How We Compiled Our Data. Visit our Eye on the Stimulus blog. Data current as of March 2010.
Goodhue County, Minn.| U.S. | Minnesota | Goodhue | ||
|---|---|---|---|---|
| Population | 304,059,724 | 5,220,393 | 45,897 | |
| Total recovery funding | $312,735,579,044 | $5,566,178,844 | $52,527,609 | |
| Direct to County | $290,999,413,356 | $5,104,479,830 | $52,527,609 | |
| County Funds per Capita | $957 | $978 | $1,144 | |
| Unemployment (12/08) |
7.4 | 6.6 | 7.0 | |
| Unemployment (12/09) |
10 | 7.4 | 7.2 | |
| Median Household Income | $50,007 | $55,616 | $55,098 | |
| Poverty Rate | 13.3% | 9.6% | 7.9% |
Stimulus contracts, grants and loans in Goodhue County, Minn.
Data last updated on March 2010.
We will have CSV files of this data available for download shortly. Want to be notified? Sign up here.
Note: County-level data does not include tax cuts, Medicaid, unemployment benefits or food stamps. There still may be overrepresentation of money going to counties where capitals are located because in some cases, awards to state agencies did not indicate that they were to be used statewide.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
| Recipient | Amount | Type | Description | Federal Dept./Agency | Date | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EDWARD KRAEMER & SONS INC | $26,910,860.00 | Contract | As a part of construction on Lock and Dam # 3 Navigational Improvements Project the existing lock guidewall will be extended 862 ft, with channel dredging and sand fill placement and associated navigation improvements. A closure dike and cap rock placement will be placed in the navigational channel..... Show more | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 | ||||||||||||||
| Zumbrota Super America | $2,000,000.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| GOODHUE, COUNTY OF | $1,784,727.00 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grant: Areas with Population equal to or less than 200K
This spending item is part of a $1,784,730.00 allocation. See details |
Transportation Department / Federal Highway Administration | 4/09/2009 | ||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $1,500,000.00 | Grant |
Homelessness Prevention and Rapid Re-Housing Program (Recovery Act Funded) Homelessness Prevention and Rapid Re-Housing Program: The purpose is to provide financial assistance and services to either prevent individuals and families from becoming homeless or help those who are experiencing homelessnesss to become quickly re-housed and stabilized. The State of Minnesota expects to prevent homelessness for 1,700 households and end homelessness for 800 households in the period October 1, 2009 through September 30, 2011. HPRP subgrantees (nonprofits and local units of government) will be providing a combination of financial assistance and services to individuals and families who are homeless or about to become homeless.... Show more
This spending item is part of a $10,865,200.00 allocation. See details |
Housing and Urban Development Department / Community Planning and Development | 7/13/2009 | ||||||||||||||
| GOODHUE CO EDUCATION DISTRICT-6051 | $1,401,896.85 | Grant |
Special Education Grants to States, Recovery Act Assist states in providing special education and related services to children with disabilities in accordance with Part B of the IDEA.
This spending item is part of a $189,839,000.00 allocation. See details |
Education Department / Office of Special Education and Rehabilitative Services | 4/01/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $1,374,977.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| OneSource.CC, Inc. | $1,200,000.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| MULTIPLE RECIPIENTS | $1,161,558.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $1,148,250.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $1,107,722.00 | Grant |
Weatherization Assistance for Low-Income Persons Recovery Act - Weatherization Formula Grants - Low-Income Households
This spending item is part of a $131,937,000.00 allocation. See details |
Energy Department | 3/26/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $1,103,380.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| INDEPENDENT SCHOOL DISTRICT 256 | $1,100,055.19 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as, applicable, early childhood education programs and services.
This spending item is part of a $447,485,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/27/2009 | ||||||||||||||
| Vertical Limit Constuction LLC | $931,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| Red Wing Super 8 Motel | $773,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| MULTIPLE RECIPIENTS | $726,410.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $701,077.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| Cash for Clunkers Participants | $670,500.00 | Grant |
Note: Though Cash for Clunkers was not part of the original stimulus bill, $2 billion in stimulus funds were used to extend the program. |
Transportation Department / National Highway Traffic Safety Administration | |||||||||||||||
| MULTIPLE RECIPIENTS | $522,387.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| CANNON FALLS INDEPENDENT SCHOOL DIST 252 | $489,002.07 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as, applicable, early childhood education programs and services.
