Recovery Tracker

How Much Stimulus Funding is Going to Your County?

King County, Wash., funds by General Services Administration

Listing $167,970,138.56 in stimulus funds from General Services Administration for King

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SELLEN CONSTRUCTION CO., INC. $73,201,826 The project is a redevelopment/modernization of a portion of the existing 1202 Building Warehouse located at the Federal Center South - Seattle. The primary tenant will be the U.S. Army Corps of Engineers (USACE) Seattle District. The redeveloped/modern Public Buildings Service 3/26/2010
MCKINSTRY CO., LLC $19,245,957 Thomas S. Foley US Federal Courthouse Design-Build Modernization Project, Spokane, WA construction remodel
This spending item is part of a $40,573,396 allocation. See details
Public Buildings Service 3/22/2010
MCKINSTRY CO., LLC $17,950,817 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
HOWARD S WRIGHT COMPANIES, WASHINGTON JOINT VENTURE $9,701,835 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
Nuprecon, L.P. $9,190,649 Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation. See details
Public Buildings Service 2/17/2010
Prime Electric, Inc. $8,493,283 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
Nuprecon, L.P. $6,752,633 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
NBBJ LP $4,223,950 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
Walters & Wolf Curtain Wall, LLC $2,113,297 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
HEERY INTERNATIONAL, INC. $1,736,569 Initial scope was for pre-design services for the design and construction of new office space for the Army Corp of Engineers on the Federal Center South campus in Seattle, WA. Design and construction will be procured under a design-build procurement meth
This spending item is part of a $1,773,477 allocation. See details
Public Buildings Service 9/02/2009
URS GROUP, INC. $1,703,964 Construction Management Assist, Energy Modeling and Commissioning Services for the Jackson Federal Building Modernization Project
This spending item is part of a $2,407,474 allocation. See details
Public Buildings Service 7/24/2009
MCKINSTRY ESSENTION, INC. $1,534,318 ARRA 2009 funded Contract Award under Building Services to install Advanced Metering for Water, Steam, Gas, Fuel/Oil and/or Electrical based on the site specific utilities for GSA owned properties within GSA Region 10 for compliance with the Energy Indep Public Buildings Service 3/31/2010
SOUTHWEST CONSTRUCTION & PROPERTY MANAGEMENT $777,641 The purpose of this project is to provide a roof system(s) that balances and meets the ARRA requirements, initial capital, sustainability, life costs, good stewardship, and historical preservation and performance for the Federal Center South Building 1201
This spending item is part of a $3,328,647 allocation. See details
Public Buildings Service 3/19/2010
CB ENGINEERS $703,510 Construction Management Assist, Energy Modeling and Commissioning Services for the Jackson Federal Building Modernization Project
This spending item is part of a $2,407,474 allocation. See details
Public Buildings Service 7/24/2009
LORACHE CAD/IT SERVICES LLC $664,919 DESIGN AND BUILD FROMT ENTRY DOOR REPLACEMENT, U.S. COURTHOUSE, SEATTLE WA. USING THE AMERICIAN AND REINVESTMENT ACT FUND Public Buildings Service 9/15/2010
K.O.O. CONSTRUCTION, INC. $589,264 Base award is for Design-build construction services to perform Energy Conservation Measure Number One for the replacement of existing lighting in the courthouse main lobby/atrium with induction lighting. Options awarded this quarter on March 26 in the a Public Buildings Service 3/12/2010
Amazon.com, Inc. $558,772 Team Smartronix provided continued operations & maintenance and enhancements support during the quarter (Jan G?? Mar 2012). Significant activities performed during this period included providing technical support services and advanced data analytics for F
This spending item is part of a $17,948,517 allocation. See details
Office of the Federal Acquisition Service 7/08/2009
C-2 CONSTRUCTION INC $509,297 Replace Chiller and do an elevator upgrade for the federal building in Yakima.The Replacement of Chiller has been accomplished and the initial upgrade of the elevator gears and circuitry has begun for the #2 elevator. Public Buildings Service 7/09/2010
AIR SYSTEMS ENGINEERING, INC. $497,223 Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation. See details
Public Buildings Service 3/25/2010
Nuprecon, L.P. $494,830 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
JACOBS TECHNOLOGY INC. $475,918 Requirements and Estimating Sevices for facilities in GSA Region 10 Prepare performance based requirements packages for solicitation of Design/Build contracts for various projects. This is to include high performance Green buildings. The intent is to gath Public Buildings Service 9/15/2009
