Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Champaign County, Ill., funds by General Services Administration

Listing $1,308,614.35 in stimulus funds from General Services Administration for Champaign

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
RELIABLE CONTRACTING GROUP, LLC $1,118,874 This project includes but is not limited to the following work: Implementation of Energy Conservation Measures as recommended in the Re-Commissioning/Retro-Commissioning Report for this facility. These measures include: Replacement of existing air-cool Public Buildings Service 12/09/2009
KJWW, P.C $80,040 Architecture and Engineering Services
This spending item is part of a $104,951 allocation. See details
Public Buildings Service 7/24/2009
BAILEY EDWARD DESIGN, INC. $39,635 Bailey Edward architecture has been contracted to perform post construction award phase services including architectural and engineering construction management and inspection.
This spending item is part of a $57,923 allocation. See details
Public Buildings Service 2/11/2010
BAILEY EDWARD DESIGN, INC. $24,911 Architecture and Engineering Services
This spending item is part of a $104,951 allocation. See details
Public Buildings Service 7/24/2009
KJWW, P.C $18,550 Bailey Edward architecture has been contracted to provide construction phase services for the commissioning of the Federal Building and US Courthouse in Urbana, IL.
This spending item is part of a $26,867 allocation. See details
Public Buildings Service 3/31/2010
KJWW, P.C $18,288 Bailey Edward architecture has been contracted to perform post construction award phase services including architectural and engineering construction management and inspection.
This spending item is part of a $57,923 allocation. See details
Public Buildings Service 2/11/2010
BAILEY EDWARD DESIGN, INC. $8,316 Bailey Edward architecture has been contracted to provide construction phase services for the commissioning of the Federal Building and US Courthouse in Urbana, IL.
This spending item is part of a $26,867 allocation. See details
Public Buildings Service 3/31/2010