This spending item is part of a $447,485,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/27/2009 | ||||||||||||||
| INDEPENDENT SCHOOL DISTRICT #255 | $466,485.57 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as, applicable, early childhood education programs and services.
This spending item is part of a $447,485,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/27/2009 | ||||||||||||||
| WOODS AND WILLOWS | $350,000.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| KENYON-WANAMINGO SD 2172 | $338,854.11 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as, applicable, early childhood education programs and services.
This spending item is part of a $447,485,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/27/2009 | ||||||||||||||
| TRANSPORTATION, MINNESOTA DEPARTMENT OF | $285,193.00 | Grant | Highway Planning and Construction Highway Infrastructure Investment Grant: Available for Use in Any Area (flexible) | Transportation Department / Federal Highway Administration | 11/23/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $250,000.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN | Agriculture Department / Farm Service Agency | |||||||||||||||
| GOODHUE INDEPENDENT SCHOOL DISTRICT 253 | $246,787.34 | Grant |
State Fiscal Stabilization Fund (SFSF) - Education State Grants, Recovery Act Education Fund - for the support of public elementary, secondary, and postsecondary education and, as, applicable, early childhood education programs and services.
This spending item is part of a $447,485,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/27/2009 | ||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $238,356.00 | Grant |
ARRA - Community Services Block Grant ARRA supplemental funding for the Community Services Block Grant (CSBG) program allocates funds to a network of eligible organizations to support employment related services that create and sustain economic growth with a particular focus on people living in poverrty.... Show more
This spending item is part of a $12,032,300.00 allocation. See details |
Health and Human Services, Department of / Administration for Children and Families | 4/10/2009 | ||||||||||||||
| GOLDEN LANTERN INN | $236,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| MULTIPLE RECIPIENTS | $231,000.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN | Agriculture Department / Farm Service Agency | |||||||||||||||
| Wuff-DA Dog Wash & Salon Inc | $213,500.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| RED WING HOUSING & REDEVELOPMENT AUTHORITY | $198,489.00 | Grant | Public Housing Capital Fund Stimulus (Formula) Recovery Act Funded Improve sustainable housing for elderly and persons with disabilities: 1) replace existing parking lot; and 2) design and install half circle front driveway providing a drop off area leading to the front door of the complex including a handicapped accessible ramp with canopy.... Show more | Housing and Urban Development Department | 3/18/2009 | ||||||||||||||
| Memory Maker Antiques | $192,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| DOVER RESOURCES, INC. | $184,590.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $184,590.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $184,390.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $184,390.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| INDEPENDENT SCHOOL DISTRICT 256 | $180,125.60 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $94,711,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/01/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $177,314.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| GOODHUE, COUNTY OF | $173,290.00 | Grant | Recovery Act ? Assistance to Rural Law Enforcement to Combat Crime and Drugs Competitive Grant Program Undet Category II, the County of Goodhue will hire a full time sworn law enforcment officer and purchase an unmarked squad car. The county is currently experiencing a substantial increase in narcottic-related crime with investigations nearly doubling within a five year period, due in part to the county's geographic location between two major metropolitan areas. The grant funded officer will serve as a narcotics investigatior and conduct narcotics investigations occurring within the county and in the region covered by the Southeast Minnesota Narcotics and Gang Task Force in an effort to combat the increasing crime.... Show more | Justice Department | 8/24/2009 | ||||||||||||||
| Financial Marketing Solutions, Inc. | $127,000.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $100,537.00 | Grant | ARRA - Head Start HEAD START: FULL YEAR PART DAY HANDICAPPED TRAINING AND TECHNICAL ASSISTANCE | Health and Human Services, Department of / Administration for Children and Families | 6/03/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $100,000.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN | Agriculture Department / Farm Service Agency | |||||||||||||||
| Armory Dental, LLC | $100,000.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| DOVER RESOURCES, INC. | $84,329.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $84,329.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $68,000.00 | Grant |
Formula Grants for Other Than Urbanized Areas Invest in public transporation by purchasing 50 new buses for rural public transit providers and seven (7) new buses for the provision of public subsidized inter-city transporation services.
This spending item is part of a $7,414,000.00 allocation. See details |
Transportation Department / Federal Transit Administration | 7/10/2009 | ||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $68,000.00 | Grant |
Formula Grants for Other Than Urbanized Areas Invest in public transporation by purchasing 50 new buses for rural public transit providers and seven (7) new buses for the provision of public subsidized inter-city transporation services.
