Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Presidio County, Texas, funds by State, Department of

Listing $6,464,827.50 in stimulus funds from State, Department of for Presidio

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
MAGNUS PACIFIC CORPORATION $5,959,555 Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control
This spending item is part of a $6,324,095 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/13/2010
TETRA TECH, INC. $248,733 As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING THE CONSTRUCTION OF THE URBAN LEVEE REMEDIATION AT RIO GRANDE AND CIBOLO CREEK, PRESIDIO, TX)-The Urban Levee Improvements at Rio Grande and Cibolo Creek consist of an approximate 8.4 miles o U.S. and Mexico International Boundary and Water Commission 8/31/2010
LAND-MARK PROFESSIONAL SURVEYING INCORPORATED $104,874 Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control
This spending item is part of a $6,324,095 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/13/2010
FUGRO CONSULTANTS, INC. $82,845 Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control
This spending item is part of a $6,324,095 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/13/2010
814 SOLUTIONS, LLC $68,820 Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control
This spending item is part of a $6,324,095 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/13/2010