Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Clinton County, Iowa, funds by Transportation, Department of

Listing $5,798,095.83 in stimulus funds from Transportation, Department of for Clinton

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CLINTON, CITY OF $2,090,187 Highway Planning and Construction This ARRA project will construct part of a new rail based industrial park being developed by the Clinton Regional Development Corporation. Rail construction includes: construction of a 10,000 feet passing track and runaround track on Union Pacific ROW; a Federal Highway Administration 12/14/2009
CLINTON, CITY OF $1,665,334 Formula Grants for Other Than Urbanized Areas Supprt of public transportation: Funding is provided for transit capital improvements in non-urbanized areas throughout Iowa
This spending item is part of a $15,156,406 allocation. See details
Federal Transit Administration 3/05/2009
CLINTON, CITY OF $815,053 Highway Planning and Construction Clinton County is extending 19th Avenue, approximately 1.9 miles, in the city of Clinton, Iowa, from Mill Creek Parkway east to Springdale Drive. The project is a new 4-lane Portland Cement Concrete (PCC) urban roadway with median and sidewalks. Federal Highway Administration 9/04/2009
TRANSPORTATION, IOWA DEPT OF $524,593 Highway Planning and Construction This project will provide an improved driving surface and extend the life of the pavement by applying a hot mix asphalt overlay with cold-in-place recycling on approximately 10.7 miles of County Route Y70 and County Route Z2E from the town of De Witt to I Federal Highway Administration 3/19/2009
CLINTON, CITY OF $332,421 Formula Grants for Other Than Urbanized Areas Supprt of public transportation: Funding is provided for transit capital improvements in non-urbanized areas throughout Iowa
This spending item is part of a $15,156,406 allocation. See details
Federal Transit Administration 3/05/2009
DE WITT, CITY OF $201,885 Highway Planning and Construction De Witt Iowa on 11th Street from 6th Avenue to Humeston Road. The roadway will be milled and overlaid with two inches of hot-mix asphalt which will provide a smoother ride. Selected sidewalk ramps and curbs at intersections will also be updated as a par Federal Highway Administration 3/24/2009
CAMANCHE, CITY OF $168,623 Highway Planning and Construction Camanche, Iowa on Washington Boulevard from US 67 to 22nd Avenue. The project consists of pavement rehabilitation which will provide a smoother ride and improved drainage. Federal Highway Administration 11/13/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction This ARRA project will construct part of a new rail based industrial park being developed by the Clinton Regional Development Corporation. Rail construction includes: construction of a 10,000 feet passing track and runaround track on Union Pacific ROW; a
This spending item is part of a $2,090,187 allocation. See details
Federal Highway Administration 12/14/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction De Witt Iowa on 11th Street from 6th Avenue to Humeston Road. The roadway will be milled and overlaid with two inches of hot-mix asphalt which will provide a smoother ride. Selected sidewalk ramps and curbs at intersections will also be updated as a par
This spending item is part of a $201,885 allocation. See details
Federal Highway Administration 3/24/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction Camanche, Iowa on Washington Boulevard from US 67 to 22nd Avenue. The project consists of pavement rehabilitation which will provide a smoother ride and improved drainage.
This spending item is part of a $168,623 allocation. See details
Federal Highway Administration 11/13/2009
TRANSPORTATION, IOWA DEPT OF $0 Highway Planning and Construction Clinton County is extending 19th Avenue, approximately 1.9 miles, in the city of Clinton, Iowa, from Mill Creek Parkway east to Springdale Drive. The project is a new 4-lane Portland Cement Concrete (PCC) urban roadway with median and sidewalks.
This spending item is part of a $815,053 allocation. See details
Federal Highway Administration 9/04/2009