Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Jefferson County, Ore., funds by Interior, Department of

Listing $6,633,039.25 in stimulus funds from Interior, Department of for Jefferson

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON $2,577,383 Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a Indian Affairs (Assistant Secretary) 3/18/2010
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON $2,165,826 Road Maintenance_Indian Roads PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a
This spending item is part of a $2,577,383 allocation. See details
Indian Affairs (Assistant Secretary) 3/18/2010
GENERAL INDUSTRIES, INC $893,579 Rehabilitate Water Pumps and Motors at Warm Springs NFH. Replace existing Motor Starters with Variable Frequency Drives. Replacement of the main service switchboard (in place) adn switchoard B&C. Replacement of the generator paralleling/synchronizing g
This spending item is part of a $1,007,771 allocation. See details
U.S. Fish and Wildlife Service 3/23/2010
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON $618,559 Highway Planning and Construction The Project will provide for construction of Sid Walter Culvert Replacement in accordance with ODOT specification (FP Manual). The total construction length for this project is 0.40 KM on the Warm Springs Indian Reservation, Oregon.
This spending item is part of a $643,879 allocation. See details
Indian Affairs (Assistant Secretary) 5/21/2010
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON $213,501 Highway Planning and Construction The Project will provide for construction of West Hills Pedestrian Improvements in accordance with ODOT specification. The total construction length for this project is 1.11 miles on the Warm Springs Indian Reservation, Oregon.
This spending item is part of a $372,404 allocation. See details
Indian Affairs (Assistant Secretary) 5/21/2010
BURTON CONSTRUCTION, INC. $114,192 Rehabilitate Water Pumps and Motors at Warm Springs NFH. Replace existing Motor Starters with Variable Frequency Drives. Replacement of the main service switchboard (in place) adn switchoard B&C. Replacement of the generator paralleling/synchronizing g
This spending item is part of a $1,007,771 allocation. See details
U.S. Fish and Wildlife Service 3/23/2010
COUNTY OF JEFFERSON $25,000 Fish Wildlife Plant Con.Mgmt. Bureau of Land Management 3/12/2010
COUNTY OF JEFFERSON $25,000 Fish, Wildlife and Plant Conservation Resource Management Wild and Scenic River in Jefferson Bureau of Land Management 3/12/2010