Recovery Tracker

How Much Stimulus Funding is Going to Your County?

New York County, N.Y., funds by Interior, Department of

Listing $3,811,782.89 in stimulus funds from Interior, Department of for New York

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
LUMUS CONSTRUCTION, INC. $1,806,770 HAGR Hamilton Grange National Monument. Interior and Exterior painting, plaster repair and replacement, electrical upgrades, display area/NPS offices upgrades. National Park Service 5/11/2010
HDR ENGINEERING, INC. $327,537 Supplemental services and schematic design services for stabilization of seawall at Ellis Island up to 6,450 lineal feet. Modification includes sea wall core samples and testing not included in original task order
This spending item is part of a $484,000 allocation. See details
National Park Service 7/28/2009
AMMANN & WHITNEY, INC. $305,744 Rehabilitate Lincoln Memorial Reflecting Pool and Grounds - Design Services
This spending item is part of a $2,056,053 allocation. See details
National Park Service 12/23/2009
BUILDING CONSERVATION ASSOCIATES INC $184,834 CM Services Hamilton Grange National Memorial - Complete the Hamilton Grange Restoration National Park Service 5/11/2010
COASTAL ENVIRONMENTAL GROUP INC. $179,424 The purpose of this contract is to obligate $179,423.50 for General Grant National Memorial, Complete Rehabilitation of General Grant's Tomb and Overlook Pavilion. Design and Contruction of New Electrical Service to the Overlook Pavili National Park Service 9/29/2009
LOUIS BERGER GROUP, INC., THE $137,876 This project is the general construction of conduit and conductors from new uninterruptible power supplies (UPS) to perimeter locations and general construction of conduit and fiber optic cabling to perimeter locations to support data transmission on Libe National Park Service 5/11/2010
JOHN G. WAITE ASSOCIATES, ARCHITECTS, PLLC $116,270 Construction Documents and Compliance for Hamilton Grange National Park Service 7/09/2009
JOHN G. WAITE ASSOCIATES, ARCHITECTS, PLLC $109,757 Architectural/Engineering services during construction of Hamilton Grange Exhibits National Park Service 5/11/2010
JOHN G. WAITE ASSOCIATES, ARCHITECTS, PLLC $100,414 Interpretive exhibit planning and design, design development through final production documents and misc. exhibit needs at Hamilton Grange. National Park Service 9/25/2009
TRIUMPH LEARNING, LLC $87,723 Textbooks Indian Affairs (Assistant Secretary) 5/04/2010
ROBERT SILMAN ASSOCIATES, P.C. $87,058 Architectural and Engineering Services - Stablization of Ellis Island Baggage and Dormitory Building - Construction Management Services
This spending item is part of a $135,701 allocation. See details
National Park Service 5/11/2010
MC LAREN, M G, PC (INC) $86,739 Supplemental services and schematic design services for stabilization of seawall at Ellis Island up to 6,450 lineal feet. Modification includes sea wall core samples and testing not included in original task order
This spending item is part of a $484,000 allocation. See details
National Park Service 7/28/2009
AMMANN & WHITNEY, INC. $68,954 Construction Management services. Architecture/Engineering Services during construction (Title III) Linclon Reflecting Pool
This spending item is part of a $788,533 allocation. See details
National Park Service 9/20/2010
JOHN G. WAITE ASSOCIATES, ARCHITECTS, PLLC $68,100 Hamilton Grange - Exhibit Production Support National Park Service 5/13/2010
MATRIX ENVIRONMENTAL & GEOTECHNICAL SERVICES, INC $38,244 Supplemental services and schematic design services for stabilization of seawall at Ellis Island up to 6,450 lineal feet. Modification includes sea wall core samples and testing not included in original task order
This spending item is part of a $484,000 allocation. See details
National Park Service 7/28/2009
Craig Test Boring Company, Inc $31,480 Supplemental services and schematic design services for stabilization of seawall at Ellis Island up to 6,450 lineal feet. Modification includes sea wall core samples and testing not included in original task order
This spending item is part of a $484,000 allocation. See details
National Park Service 7/28/2009
WHIRLWIND CREATIVE, INC. $29,663 Wayside exhibits at the George Washington Carver National Monument National Park Service 9/24/2009
WHIRLWIND CREATIVE, INC. $29,623 Design of Wayside Exhibits for George Washington Carver National Park National Park Service 9/24/2009
EDAW, INC. $15,575 Jupiter Habitat Restoration Bridge Data Bureau of Land Management 6/24/2010
ATKINS NORTH AMERICA, INC $0 CM Services Hamilton Grange National Memorial - Complete the Hamilton Grange Restoration
This spending item is part of a $184,810 allocation. See details
National Park Service 5/11/2010