Eddy County, N.M., funds by Interior, Department of

Listing $1,829,484.46 in stimulus funds from Interior, Department of for Eddy

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
K.D. HUEY COMPANY, LLC $444,680 RECOVERY- Seven Rivers Brantley Dam Mitigation Bureau of Reclamation 6/08/2010
GLOBAL FRONTLINE SOLUTIONS LLC $299,724 Grassland Restoration Champion Canyon. Slash, hand pile, and cover juniper. 50 miles west of Artesia, NM. Bureau of Land Management 4/14/2010
GLOBAL FRONTLINE SOLUTIONS LLC $228,030 Grassland Restoration Buckhorn Juniper. Slashing, lop, and scatter of juniper. 50 miles west of Artesia, NM. Bureau of Land Management 4/14/2010
Mbf Services Inc $180,385 CAVE-116245-Structural Repair and Lead Based Paint Abatement in Elevator Shaft at Carlsbad Caverns National Park, NM. Provide costruction management oversight for structural repoar and lead based paint abatement.
This spending item is part of a $196,974 allocation. See details
National Park Service 8/26/2010
URS GROUP, INC. $161,948 Design and construct solar wildlife water collection system including water well pumps and booster stations, numerous tanks, localized fencing. Over 33 miles of small-diameter (1.5) water line and tanks for multiple systems in various locations.
This spending item is part of a $1,202,335 allocation. See details
U.S. Fish and Wildlife Service 7/19/2010
ANDERSON HALLAS ARCHITECTS, PC $143,075 The elevator system at Carlsbad Caverns exist in two 750-foot vertical shafts, drilled and blasted through limestone rock, into the underground cavern space. The older and smaller shaft houses freight elevators 1and 2. The newer and larger shaft houses
This spending item is part of a $335,202 allocation. See details
National Park Service 9/07/2010
PARAMETRIX, INC. $139,939 Survey of 2,240 acres in Eddy and Chavez Counties Bureau of Land Management 3/31/2010
CENTER OF EXCELLENCE FOR HAZARDOUS MATERIALS MANAGEMENT $117,000 Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. This Award (Cooperative Agreement) is being implemented in order for the Service and the Cooperator to work together on privately owned lands for the purpose of improving native short-grass sand scrub, sand dunes, and desert grass... Show more U.S. Fish and Wildlife Service 7/21/2009
ANDREWS AND ANDERSON ARCHITECT PC $37,520 This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park
This spending item is part of a $227,533 allocation. See details
National Park Service 11/24/2009
CROUCH PLUMBING, HEATING, AND AIR CONDITIONING, INC. $27,450 Provide and Install HVAC units with 10 year extended warranties on compressors, Carlsbad Caverns National Park, NM National Park Service 2/02/2010
ANDREWS AND ANDERSON ARCHITECT PC $18,881 This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. This specific Task Order is concerned with developing the Schematic Design drawings t
This spending item is part of a $116,929 allocation. See details
National Park Service 9/04/2009
HDR ENGINEERING, INC. $16,589 CAVE-116245-Structural Repair and Lead Based Paint Abatement in Elevator Shaft at Carlsbad Caverns National Park, NM. Provide costruction management oversight for structural repoar and lead based paint abatement.
This spending item is part of a $196,974 allocation. See details
National Park Service 8/26/2010
ANDERSON HALLAS ARCHITECTS, PC $14,063 This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park
This spending item is part of a $115,067 allocation. See details
National Park Service 9/03/2010
ANDREWS AND ANDERSON ARCHITECT PC $201 Services required to take part in a pre-proposal contractor walkthrough for the Structural Repair and Lead Based Paint Abatement in the Primary Visitor Elevator shafts at Carlsbad Caverns National Park. Consultants from the A/E team were present on site
This spending item is part of a $9,433 allocation. See details
National Park Service 3/17/2010