Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Caroline County, Va., funds by Army, Department of

Listing $2,243,201.34 in stimulus funds from Army, Department of for Caroline

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
HALEY BUILDERS INC. $525,091 Construct 6 Helipads Army, Department of 3/05/2010
TMG SERVICES, INC. $418,831 Gregg Lent Bridge, Fort AP Hill, VA Army, Department of 9/11/2009
BEAUMON INDUSTRIES, INC $338,888 Renovate Four (4) Latrines at Wilcox Barracks at Fort A.P. Hill, Virginia Army, Department of 9/23/2009
J & J MAINTENANCE, INC. $272,700 As a part of the Defense Health Program this project, Modernize Lois E. Wells Clinic, Ft AP Hill, will provide the renewal of the Lois E. wells Clinic, Bldg 1650, to include a scoping survey, Type III work plan, construction of 1800 sq ft addition to the
This spending item is part of a $1,312,115 allocation. See details
U.S. Army Corps of Engineers, except civil program financing 1/29/2010
CANTRELL BUILDERS $218,362 Replace doors on all buildings in FFP, 3rd Battalion, Wilcox Camp except the dining facility. All work shall be accomplished in accordance with the attached performance work statement. Army, Department of 7/29/2009
HALEY BUILDERS INC. $139,000 Repair Beaver Dam Pond Army, Department of 8/24/2009
SERVICE ALL, INCORPORATED $119,119 Lower Ceilings in Dining Facility (wilcox at Fort A.P Hill Virginga Army, Department of 11/23/2009
SERVICE ALL, INCORPORATED $119,119 Lower Ciling in Dining Facility (Wilcox at A P Hill Virginga Army, Department of 11/23/2009
MICROPACT ENGINEERING, INC. $45,786 Remove existing fans and associated components as specified. Provide and install new fans as specified, disconnect switches, motor starters, controls and new wiring to replace existing. All work is located at Buildings 1641, 1659 and 1690 in the Wilcox
This spending item is part of a $77,937 allocation. See details
Army, Department of 2/19/2010
WRIGHT ELECTRIC, INC. $23,000 Remove existing fans and associated components as specified. Provide and install new fans as specified, disconnect switches, motor starters, controls and new wiring to replace existing. All work is located at Buildings 1641, 1659 and 1690 in the Wilcox
This spending item is part of a $77,937 allocation. See details
Army, Department of 2/19/2010
TITO CONTRACTORS INC $14,154 Paint the Wilcox camp dining facilities Army, Department of 11/19/2009
PWA ENGINEERING, LLC $7,660 Remove existing fans and associated components as specified. Provide and install new fans as specified, disconnect switches, motor starters, controls and new wiring to replace existing. All work is located at Buildings 1641, 1659 and 1690 in the Wilcox
This spending item is part of a $77,937 allocation. See details
Army, Department of 2/19/2010
Final Phase Construction, Ltd. $1,491 Remove existing fans and associated components as specified. Provide and install new fans as specified, disconnect switches, motor starters, controls and new wiring to replace existing. All work is located at Buildings 1641, 1659 and 1690 in the Wilcox
This spending item is part of a $77,937 allocation. See details
Army, Department of 2/19/2010