,012,972.63 and is associated with the removal and replacement of various aging and unreliable window-mounted and wall-mount
This spending item is part of a $178,792 allocation.
See details
|
Federal Aviation Administration | 5/17/2010 |
DELOITTE CONSULTING LLP | $5,628 | The Contractor shall provide non-personal, professional support services for the Dept. of Transportation (DOT) internal control (Office of Management & Budget (OMB) Circular A-123, Appendix A) transaction-level testing for Fiscal Year 2010 under the Ameri | Federal Highway Administration | 7/08/2010 |
DELOITTE CONSULTING LLP | $4,717 | Conduct A-123, Appendix A subsequent testing for transactional level testing. The contractor will prepare detailed test plans/scripts and conduct transaction level testing, while developing and issuing exception memos for any noted deficiencies. | Federal Highway Administration | 7/24/2009 |
CGH TECHNOLOGIES, INC. | $3,429 |
Support ATO-E, En Route efforts to monitor and support ongoing ARRA activites at 18 Air Route Traffic Control enters (ARTCCs). Perform monthly invoice audits for the ARTCC ARRA projects presently underway. Perform construction site inspections for each
This spending item is part of a $117,745 allocation.
See details
|
Federal Aviation Administration | 9/23/2010 |
DISTRICT OF COLUMBIA GOVERNMENT | $0 | Highway Planning and Construction 'Citywide Sidewalks - filling the gaps','Complete missing sidewalk connections to create a safer pedestrian network.' | Federal Highway Administration | 6/11/2009 |
DELOITTE CONSULTING LLP | $0 |
Provide program management oversight and support, and transaction testing related to support for increased oversight of American Recovery and Reinvestment Acts Grants by the Federal Aviation Administration.
This spending item is part of a $654,261 allocation.
See details
|
Federal Aviation Administration | 9/14/2009 |
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. | $0 |
This project involves environmental services to support air quality monitoring during asbestos abatement activities at air traffic facilities nationwide. This project has been awarded under Contract DTFA0102C0016, Modification 791. The initial Modificatio
This spending item is part of a $849,074 allocation.
See details
|
Federal Aviation Administration | 12/08/2009 |