Laurel Vanek Project Planning, LLC $416,000 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
EHS-INTERNATIONAL, INC. $364,610 Conduct and Environmental Site Assessment and Minor Remediation at Building 1203, Federal Center South, Seattle, Washington, as outlined in the Scope of Work and contractor quote. Public Buildings Service 5/27/2010
B&M CONSTRUCTION, INC. $305,013 Furniture design and move services in Spokane, WA for the new military entrance processing facility. Public Buildings Service 9/24/2010
SIMPSON, BUSTER $305,000 We are creating a public artwork for the GSA Recovery project site in Seattle, Washington. Public Buildings Service 11/15/2010
MAGNUSSON KLEMENCIC ASSOCIATES, INC. $289,758 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
E M C ENGINEERS, INC. $275,307 This work is in support of the energy conservation and sustainability measures to be implemented as part of the American Recovery and Reinvestment Act of 2009. This stage is for a study to determine both low-cost control system modifications and equipment Public Buildings Service 7/23/2009
NORTHERN MANAGEMENT SERVICES, INC. $259,030 Additional Operational and maintenance support services, awarded as a not-to-exceed (NTE) amount for additional services, man-power, and equipment costs necessary to perform additional operational and maintenance support services in support of the RECOVER Public Buildings Service 7/01/2010
Wsp Flack + Kurtz, Inc. $247,680 Mechanical engineering support services to the Architectural and Engineering Services branch at Auburn, WA
This spending item is part of a $272,020 allocation. See details
Public Buildings Service 2/28/2011
Whb Plaster Company Inc $201,938 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
UPTIME INSTITUTE PROFESSIONAL SERVICES, LLC $197,400 Uptime Institute design certification and construction certification for SSA NSC Project. Public Buildings Service 1/31/2012
ALLEN BRADBURY CONSTRUCTION LLC $181,113 Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation. See details
Public Buildings Service 3/25/2010
URS GROUP, INC. $169,224 Provide project management services of Retro-Commissioning studies for seven (7) Federal Buildings throughout Region 10. Public Buildings Service 7/20/2009
LUMENOMICS LLC $168,177 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
HEERY INTERNATIONAL, INC. $167,267 Two federally owned buildings originally constructed in 1952 and 1982 in Portland, Oregon, are currently being surveyed to evaluate the HVAC, mechanical, electrical and plumbing services and equipment, to establish their age, condition and current perform Public Buildings Service 7/21/2009
TRADE-MARX SIGN & DISPLAY CORPORATION $167,140 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
Gerber & Vail, Inc. $161,000 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
SEQUOYAH ELECTRIC, LLC $156,785 ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation. See details
Public Buildings Service 3/22/2010
GARNER CONSTRUCTION WBE INC $152,565 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
MORRISON HERSHFIELD CORPORATION $125,200 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
KPFF, INC. $124,766 Engineering analysis and investigation of existing building
This spending item is part of a $154,263 allocation. See details
Public Buildings Service 5/06/2009
CHEROKEE GENERAL CORPORATION $113,978 ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation. See details
Public Buildings Service 3/22/2010
WORKING BUILDINGS, LLC $111,700 Retro-commissioning study of Federal buildings in Auburn Washington and Anchorage Alaska Public Buildings Service 7/23/2009
MAGNUSSON KLEMENCIC ASSOCIATES, INC. $105,000 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
SEATTLE CITY LIGHT $101,000 Seattle City Light provides services necessary to connect electrical power to Federal Center South Building 12021, located at 4735 E. Marginal Way, Seattle, WA. Public Buildings Service 6/16/2011
URS GROUP, INC. $99,805 Construction Management Services for the Seattle Federal Oddice Building HVAC Upgrades and the Auburn Energy Conservation Upgrade Projects. Public Buildings Service 3/29/2010
Anchor Plumbing, Inc. $98,100 ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation. See details
Public Buildings Service 3/22/2010
PETROCHEM INSULATION, INC. $95,615 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
DLR GROUP INC. $95,000 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
EDAW, INC. $89,799 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
Richard Hagg Associates Inc $89,000 Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012.
