Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Kings County, N.Y., funds by General Services Administration

Listing $84,899,646.52 in stimulus funds from General Services Administration for Kings

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
NICHOLSON & GALLOWAY, INC $45,424,178 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
TURTLE ASSOCIATES LLC $6,710,726 This energy conservation and renewable energy conservation project is located in Brooklyn, NY. Along with the base contract, which includes a mechanical upgrade of removing old chillers and boilers and replacing with new, there will be work completed on Public Buildings Service 3/31/2010
LEND LEASE (US) CONSTRUCTION LMB INC $5,597,985 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
VOLMAR CONSTRUCTION INC. $5,584,325 Building renovation of half of the building at the Emanuel Celler US Courthouse. Public Buildings Service 5/28/2009
FEMENELLA & ASSOCIATES, INC. $3,939,467 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
Pace Plumbing Corp. $3,518,297 The Thurgood Marshall Courthouse infrastructure upgrade.
This spending item is part of a $64,000,000 allocation. See details
Public Buildings Service 4/15/2009
AMERICON, INC. $2,607,474 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
GOODY, CLANCY & ASSOCIATES, INC. $2,110,795 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
Superstructures Engineering + Architecture, Pllc $1,864,575 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
BOVIS LEND LEASE LMB, INC. $1,804,010 Provide program management activities including professional, technical, administrative and clerical support to the General Services Administration (GSA) Project Team's management of and the successful completion of the Modernization of the Emanuel Celler Public Buildings Service 5/19/2009
IRON EAGLE ENVIRONMENTAL SERVICES $1,125,000 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
MCDONOUGH BOLYARD PECK, INC. $532,972 The Conrad B. Duberstein U.S. Bankruptcy Courthouse is a historic structure located in the Civic Center of the Borough of Brooklyn, New York. It is a good example of Romanesque Revival architecture, it is a local historical Landmark in the City of New Yor Public Buildings Service 12/31/2009
Relogistics Inc $377,010 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
Cole Consulting Corp. $363,670 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
GOSHOW ARCHITECTS, L.L.P. $335,196 Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York
This spending item is part of a $917,352 allocation. See details
Public Buildings Service 11/17/2009
MDC ELECTRICAL CONTRACTOR LLC $325,600 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
GRUZEN SAMTON ARCHITECTS PLANNERS & INTERIOR DESIGNERS LLP $311,556 Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide
This spending item is part of a $765,756 allocation. See details
Public Buildings Service 5/20/2009
BANC 3, INC. $311,553 Construction Management support services for the Electrical and Mechanical Upgrade to the Alfonso M. D'Amato US Court House and Federal Building Public Buildings Service 3/31/2010
HATCH MOTT MACDONALD NY INC. $261,102 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
MIDCITY ELECTRICAL CORP $221,600 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
ROBERT SILMAN ASSOCIATES, P.C. $206,873 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
BROOKS RANGE CONTRACT SERVICES, INC. $199,950 Brooks Range will provide GSA with not to exceed 900 hours of overtime engineers hours at the Dubertstein Courthouse, Brooklyn NY in support of energy project. Engineers shall escort and monitor construction contractors, expidite shut downs for tie-ins, Public Buildings Service 9/14/2010
KATCHADOURIAN, NINA $145,000 Development of a public art work for the Van Buren, ME border station. Have spent total of $850 total related to site to Van Buren, ME. Public Buildings Service 6/04/2010
Able Rigging Contractors, Inc $138,140 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
ARCHITECTURAL TESTING, INC. $120,500 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
BURLEW MECHANICAL LLC $96,900 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
ADT Security Services, Inc. $95,587 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
Taylor Family Trust $79,000 Provide temporary chiller (chiller on a truck) to be parked on Tillary Street and piped into the Duberstein Courthouse Brooklyn NY. Modification 01 entended Chiller requirement to 5/24/2011 for an additional $34,100.00
This spending item is part of a $132,193 allocation. See details
Public Buildings Service 4/06/2011
ENVIRONMENTAL PLANNING & MANAGEMENT, INC. $76,507 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
VERTICAL ACCESS, LLC $63,298 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
JACOBS TECHNOLOGY INC. $59,463 The scope of this project is to design and implement opportunities to provide cost efficient solutions, or Energy Conservation Measures (ECMs), to reduce energy consumption at the Roosevelt US Courthouse. Jacobs responsibilities in support of these effort Public Buildings Service 9/30/2010
BROOKS RANGE CONTRACT SERVICES, INC. $53,193 Provide temporary chiller (chiller on a truck) to be parked on Tillary Street and piped into the Duberstein Courthouse Brooklyn NY. Modification 01 entended Chiller requirement to 5/24/2011 for an additional $34,100.00
This spending item is part of a $132,193 allocation. See details
Public Buildings Service 4/06/2011
Beasley, Chin & Hunderman PC $38,750 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
Viridian Energy & Environmental, LLC $31,062 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
BANC 3, INC. $29,600 Provide Construction Management services for the Re-Commissioning of the Theodore Roosevelt US Courthouse and Federal Building One Year after Implementation Public Buildings Service 9/23/2010
JABLONSKI BUILDING CONSERVATION, INC. $29,338 Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si
This spending item is part of a $2,480,116 allocation. See details
Public Buildings Service 6/08/2009
Nasco Heating & Air Conditoning Inc $29,000 ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report
This spending item is part of a $3,626,636 allocation. See details
Public Buildings Service 5/27/2010
WISS, JANNEY, ELSTNER ASSOCIATES, INC. $24,000 The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment.
This spending item is part of a $8,047,237 allocation. See details
Public Buildings Service 7/15/2009
Riehm Corporation $20,000 Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201
This spending item is part of a $61,746,842 allocation. See details
Public Buildings Service 7/27/2009
BROOKS RANGE CONTRACT SERVICES, INC. $19,984 Provide project support services (escort, equipment shutdowns, tie in of mechanical, fire alarm equipment) to 225 Cadman Plaza,Brooklyn, NY Public Buildings Service 2/28/2011
BROOKS RANGE CONTRACT SERVICES, INC. $16,409 Commisioning work at both Duberstien & Roosevelt Couthouses Public Buildings Service 12/09/2009