Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Wake County, N.C., funds by General Services Administration

Listing $3,807,424.84 in stimulus funds from General Services Administration for Wake

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
STANDARD SOLAR, INC. $3,302,610 Design and installation of polycrystalline silicon solar panels on the roof of the Terry Sanford Federal Building. This includes photovoltaic panels, mounting systems and associated electrical work for a complete turn-key project. The goal of the projec Public Buildings Service 3/02/2010
E M C ENGINEERS, INC. $125,343 Engineering and commissioning expertise to conduct re-commissioning/retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing services for
This spending item is part of a $315,143 allocation. See details
Public Buildings Service 8/14/2009
KEVILLE ENTERPRISES, INC $107,277 Provide Construction Management as Agent (CMa) services for the HVAC upgrades at the following two facilities: 1) Century Station Federal Building and US Post Office in Raleigh, NC; 2) Hiram H. Ward Federal Building and US Courthouse in Winston-Salem, NC.
This spending item is part of a $187,596 allocation. See details
Public Buildings Service 12/03/2010
C DESIGN INC $100,607 This project is to study options and make recommendations for a photovoltaic system to be located at the terry Sanford Federal Building in Raleigh, NC. The complex consists of a courtroom tower and a large postal annex. The proposed PV system will be mo Public Buildings Service 6/30/2009
C DESIGN INC $91,269 The project includes the design and installation of a complete flat roof self-ballasted photovoltaic system at the Terry Sanford Federal Building in Raleigh, North Carolina. The system includes: photovoltaic modules, mounting systems, data acquisition s Public Buildings Service 3/22/2010
MCDONOUGH BOLYARD PECK, INC. $80,319 Provide Construction Management as Agent (CMa) services for the HVAC upgrades at the following two facilities: 1) Century Station Federal Building and US Post Office in Raleigh, NC; 2) Hiram H. Ward Federal Building and US Courthouse in Winston-Salem, NC.
This spending item is part of a $187,596 allocation. See details
Public Buildings Service 12/03/2010