This spending item is part of a $67,511,499 allocation. See details
Public Buildings Service 12/23/2009
BLYTHE PLUMBING & HEATING, INC. $88,719 ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal
This spending item is part of a $538,080 allocation. See details
Public Buildings Service 3/22/2010
DOYON PROJECT SERVICES LLC $86,295 Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s
This spending item is part of a $336,088 allocation. See details
Public Buildings Service 6/30/2010
Amazon.com, Inc. $85,644 Team Smartronix provided continued operations & maintenance and enhancements support during the quarter (Jan G?? Mar 2012). Significant activities performed during this period included providing technical support services and advanced data analytics for F
This spending item is part of a $17,948,517 allocation. See details
Office of the Federal Acquisition Service 7/08/2009
AMEC EARTH & ENVIRONMENTAL, INC. $80,480 Prepare an Environmental Assessment (EA) to address potential environmental consequences anticipated to result from 1) redeveloping/modernizing a portion of Federal Center South (FCS) B12021 warehouse on federally-owned lands located at 4735 East Marginal Public Buildings Service 6/23/2009
EHS-INTERNATIONAL, INC. $70,412 Perform testing to measure ambient airborne chemicals of concern in the vicinity of Warehouse Building 1202 located at 4735 East Marginal Way, Seattle, Washington. The chemicals of concern include: diesel particulate matter, polyaromatic hydrocarbons, ai Public Buildings Service 9/16/2010
ART ANDERSON ASSOCIATES, INC. $69,960 Construction Management Assistance Services for Federal Center South, 1201 Building Roof Project, Seattle, WA Public Buildings Service 6/04/2010
PALADINO & COMPANY, INC $63,000 The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons
This spending item is part of a $39,786,615 allocation. See details
Public Buildings Service 3/08/2010
ESC AUTOMATION INC. $60,633 Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation. See details
Public Buildings Service 3/25/2010
Com Group Inc $59,500 Construction Manager as Agent Services for the Design and construction of the U.S. Federal Courthouse Billings, Montana
This spending item is part of a $4,703,183 allocation. See details
Public Buildings Service 12/17/2009
LMN ARCHITECTS $57,802 Federal Center South Master Plan Update Study. Update 2001 site planning component of the Federal Center South Redevelopment Feasibility Study to provide site development concepts for a secured Federal campus supporting agencies with extraordinary securit
This spending item is part of a $73,622 allocation. See details
Public Buildings Service 5/20/2009
HEERY INTERNATIONAL, INC. $52,009 Commissioning services for building boiler and chiller upgrades at General Services Administration (GSA) Region - 10 Admin Building, Auburn WA. This work included the major revisions to the means and method of controlling the chillers and the addition of Public Buildings Service 9/27/2010
CORNERSTONE ARCHITECTURAL GROUP, PS $45,301 PROVIDE LIGHTING REQUIREMENTS AS PART OF A FUTURE RELIGHTING PROJECT AT TWO FEDERAL FACILITIES.
This spending item is part of a $87,771 allocation. See details
Public Buildings Service 12/30/2009
SPARLING, INC. $44,681 Additional A/E Services for the design of a new southbound pedestrian crossing on the east side of the San Ysidro Land Port of Entry (LPOE). This work is in support of the Expansion & Reconfiguration Project at the San Ysidro LPOE in San Diego, CA.
This spending item is part of a $790,544 allocation. See details
Public Buildings Service 8/12/2010
AFFILIATED ENGINEERS INC $42,470 PROVIDE LIGHTING REQUIREMENTS AS PART OF A FUTURE RELIGHTING PROJECT AT TWO FEDERAL FACILITIES.
This spending item is part of a $87,771 allocation. See details
Public Buildings Service 12/30/2009
ENGINEERED PRODUCTS, A PAPE COMPANY $41,217 Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and
This spending item is part of a $126,569,270 allocation. See details
Public Buildings Service 12/11/2009
Krazan & Associates Inc $37,440 Provide Construction Management as Agent (CMa) services for the Lighting Upgrades Project in US Courthouse, Seattle, WA
This spending item is part of a $74,560 allocation. See details
Public Buildings Service 5/04/2010
APSI CONSTRUCTION MANAGEMENT $37,120 Provide Construction Management as Agent (CMa) services for the Lighting Upgrades Project in US Courthouse, Seattle, WA
This spending item is part of a $74,560 allocation. See details
Public Buildings Service 5/04/2010
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. $33,973 The purpose of this award is to provide archaeological monitoring during remediation activities and all ground disturbing activities associated with the demolition of the Federal Building 1202 in Seattle, Washington. Prior to commencing monitoring, an Arc Public Buildings Service 4/15/2010
EHS-INTERNATIONAL, INC. $33,440 Provide the preparation of Opinion Repsonse Plan, Planning meeting with DOE, Site Characterization Documentation, Vinyl Chloride Remediation Study, Devleop Site Cleanup standards, Develop Final Reponse Doucment and Sample existing groundwater monitoring w Public Buildings Service 9/13/2011
Akb Engineers Inc PS $30,000 TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING.
This spending item is part of a $8,367,060 allocation. See details
Public Buildings Service 12/28/2009
SHANNON & WILSON, INC. $29,497 Engineering analysis and investigation of existing building
This spending item is part of a $154,263 allocation. See details
Public Buildings Service 5/06/2009
MASTER CRAFT ELECTRIC, INC. $29,186 Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation. See details
Public Buildings Service 3/25/2010
MCKINSTRY ESSENTION, INC. $27,750 RECOVERY: CONSTRUCTION MANAGEMENT ASSIST AND COMMISSIONING AUTHORITY SERVICES IN SUPPORT OF REPLACE BOILER, CHILLER, FAN-COILS AND WINDOWS DESIGN/BUILD CONSTRUCTION PROJECT AT THE US BORDER STATION LOCATED IN PORTHILL IDAHO.
