Taylor County, Texas, funds by Department of the Air Force
Listing $13,262,424.94 in stimulus funds from Department of the Air Force for Taylor
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HAWKINS BUILDERS INC | $2,050,390 | Clean and reseal joints among 25' by 25' concrete slabs on aircraft parking apron and Taxiway A for a quantity of 331,500 feet. | Department of the Air Force | 5/01/2009 |
HAWKINS BUILDERS INC | $1,500,000 | Replace fifty-three 25' by 25' concrete slabs along taxiway A that are shattered and generating foreign object debris. | Department of the Air Force | 5/01/2009 |
Buffalo Gap Instrumentation & Electrical Co., Inc. | $1,278,200 |
Project involves removal of existing electrical distribution system and installation of a new underground electrical distribution system in Areas C and D of Dyess Air Force Base. Project involves: cabling, electrical distribution equipment, electrical sw
This spending item is part of a $1,670,300 allocation.
See details
|
Department of the Air Force | 4/23/2009 |
AFCO TECHNOLOGIES, INC. | $1,198,000 | All work for Natural Gas Mains, P4 @ Dyess AFB, TX. | Department of the Air Force | 4/23/2009 |
HAWKINS BUILDERS INC | $1,096,007 | Mill the runway's asphalt overruns (66,700 SQ FT) one-inch, followed by one-inch asphalt overlay and restriping chevrons. | Department of the Air Force | 4/23/2009 |
HAWKINS BUILDERS INC | $1,055,992 | Mill two inches deep followed by placement of two inches deep hot mixed asphaltic concrete on taxiway asphalt shoulders | Department of the Air Force | 5/01/2009 |
PACE-AMTEX JOINT VENTURE | $780,633 |
Project involves removal of existing fan coil units and replacement with new variable flow refrigerant system fan coil units at Buildings 7407 and 7409. Work includes: demolition, new acoustical ceiling, new HVAC system, replacement of existing lighting,
This spending item is part of a $1,361,200 allocation.
See details
|
Department of the Air Force | 4/23/2009 |
HAWKINS BUILDERS INC | $552,600 | Replace nineteen 25-ft by 25-ft concrete slabs along Taxiway A that are shattered and generating foreign object debris. | Department of the Air Force | 4/23/2009 |
V & R DRYWALL, INC. | $549,750 | Repair Demand Ventilation Controls | Department of the Air Force | 6/23/2009 |
HAWKINS BUILDERS INC | $499,951 | Provide thirteen 25' by 25' replacement concrete slabs and 1,962.89 square feet of spall repairs to airfield pavemnts. | Department of the Air Force | 4/23/2009 |
MULLTEX MECHANICAL COMPANY, INC. | $490,000 |
Project involves removal of existing fan coil units and replacement with new variable flow refrigerant system fan coil units at Buildings 7407 and 7409. Work includes: demolition, new acoustical ceiling, new HVAC system, replacement of existing lighting,
This spending item is part of a $1,361,200 allocation.
See details
|
Department of the Air Force | 4/23/2009 |
AFCO TECHNOLOGIES, INC. | $444,964 | Repair Non-Compliant Lift Stations | Department of the Air Force | 4/24/2009 |
PACE-AMTEX JOINT VENTURE | $392,100 |
Project involves removal of existing electrical distribution system and installation of a new underground electrical distribution system in Areas C and D of Dyess Air Force Base. Project involves: cabling, electrical distribution equipment, electrical sw
This spending item is part of a $1,670,300 allocation.
See details
|
Department of the Air Force | 4/23/2009 |
YEARGAN CONSTRUCTION COMPANY LLC | $391,210 |
Installation of Heat Destratification System.
This spending item is part of a $679,960 allocation.
See details
|
Department of the Air Force | 6/17/2009 |
AMERINE MECHANICAL, INC | $288,750 |
Installation of Heat Destratification System.
This spending item is part of a $679,960 allocation.
See details
|
Department of the Air Force | 6/17/2009 |
AFCO TECHNOLOGIES, INC. | $246,100 | Repair Rolling Doors, Hangar 5112 @ Dyess AFB, TX. | Department of the Air Force | 4/28/2009 |
AFCO TECHNOLOGIES, INC. | $170,168 | Convert 8 TLF Rooms to 4 @ Dyess AFB, TX. | Department of the Air Force | 6/08/2009 |
G 2-V ENTERPRISES, INC. | $139,500 | To landscape the Hunters Mesa Common Areas at Dyess Airforce Base. Work to consist of planting a quantity of 80 to 300 trees, 80 to 300 ornamental trees, and 25 to 100 shrubs. | Department of the Air Force | 9/14/2009 |
Wyatt Electrical Services | $70,527 |
Project involves removal of existing fan coil units and replacement with new variable flow refrigerant system fan coil units at Buildings 7407 and 7409. Work includes: demolition, new acoustical ceiling, new HVAC system, replacement of existing lighting,
This spending item is part of a $1,361,200 allocation.
See details
|
Department of the Air Force | 4/23/2009 |
JCL CONSTRUCTION INC. | $26,428 | Construct rubberized playground surface. | Department of the Air Force | 12/09/2009 |
JCL CONSTRUCTION INC. | $21,116 | Cost to construct rubberized playground surface. | Department of the Air Force | 9/23/2009 |
HARRIS ACOUSTICS, LTD. | $20,040 |
Project involves removal of existing fan coil units and replacement with new variable flow refrigerant system fan coil units at Buildings 7407 and 7409. Work includes: demolition, new acoustical ceiling, new HVAC system, replacement of existing lighting,
This spending item is part of a $1,361,200 allocation.
See details
|
Department of the Air Force | 4/23/2009 |