Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
DEAN KURTZ CONSTRUCTION COMPANY $2,526,097 TAS 96 3135, Recovery Project#::6440::RP# GP Design/Build Powerhouse Crane Rehab at the Gavins Point Project Office-ARRA Funds, P2 #323326 U.S. Army Corps of Engineers - civil program financing only 6/22/2010
WESTERN CONTRACTING CORPORATION $1,102,013 As part of the construction of clearing and grubbing, embankment placement and excavation per drawings and specifications at Missouri River Mile 781 Cedar County, Nebraska. U.S. Army Corps of Engineers - civil program financing only 7/23/2009
WESTERN CONTRACTING CORPORATION $870,700 As a part of construction of clearing and grubbing, embankment placement, and excavation per drawings and specifications at Missouri River Mile 781.4, Cedar County, Nebraska. U.S. Army Corps of Engineers - civil program financing only 7/23/2009
DEAN KURTZ CONSTRUCTION COMPANY $457,972 As part of maintenance at Gavins Point Dam, Cedar County, NE this design build contract is for: 1. Remove old elevator components. Complete installation, commissioning, and certification of new elevator components. 2. Replace existing fire alarm notifier
This spending item is part of a $599,327 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/17/2009
NDG CONSTRUCTORS $304,700 As part of maintenance to rehab existing asphalt roadway and parking areas including milling all existing asphatlt and blending with existing base cours, recompact and install asphalt overlay at Gavins Point Project, Nebraska, Cedar County.
This spending item is part of a $1,300,648 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/09/2009
SLOWEY CONSTRUCTION, INC. $190,741 As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/24/2009
NDG CONSTRUCTORS $119,559 As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/24/2009
LEO A DALY COMPANY $32,800 As part of maintenance to develop plans and specs to repair a shallow sline on the downstream slope of Gavins Point Dam, Nebraska, Cedar County
This spending item is part of a $343,100 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/24/2009
FOURFRONT KURTZ JOINT VENTURE $29,151 As part of maintenance at Gavins Point Dam, Cedar County, NE this design build contract is for: 1. Remove old elevator components. Complete installation, commissioning, and certification of new elevator components. 2. Replace existing fire alarm notifier
This spending item is part of a $599,327 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 8/17/2009
FOURFRONT KURTZ JOINT VENTURE $0 TAS 96 3135, Recovery Project#::6440::RP# GP Design/Build Powerhouse Crane Rehab at the Gavins Point Project Office-ARRA Funds, P2 #323326