This spending item is part of a $61,803 allocation. See details
Public Buildings Service 12/09/2010
MOVE MANAGEMENT CENTER, THE $25,185 moving services to relocate multiple agencies Public Buildings Service 8/07/2009
APSI CONSTRUCTION MANAGEMENT $24,340 Mechanical engineering support services to the Architectural and Engineering Services branch at Auburn, WA
This spending item is part of a $272,020 allocation. See details
Public Buildings Service 2/28/2011
CORNERSTONE ARCHITECTURAL GROUP, PS $21,907 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009
PERFORMANCE ABATEMENT SERVICES, INC. $18,045 The purpose of this project is to provide a roof system(s) that balances and meets the ARRA requirements, initial capital, sustainability, life costs, good stewardship, and historical preservation and performance for the Federal Center South Building 1201
This spending item is part of a $3,328,647 allocation. See details
Public Buildings Service 3/19/2010
EHS-INTERNATIONAL, INC. $16,985 Soil Sampling at Federal Center South, Seattle Public Buildings Service 9/08/2009
SIGNET PARTNERS, A CORPORATION $15,820 Federal Center South Master Plan Update Study. Update 2001 site planning component of the Federal Center South Redevelopment Feasibility Study to provide site development concepts for a secured Federal campus supporting agencies with extraordinary securit
This spending item is part of a $73,622 allocation. See details
Public Buildings Service 5/20/2009
NORTHERN MANAGEMENT SERVICES, INC. $14,796 Northern Management Services, Inc. (NMSI) shall provide all personnel and any equipment as necessary to perform Hydronic Water System Analysis and Balancing services at the Seattle Federal Office Building (FOB) located in Seattle, WA in accordance with th Public Buildings Service 3/09/2011
American Air Measurement $9,420 Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo
This spending item is part of a $777,576 allocation. See details
Public Buildings Service 3/25/2010
PETERSON, STREHLE & MARTINSON INC $9,300 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009
VETERAN SALES, LLC $7,204 Manufacture, deliver, and install office furniture for GSA Swing Space.
This spending item is part of a $7,694,601 allocation. See details
General Services Administration 6/17/2010
ACEPEX MANAGEMENT CORPORATION $5,784 This contract is used to track labor hours in support of the Seattle Courthouse ARRA program. There are a total of 70 hours available overall; an estimated 45 hours regular time and 25 hours overtime. There are no subcontractors planned for this work. Public Buildings Service 12/02/2010
BROOKS RANGE CONTRACT SERVICES, INC. $5,782 Provide access and escort assistance to construction contractors. Provide eqiupment and system information to construction contractor. Assist instalation teams with operation of equipment in Auburn Washington. Public Buildings Service 12/02/2010
CASCADE DESIGN COLLABORATIVE $5,500 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009
Mayes Testing Engineers $5,336 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009
LORACHE CAD/IT SERVICES LLC $5,038 Contractor shall provided all management, supervision, labor, materials, supplies equipment and shall plan, schedule, coordinate and assure effective performance for the successful completion of the Warehouse 7 Dock Electrical for VA project.
This spending item is part of a $11,451 allocation. See details
Public Buildings Service 6/24/2010
GLUMAC $5,000 DLR Group (Architect) - $20,000 Glumac (Mechanical/Electrical/Plumbing Consultant) - $5,000 Dick Anderson Construction (Local Strategic Affiliate) - $5,000. Note: DLR Group is the company's actual name and is not an acronym.
This spending item is part of a $40,000 allocation. See details
Public Buildings Service 6/30/2010
D'AMATO, CONVERSANO, INC. $4,564 Construction Administration services for new U.S. Courthouse in Austin, TX. Construction Administration services last 36 months.
This spending item is part of a $1,959,793 allocation. See details
Public Buildings Service 7/25/2009
Travis, Fitzmaurice & Associates Inc $3,000 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009
P.B.S. ENVIRONMENTAL BUILDING CONSULTANTS INC. $2,745 Laboratory anlaysis for asbestos content. Public Buildings Service 7/02/2009
ACCESS SERVICES, INC. $2,385 FSC Storage Design Build Public Buildings Service 8/07/2009
Queen City Sheet Metal and Roofing, Inc. $1,029 Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa
This spending item is part of a $46,072 allocation. See details
Public Buildings Service 10/07/2009