Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Jefferson County, Ky., funds by Interior, Department of

Listing $1,750,706.48 in stimulus funds from Interior, Department of for Jefferson

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CALDWELL TANKS, INC. $796,057 Fabricate and install of a new elevated steel water storage tank tower .The new tower will be connected to the existing water distribution and treatment system. The project also includes the demolition, removal and disposition of the existing steel water
This spending item is part of a $1,550,087 allocation. See details
Indian Affairs (Assistant Secretary) 9/24/2009
ISCO INDUSTRIES, LLC $404,455 Purchase of a Hydraulic Dredge -YUMA
This spending item is part of a $4,094,400 allocation. See details
Bureau of Reclamation 6/29/2010
PAI OF KENTUCKY, INC. $142,185 Provide engineering services required for the development of construction plans, specification and estimate (PS&E) to facilitate new construction of 0.15 miles of BIA Route 2505-10 & 0.12 miles of BIA Route 6034-30 on the Wampanoag Indian Reservation. Indian Affairs (Assistant Secretary) 4/09/2010
PAI OF KENTUCKY, INC. $97,565 Provide engineering services required for the development of construction plans, specification and estimate (PS&E) to facilitate new construction of 0.15 miles of BIA Route 2505-10 & 0.12 miles of BIA Route 6034-30 on the Wampanoag Indian Reservation.
This spending item is part of a $142,185 allocation. See details
Indian Affairs (Assistant Secretary) 4/09/2010
PAI OF KENTUCKY, INC. $84,191 1. CLOMR Application/Analysis and FEMA Coordination. a. Completed application forms. b. Narrative on project and submittal. c. Hydrologic Computations along with digital files of computer models. d. Hydraulic Computations along with digita
This spending item is part of a $125,594 allocation. See details
Indian Affairs (Assistant Secretary) 4/09/2010
TEAM HENRY ENTERPRISES, LLC $63,453 Demolition of streamgages and cableways.
This spending item is part of a $101,395 allocation. See details
Geological Survey 3/19/2010
PAI OF KENTUCKY, INC. $63,091 1. Planning, Surveying, and Mapping for the design of Rivercrest Road Phase II. 2. Superstructure and Pier Design. 3. Additional Plan Preparation for Separate Plan Set. 4. Additional Geotechnical Investigations required for the pier.
This spending item is part of a $125,594 allocation. See details
Indian Affairs (Assistant Secretary) 4/09/2010
THUNDER DISASTER SERVICES, INC. $37,942 Demolition of streamgages and cableways.
This spending item is part of a $101,395 allocation. See details
Geological Survey 3/19/2010
TEAM HENRY ENTERPRISES, LLC $22,791 Demolition of streamgages and cableways.
This spending item is part of a $42,095 allocation. See details
Geological Survey 3/19/2010
THUNDER DISASTER SERVICES, INC. $19,304 Demolition of streamgages and cableways.
This spending item is part of a $42,095 allocation. See details
Geological Survey 3/19/2010
Insuramax, Inc $11,400 REPLACE BOARDWALK AT LINCOLN'S BIRTHPLACE
This spending item is part of a $146,202 allocation. See details
National Park Service 4/26/2010
NEILL-LAVIELLE SUPPLY COMPANY LLC $8,272 lot steel products National Park Service 11/10/2009