Onondaga County, N.Y., funds by Army, Department of

Listing $3,661,850.00 in stimulus funds from Army, Department of for Onondaga

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SIEMENS INDUSTRY, INC. $1,132,000 The Scope of Work for this project consists of installing the necessary equipment for the control of HVAC equipment identified through the initial site survey of 136 buildings as identified by Fort Drum personnel. The intent of this scope is to remove the
This spending item is part of a $1,372,515 allocation. See details
Army, Department of 6/17/2009
TRANE U.S. INC. $603,200 Replace Failing Telemetry System. This project replaced the outdated controls for water, sewer and gas distribution
This spending item is part of a $1,712,015 allocation. See details
Army, Department of 7/29/2009
QUINLIVAN, PIERIK & KRAUSE $479,600 AS part of Army Military Construction Program, perform construction of a child development center located at Fort Drum, NY
This spending item is part of a $6,357,600 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/25/2009
BLACKSTONE ELECTRIC, INC. $436,400 Replace Failing Telemetry System. This project replaced the outdated controls for water, sewer and gas distribution
This spending item is part of a $1,712,015 allocation. See details
Army, Department of 7/29/2009
BLACKSTONE ELECTRIC, INC. $436,400 The Scope of Work for this project will consist of between Occupancy Preventive Maintenance Work. To include but not limited to the painting of walls, doors and frames, replacing damaged ceiling tile, and window screens, and general cleaning. Provide and Army, Department of 6/03/2009
ROBSONWOESE INC. $270,550 AS part of Army Military Construction Program, perform construction of a child development center located at Fort Drum, NY
This spending item is part of a $6,357,600 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 9/25/2009
BLACKSTONE ELECTRIC, INC. $88,875 The Scope of Work for this project will consist of between Occupancy Preventive Maintenance Work. To include but not limited to the painting of walls, doors and frames, replacing damaged ceiling tile, and window screens, and general cleaning. Provide and
This spending item is part of a $191,165 allocation. See details
Army, Department of 6/03/2009
BLACKSTONE ELECTRIC, INC. $88,875 The Scope of Work for this project will consist of replacing a section of 12? water main line with 14? HDPE, tee connections, associated valves and hydrants. Current piping system is over 65 years old with lead joints that are leaking and parts of the 25
This spending item is part of a $4,771,675 allocation. See details
Army, Department of 6/03/2009
CENTRAL NEW YORK REGIONAL PLANNING & DEVELOPMENT BOARD $69,000 Complete two documents to be electronically distributed that address issues regarding Onondaga Lake. Army, Department of 8/26/2009
Peterson Geotechnical Construction LLC $28,750 As a part of military construction Army Recovery Act, the work involves the upgrade of Picatinny Lake and Denmark Lake Dams at Picatinny Arsenal, New Jersey.
This spending item is part of a $2,498,000 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 1/08/2010
BLACKSTONE ELECTRIC, INC. $28,200 Replace Wells 6 and 8
This spending item is part of a $1,618,666 allocation. See details
Army, Department of 6/17/2009