Stutsman County, N.D., funds by Interior, Department of

Listing $6,044,015.52 in stimulus funds from Interior, Department of for Stutsman

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
KEPLIN-GRACON JV $1,908,366 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
FORMATIONS INC. $475,245 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
BERGSTROM ELECTRIC, INC. $423,264 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
LUNSETH PLUMBING AND HEATING CO. $299,284 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Streyle Masonry Inc $298,000 Add alternative energy feature to the design and construction to include but not limited to a geothermal system. U.S. Fish and Wildlife Service 8/10/2010
SCHMITZ INC $259,348 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
SUN SPOT SOLAR, LLC $224,040 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
CS DUBOIS CONSTRUCTION, INC. $176,800 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Hillerud Construction Inc $169,213 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
NORBY'S OFFICE SERVICES, INC. $147,867 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
CUSTOM AIRE, INC. $147,375 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Frank Froehle Professional Car $131,300 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Lux Concrete $120,839 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
ENERCEPT, INC. $110,761 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Lam-Wood Systems, Inc. $99,748 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
MELAND LUMBER & MATERIAL CO. $97,540 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
LINDAL CONSTRUCTION MANAGEMENT, INC. $80,103 General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. U.S. Fish and Wildlife Service 5/29/2010
LINDAL CONSTRUCTION MANAGEMENT, INC. $80,103 General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. U.S. Fish and Wildlife Service 5/29/2010
D & M INDUSTRIES, INC. $77,651 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
HOUSE OF COLOR, INC. $72,173 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
ECONOMY PLUMBING INC $71,262 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
L S Drywall $68,663 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Bob Bina $54,497 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Humes Landscaping $53,505 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
KARGES-FAULCONBRIDGE, INC. $42,700 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
SCHINDLER ELEVATOR CORPORATION $39,550 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
FARGO GLASS AND PAINT COMPANY $30,506 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Frank Froehle Professional Car $29,548 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
PACE PAINTING $27,400 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
DAKOTA FENCE COMPANY $22,765 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
MELAND LUMBER & MATERIAL CO. $20,897 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
WIDSETH SMITH NOLTING & ASSOCIATES INC. $20,809 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
REDLIN AND JOHNSON INSULATION INC $19,112 Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation. See details
U.S. Fish and Wildlife Service 11/12/2009
AVI Systems, Inc. $18,737 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Certified Wood Products, Inc. $18,335 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Dakota Stone Design $16,501 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Northern Woodwork, Inc $13,249 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
MIDWEST TESTING LABORATORY, INC. $12,000 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
WOLF STEEL CONSTRUCTION INC $10,143 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
MODULAR SPACE CORPORATION $9,425 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
BRAUN INTERTEC CORPORATION $5,189 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Missouri Basin Materials, LLC $4,768 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Kevin Leroy Reuther $4,451 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Interstate Spray Foam Insulation LLC $4,373 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Fleck's Furniture & Appliance, Inc. $3,849 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
BALCO, INC. $3,570 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
MELAND LUMBER & MATERIAL CO. $3,479 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Command Center, Inc. $3,000 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
ADVANCED BUSINESS METHODS, INC. $2,250 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Concord Industries Inc $2,100 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
INDIGO SIGNWORKS INC $1,421 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
HOUSE OF COLOR, INC. $1,216 Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation. See details
U.S. Fish and Wildlife Service 11/12/2009
BERGSTROM ELECTRIC, INC. $1,200 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Kansas Lumber Homestore, Inc. $1,166 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
D.V. Fyre-TEC Inc $1,119 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
GLENROY, INC. $841 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Dallmann Services Company $700 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Consolidated Service Fleet Management LLC $491 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
Prairie Supply, Inc. $209 Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww
This spending item is part of a $5,566,307 allocation. See details
U.S. Fish and Wildlife Service 4/06/2010
KEPLIN-GRACON JV $0 Add alternative energy feature to the design and construction to include but not limited to a geothermal system.
This spending item is part of a $298,000 allocation. See details
U.S. Fish and Wildlife Service 8/10/2010
KEPLIN-GRACON JV $0 Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi
This spending item is part of a $20,071 allocation. See details
U.S. Fish and Wildlife Service 11/12/2009