Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Yakima County, Wash., funds by Interior, Department of

Listing $27,025,275.65 in stimulus funds from Interior, Department of for Yakima

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
SUNNYSIDE DIVISION BOARD OF CONTROL $21,400,000 Yakima River Basin Water Enhancement Project (YRBWEP) The Enclosed Lateral Improvement projects (ELIPS) is the conversion of seven open irrigation ditches/pipes and weir boxes to enclosed laterals and in line flow meters. Gravity pressure in most cases will allow landowners to eliminate pumps or re... Show more Bureau of Reclamation 9/16/2009
EMERICK CONSTRUCTION CO INC $1,680,915 The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation. See details
Indian Affairs (Assistant Secretary) 9/25/2009
YAKAMA TRIBAL COUNCIL $801,554 Highway Planning and Construction see cell C26 Indian Affairs (Assistant Secretary) 5/19/2010
TRIAD MECHANICAL, INC. $745,899 Roza Diversion Dam Roller Gate Replacement
This spending item is part of a $1,054,477 allocation. See details
Bureau of Reclamation 9/29/2009
YAKAMA TRIBAL COUNCIL $716,924 Road Maintenance_Indian Roads PL 93-638 ARRA road repair and restoration project includes chip sealing, crack sealing, and striping of approximately 10.4 miles on existing rural roadways and residential housing units. These maintenance activities will extend the life of the existing Indian Affairs (Assistant Secretary) 3/15/2010
YAKAMA TRIBAL COUNCIL $375,000 Forests and Woodlands Resource Management Fuels Biomass Demo *Note: Previous report for CY09Q3(FY09Q4) reported in error as a Contract not a Grant. Indian Affairs (Assistant Secretary) 8/17/2009
YAKAMA TRIBAL COUNCIL $375,000 Forests and Woodlands Resource Management Fuels Biomass Demo Indian Affairs (Assistant Secretary) 8/17/2009
ALLEN BRADBURY CONSTRUCTION LLC $284,448 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
TOTAL CONTROL ELECTRIC INC. $176,614 The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation. See details
Indian Affairs (Assistant Secretary) 9/25/2009
YAKAMA TRIBAL COUNCIL $173,400 Title I Grants to Local Educational Agencies, Recovery Act Improve teaching and learning for students most at risk of failing to meet state achievement academic standards. PURPOSE: For Yakama Nation Tribal School to improve teacher strategies and instructional techniques. SCOPE: To improve the nece... Show more Indian Affairs (Assistant Secretary) 1/13/2010
YAKAMA TRIBAL COUNCIL $67,115 Education Technology State Grants, Recovery Act Educational Technology State Grants to States to improve student academic achievement through the innovative use and the effective integration of new and emerging technology with teacher training, curriculum development, and sucessfull research-based in... Show more Indian Affairs (Assistant Secretary) 5/13/2010
COLUMBIA ASPHALT & GRAVEL, INC. $61,913 The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation. See details
Indian Affairs (Assistant Secretary) 9/25/2009
Complete Quality Construction $20,310 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
COBURN ELECTRIC INC. $18,798 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
Muffett & Sons Construction, L.L.C. $18,280 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
APOLLO SHEET METAL, INC. $17,849 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
Fencing & Awning Inc $15,675 The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation. See details
Indian Affairs (Assistant Secretary) 9/25/2009
VALLEY TRUCK REPAIR INC $15,557 (ARRA) STEEL SIGNS - 'DESIGNATED ROUTE' & 'ROUTE END' Bureau of Land Management 11/23/2009
BRUNER PAINTING INC $12,890 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
Works Plumbing Specialty $10,000 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
GREAT FLOORS LLC $9,471 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
Arrowhead Roofing $8,600 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
RJS CONSTRUCTION, INC. $7,946 The renovation of the Yakima Tribal School in Washington. The scope of work include a new gym floor, new bleachers, new windows and doors, bathroom renovation, locker room renovation, new floor and ceiling finishes, kitchen renovation, new bus parking, a
This spending item is part of a $2,458,094 allocation. See details
Indian Affairs (Assistant Secretary) 9/25/2009
BLAIR BUILDERS LLC $5,293 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
Builder Services Group, Inc. $3,874 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
FULCRUM ENVIRONMENTAL CONSULTING INC $1,050 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009
COLUMBIA BASIN NETWERKS $900 Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install.
This spending item is part of a $411,763 allocation. See details
U.S. Fish and Wildlife Service 12/30/2009