Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Hennepin County, Minn., funds by State, Department of

Listing $1,383,528.57 in stimulus funds from State, Department of for Hennepin

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
NORTH STAR IMAGING, INC. $730,365 M5000 Computed Tomography Imaging System. The system is a turnkey X-ray Inspection and Computed Tomography System designed specifically for industrial applications. This system utilizes an NSI radiation shielded enclosure and NSI M5000 Seven-axis componen State, Department of 7/14/2009
MARTINEZ GEOSPATIAL, INC. $295,568 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
Martinez Geospatial, Inc. $283,095 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
NORTH STAR IMAGING, INC $74,500 X-view efX-CT Premium reconstruction workstation with efX-CT software. Workstation is a high performance computing workstation that utilizes four C1060 computational modules, 6 TB of redundant high speed storage and a 30 high resolution monitor. Include State, Department of 7/15/2009