This spending item is part of a $7,414,000.00 allocation. See details |
Transportation Department / Federal Transit Administration | 7/10/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $64,452.00 | Contract |
Argonne National Laboratory--Accelerated Cleanup of Surplus Nuclear Facilities Project (PIN 2002000) The scope of this project consists of three subprojects: 1) Decontamination (as required) and demolition of two rad-contaminated facilities and offsite disposal of all associated wastes for Buildingg 310 and Building 330, 2) Continuation of TRU waste disposal from the site with implementation of 'next phase' RH and CH TRU disposal project including the characterization; preparation and packaging of TRU waste for either direct disposal at WIPP (for RH) or transfer to INL prior to disposal at WIPP (for CH), and 3) Removal and disposition of non-TRU stored nuclear materials and wastes in the Building 212 Alpha Gamma Hot Cell Facility (AGHCF).... Show more
This spending item is part of a $79,000,000.00 allocation. See details |
Energy Department | 5/22/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $58,180.50 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $58,180.50 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| GOODHUE CO EDUCATION DISTRICT-6051 | $57,408.56 | Grant |
Special Education - Preschool Grants, Recovery Act Assist States to make available special education and related services for children with disabilities age 3 through 5 years, and at a State's discretion, to 2 year old children with disabilities who will reach age three during the school year.
This spending item is part of a $7,707,310.00 allocation. See details |
Education Department / Office of Special Education and Rehabilitative Services | 4/01/2009 | ||||||||||||||
| INDEPENDENT SCHOOL DISTRICT #255 | $56,751.90 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $94,711,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/01/2009 | ||||||||||||||
| CANNON FALLS INDEPENDENT SCHOOL DIST 252 | $51,816.96 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $94,711,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/01/2009 | ||||||||||||||
| GOODHUE CO EDUCATION DISTRICT-6051 | $46,482.70 | Grant |
Special Education - Grants for Infants and Families, Recovery Act Assist States in the implementation of a statewide, comprehensive, coordinated, multidisciplinary, interagency system of early intervention services for infants and toddlers with disabilities and their families.
This spending item is part of a $7,856,560.00 allocation. See details |
Education Department / Office of Special Education and Rehabilitative Services | 4/01/2009 | ||||||||||||||
| KENYON-WANAMINGO SD 2172 | $44,414.53 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $94,711,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/01/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $42,562.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $42,562.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| WESTERN AIR MAPS, INC. | $39,900.00 | Contract | Services to produce LIDAR Data for portions of Lock and Dam 3 and Locak and Dam 3 Mitigation sites in Welch, Minnesota, Good Hue County. This task order shall produce FEMA grade LIDAR as an extension of the existing work with the State of Iowa and USGS. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 | ||||||||||||||
| GOODHUE, COUNTY OF | $35,631.00 | Grant | Recovery Act - Edward Byrne Memorial Justice Assistance Grant (JAG) Program / Grants To Units Of Local Government Recovery Act Edward Byrne Memorial Justice Assistance Grant Program | Justice Department | 8/13/2009 | ||||||||||||||
| PRAIRIE ISLAND TRIBAL COUNCIL | $33,110.00 | Contract | PIIC 2009 Tribal Energy Project | Energy Department | 9/23/2009 | ||||||||||||||
| PRAIRIE ISLAND TRIBAL COUNCIL | $33,100.00 | Grant | Energy Efficiency and Conservation Block Grant Program (EECBG) Energy Eff and Conservation Block Grant PGB | Energy Department / Assistant Secretary for Energy Efficiency and Renewable Energy | 9/30/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $30,460.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Deactivation & Decommissioning (D&D) G求 Accelerated deactivation and decommissioning (D&D) of 87 EM facilities. Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. WAG 7 Subsurface Disposal Area (SDA) G求 Complete Pit 4W exhumation facility design and construction G求 Start Pit 4W excavation of the pit area footprint, retrieval and packaging, and shipment to WIPP of TRU and targeted waste G求 Complete in-situ grouting of mobile radionuclide sources as identified in the OU 7 13/14 ROD G求 Complete Pit 6 Targeted Waste Exhumation, Packaging, and Characterization. G求 Complete Pit 5 Targeted Waste Exhumation, Packaging, and Characterization. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $437,675,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| DOVER RESOURCES, INC. | $30,460.00 | Contract |
