Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Dane County, Wis., funds by Interior, Department of

Listing $7,298,930.68 in stimulus funds from Interior, Department of for Dane

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC $4,898,147 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
UNIVERSITY OF WISCONSIN SYSTEM $300,000 Volcano Hazards Program Research and Monitoring. We are carrying out a broad set of studies aimed at improving our understanding of the internal structure of two Alaskan volcanoes, Okmok and Mt. Augustine, and the seismogenic structures that lie within them, with the ultimate goal of improving seismi... Show more Geological Survey 11/17/2009
University of Wisconsin $300,000 U.S. Geological Survey_ Research and Data Collection ARRA 14 0803 High-Resolution Analysis of Structure and Seismicity of Alaskan Volcanoes Geological Survey 11/17/2009
BLUESCOPE CONSTRUCTION, INC. $256,119 Provide new fire alarm and fire suppression system in the Maintenance/Garage located at National Wildlife Health Center, Madison, WI. In addition, connect the new fire alarm system to the Main Building's annuciator panel. Upgrade Tight Isolation Buildin Geological Survey 3/26/2010
VAN ERT ELECTRIC COMPANY, INC. $230,000 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
MAC SOLUTIONS INC $197,856 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
SUSTAINABLE ENGINEERING GROUP, LLC $169,750 Perform Commissioning Services at Flandreau Indian School
This spending item is part of a $198,745 allocation. See details
Indian Affairs (Assistant Secretary) 2/02/2010
PIEPER ELECTRIC, INC. $159,654 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
DAIRYLAND ELECTRIC CO., INC. $103,506 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
AFFILIATED ENGINEERS INC $83,563 Preparation of contract documents for the rehabilitation of the Union Building Phase 2 Interior at Keweenaw National Historical Park, Calumet, Michigan
This spending item is part of a $294,870 allocation. See details
National Park Service 9/10/2009
PIONEER ROOFING, LLC $59,963 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
McKinley's Corp $53,500 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
PROFESSIONAL SYSTEM ANALYSIS, INC. $50,919 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
Central Ceilings Systems, Inc. $50,669 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
STRANG, INC. $50,485 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
Labtech Midwest Inc $49,770 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
CTA INC. $46,860 USGS National Wildlife Health Center Fire Alarm Fire Sprinkler Upgades - Madison, Wisconsin Geological Survey 9/17/2009
C3 LIMITED LIABILITY COMPANY $44,500 Provide Title III (Construction Managment) tasks for energy savings performance contract at National Wildlife Health Center, Madison, Wisconsin - $38,500. Modification 0001 - Add Title III Construction Management services in support of Phase 2 of the Ener Geological Survey 9/08/2010
KJWW, P.C $38,135 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
Livesey Painting, Inc. $36,521 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
BIG RED MACHINERY MOVERS, INC $33,040 Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan
This spending item is part of a $6,012,164 allocation. See details
Geological Survey 3/24/2010
BERNTSEN INTERNATIONAL, INC. $31,688 Survey monuments Bureau of Land Management 8/17/2010
BERNTSEN INTERNATIONAL, INC. $30,360 Survey Monuments Bureau of Land Management 9/12/2009
BERNTSEN INTERNATIONAL, INC. $12,792 Cadastral Monuments Bureau of Land Management 5/20/2010
CROP PRODUCTION SERVICES, INC. $11,134 Chemicals U.S. Fish and Wildlife Service 9/15/2009