Harris County, Texas, funds by Army, Department of

Listing $432,127.50 in stimulus funds from Army, Department of for Harris

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
Gray Mechanical Contractors, LP $303,441 As a part of Bldg. 1396 renovation and construction for Evans Theater on Fort Sam Houston, TX. This project includes all labor, material and equipment to renovate the interior of Evans Theater to Include the following: HVAC, repair/replace seating, brin
This spending item is part of a $1,016,292 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 7/30/2010
V-Kool, Inc. $95,596 Upgrading Heating Ventilation and Air Conditioning equipment and Direct Digital Controls (DDC), incidental repairs, and Retro-Commissioning (RCx) in Building 4-2843 (Soldier Support Center) and associated Heating & Cooling Plant Buildings 4-2641 & 4-2441
This spending item is part of a $6,723,500 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 2/12/2010
POST BUCKLEY SCHUH & JERNIGAN INC $11,865 Sampling and Chemical Analysis, Sims Bayou Flood Risk Management Project. Sediment samples were collected from Sims Bayou, for the purpose of conducting testing to characterize the material that will be excavated during sediment removal operations. The ma
This spending item is part of a $16,073 allocation. See details
Army, Department of 6/22/2009
INVENSYS SYSTEMS, INC. $9,950 Johnson Controls will furnish and install (1) a precooling module, and (2) upgraded controls for a 24-MW General Electric Backup Generator at Ft Bliss. Work includes all engineering and existing component documentation.
This spending item is part of a $955,031 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/31/2010
INVENSYS SYSTEMS, INC. $5,877 Johnson Controls will furnish and install (1) a precooling module, and (2) upgraded controls for a 24-MW General Electric Backup Generator at Ft Bliss. Work includes all engineering and existing component documentation.
This spending item is part of a $955,031 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/31/2010
Anacon Inc $4,208 Sampling and Chemical Analysis, Sims Bayou Flood Risk Management Project. Sediment samples were collected from Sims Bayou, for the purpose of conducting testing to characterize the material that will be excavated during sediment removal operations. The ma
This spending item is part of a $16,073 allocation. See details
Army, Department of 6/22/2009
INVENSYS SYSTEMS, INC. $1,190 Johnson Controls will furnish and install (1) a precooling module, and (2) upgraded controls for a 24-MW General Electric Backup Generator at Ft Bliss. Work includes all engineering and existing component documentation.
This spending item is part of a $955,031 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 3/31/2010
Cablefitters LLC $0 The building is being repurposed from an elementary school to an operational center for DOIM/NEC. The requirements include asbestos and lead abatement, and mold remediation. The windows and fa+?ade will be updated to include force protection (blast proo
This spending item is part of a $8,096,952 allocation. See details
Army, Department of 3/24/2010