Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Essex County, Mass., funds by Transportation, Department of

Listing $43,392,179.75 in stimulus funds from Transportation, Department of for Essex

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MASSACHUSETTS, COMMONWEALTH OF $7,381,521 Highway Planning and Construction SALEM- RECONSTRUCTION OF ROUTE 1A (BRIDGE STREET) FROM THE BEVERLY/SALEM BRIDGE TO WASHINGTON STREET (6000 FT.) This project proposes to reconstruct Bridge Street (Route 1A) from the Beverly Salem Bridge to Washington Street. The project includes, si Federal Highway Administration 9/19/2009
MERRIMACK VALLEY REGIONAL TRANSIT AUTHORITY $7,202,661 Federal Transit_Formula Grants Invest in public transportation through the renovation to the MVRTA's only office/maintenace facility which will result in replacement of existing heating and electric systems with more energy efficient systems and the installation of solar power and adde Federal Transit Administration 7/17/2009
MERRIMACK VALLEY REGIONAL TRANSIT AUTHORITY $7,202,661 Federal Transit_Formula Grants Invest in public transportationThe renovation to the MVRTA's only office/maintenace facility which will result in replacement of existing heating and electric systems with more energy efficient systems and the installation of solar power and added office Federal Transit Administration 7/17/2009
MASSACHUSETTS, COMMONWEALTH OF $5,815,091 Highway Planning and Construction LYNNFIELD- WAKEFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT WALNUT STREET & I-95, SALEM STREET & AUDUBON ROAD AT I-95 The project includes realignment and signal installation at the following locations; Walnut Street at I-95 Southbound Ramps and Federal Highway Administration 1/25/2010
MASSACHUSETTS, COMMONWEALTH OF $3,958,204 Highway Planning and Construction NEWBURYPORT- PARK & RIDE EXPANSION The proposed expansion of the Newburyport Park & Ride facility will add 105 parking spaces. Work will include the construction of a soil nail retaining wall, upgrades to the existing lighting, as well as new lighting Federal Highway Administration 6/11/2009
MASSACHUSETTS, COMMONWEALTH OF $2,522,939 Highway Planning and Construction LAWRENCE- BRIDGE BETTERMENT, L-04-009, HAMPSHIRE STREET OVER SPICKET RIVER The project consists of replacing the existing structure with a prestressed box beam and concrete deck superstructure set on top of integral abutments in the same approximate f Federal Highway Administration 8/04/2009
MASSACHUSETTS, COMMONWEALTH OF $2,481,065 Highway Planning and Construction DANVERS- PEABODY- RESURFACING & RELATED WORK ON ROUTE 114 Resurfacing the pavement and related work on Route 114 from Route 1 in Danvers to Route 128 in Peabody for an approximate project length of 2.078 miles. Federal Highway Administration 2/08/2010
LAWRENCE, CITY OF $1,294,682 Airport Improvement Program Airport wide pavement repairs and marking (painting) to include Runway 14/32, Taxiways, and Aprons. Federal Aviation Administration 9/28/2010
LAWRENCE, CITY OF $1,294,682 Airport Improvement Program Cracks with a width greater than one inch will be cut 18 inches on center, the old asphalt will be removed and the hole/trench will be filled with new asphalt and rolled smooth. Cracks with a width of less than one inch will be filled with a rubberized c Federal Aviation Administration 9/28/2010
BEVERLY MUNICIPAL AIRPORT $796,049 Airport Improvement Program Reconstruct Taxiway Foxtrot (35' x 2,100') and install new taxiway edge lighting system Federal Aviation Administration 6/01/2009
MASSACHUSETTS, COMMONWEALTH OF $740,829 Highway Planning and Construction The proposed project consists of roadway resurfacing, new curb with cement concrete sidewalks, wheelchair ramps, geometric improvements at intersections, new signing and pavement markings, new signalized intersection to improve safety and efficiency,? dra Federal Highway Administration 7/12/2010
MERRIMACK VALLEY REGIONAL TRANSIT AUTHORITY $720,266 Federal Transit_Formula Grants Invest in Public Transportation through the construction of a Transportation Center in the City of Amesbury which will include a 2 floor building and related site work. The building will include municipal uses such as the Council on Aging, youth and veter Federal Transit Administration 4/09/2010
NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY $700,000 High-Speed Rail Corridors and Intercity Passenger Rail Service ? Capital Assistance Grants The Downeaster MBTA Track Improvement Project is intended to alleviate congestion on the portion of the Massachusetts Bay Transportation Authority (MBTA) line used by the Downeaster, of which a significant port... Show more
This spending item is part of a $20,822,341 allocation. See details
Federal Railroad Administration 9/22/2011
CAPE ANN TRANSPORTATION AUTHORITY $676,150 Recovery Act of 2009: Capital Improvement and Maintenance Purchase of 2 replacement 30' transit vehicles Federal Transit Administration 3/31/2009
LAWRENCE, CITY OF $537,765 Airport Improvement Program Cracks repair to runway 05/23. Any crack with a width greater than one inch will be cut 18 inches on center, the old asphalt will be removed and the hole/trench will be filled with new asphalt and rolled smooth. Any crack with a width of less than one i Federal Aviation Administration 5/28/2009
CAPE ANN TRANSPORTATION AUTHORITY $67,615 Federal Transit_Formula Grants Purchase of 1 replacement 30' transit vehicle Federal Transit Administration 3/31/2009