This award provides for the performance of current contractual work scope that was unfunded due to higher site funding priorities and adds new scope that includes deactivation and decommissioning of EM facilities and acceleration of the disposition of legacy materials. Specific scope items to be perrformed are: Remote-Handled TRU Waste Processing G求 Complete activities that support the processing and ultimate disposition of RH-TRU waste. Process 161 containers of RH-TRU and mixed RH-TRU waste. Officer Compensation Proviso: 1. A significant portion of the reported compensation is not reimbursed by the government and, in some cases, may be tied to performance factors, goals and initiatives of the corporate parents rather than the government contractorG侵s performance, including, at times, support for corporate goals of diversity hiring, mentoring, and participating in safety and technical reviews for other projects. 2. One individual, although he is one of the five most highly compensated officers of the contractor for reporting purposes, was not an officer of the contractor during any portion of the reporting period, FY 2008. Therefore, based on the definition of total compensation in FAR 52-204.11(a) and guidance in 17 CFR 229.402(a)(2) and (4), only total compensation from the contractor for FY 2008 is reported. 3. A significant portion of one executive's reported income represents 1) a nonreimbursible final payment under a previous incentive plan, and 2) a nonreimbursible, one-time, lump-sum mobility incentive.... Show more
This spending item is part of a $100,500,000.00 allocation. See details |
Energy Department | 4/13/2009 | ||||||||||||||
| GOODHUE INDEPENDENT SCHOOL DISTRICT 253 | $28,375.95 | Grant |
Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet State academic achievement standards.
This spending item is part of a $94,711,000.00 allocation. See details |
Education Department / Office of Elementary and Secondary Education | 4/01/2009 | ||||||||||||||
| THREE RIVERS COMMUNITY ACTION | $27,709.00 | Grant |
Emergency Food and Shelter National Board Program (ARRA) Emergency Food and Shelter Ntaionl Board Program (EFSP) -- The EFSP ARRA funding is intended to supplement and expand the work of local social service agencies, both nonprofit and governmental, in an effort to help people with economic emergenccies (not disaster-related [i.e., fires of any kind, floods, tornadoes, etc]). Funded Local Recipient Organizations (LROs) provide emergency services to those in need of food, shelter, rent/mortgage assistance, and utility assistance.... Show more
This spending item is part of a $100,000,000.00 allocation. See details |
Homeland Security Department / DHS - Federal Emergency Management Agency | 4/01/2009 | ||||||||||||||
| Shear Perfection of Red Wing, Inc. dba She | $15,500.00 | Loan | 7(a) Loan Guarantees TO AID SMALL BUSINESSES WHICH ARE UNABLE TO OBTAIN FINANCING IN THE PRIVATE CREDIT MARKETPLACE | Small Business Administration | |||||||||||||||
| J & C RED WING INC | $12,500.00 | Loan | 7(a) Loan Guarantees PATRIOT EXPRESS | Small Business Administration | |||||||||||||||
| J & C OF RED WING INC | $7,500.00 | Loan | 7(a) Loan Guarantees PATRIOT EXPRESS | Small Business Administration | |||||||||||||||
| GOLDEN LANTERN INN | $2,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| TRANSPORTATION, MINNESOTA DEPARTMENT OF | $0.00 | Grant |
Highway Planning and Construction Highway Infrastructure Investment Grant: Areas with Population equal to or less than 200K
This spending item is part of a $1,784,730.00 allocation. See details |
Transportation Department / Federal Highway Administration | 4/09/2009 | ||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture Department / Farm Service Agency | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture Department / Farm Service Agency | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Farm Operating Loans DIRECT OPERATING LOAN SUBSIDY | Agriculture Department / Farm Service Agency | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| MULTIPLE RECIPIENTS | $0.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service | |||||||||||||||
| GOLDEN LANTERN INN | $-3,000.00 | Loan | 504 Certified Development Loans TO ASSIST SMALL BUSINESS CONCERNS BY PROVIDING LONG TERM FINANCING THROUGH THE SALE OF DEBENTURES TO THE PRIVATE SECTOR | Small Business Administration | |||||||||||||||
| MULTIPLE RECIPIENTS | $-142,800.00 | Loan | Very Low to Moderate Income Housing Loans - Guaranteed Single Family Housing Guaranteed Loans - ARRA | Agriculture Department / Rural Housing Service |