FORMERLY USED DEFENSE SITE INSTALLATION ID: AZ99799F512600

LAGUNA MANEUVER AREA

30 miles ne of yuma, Arizona

Cost So Far

$1.25M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$1.03B

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2070

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

The War Department acquired a total of 20,146.24 acres for the subject site. The southern end of this site is approximately 30 miles northeast of Yuma, Arizona. All leases for 16,787.72 acres were terminated between 22 June 1946 and 21 August... see more » The War Department acquired a total of 20,146.24 acres for the subject site. The southern end of this site is approximately 30 miles northeast of Yuma, Arizona. All leases for 16,787.72 acres were terminated between 22 June 1946 and 21 August 1947. Total acres disposed of equals 20,146.24. Present uses of the property include residential, commercial, and grazing. Remaining DoD improvements include four buildings, one brick-lined underground tank, three concrete underground oil tanks, and various concrete slabs, bunkers, and footings. The four buildings are beneficially used as barns. This property is known or suspected to contain military munitions and explosives of concern (e.g., unexploded ordnance) and therefore may present an explosive hazard. (Source: U.S. Army Corps of Engineers) « see less

16 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

12 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: 16OEW

LAGUNA DAM IMPACT AREA

Multi Use Range

Cost

$11.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2053

This site is under ongoing monitoring until Sep 2082

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony 0.22 mg/kg Copper 16.0 mg/kg Aluminum 11000.0 mg/kg

See more details...

Site ID: 04OEW

BOMB TARGET # 6

Multi Use Range

Cost

$7.53M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2051

This site is under ongoing monitoring until Sep 2079

Site ID: 10OEW

STONE CABIN IMPACT AREA

Medium/Large Caliber

Cost

$9.72M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2051

This site is under ongoing monitoring until Sep 2080

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 7.4 mg/kg Copper 9.5 mg/kg Zinc 25.0 mg/kg Strontium 190.0 mg/kg Barium 200.0 mg/kg Aluminum 8300.0 mg/kg

See more details...

Site ID: 13OEW

SOUTH MANEUVER AREA

Multi Use Range

Cost

$835M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2070

This site is under ongoing monitoring until Sep 2093

Contaminated Areas

Soil: Low Risk

Contaminants: Mercury and compounds 0.0037 mg/kg Silver 0.062 mg/kg Cadmium 0.14 mg/kg Molybdenum 0.21 mg/kg Selenium 0.38 mg/kg Beryllium 0.51 mg/kg Arsenic 2.7 mg/kg Cobalt 6.7 mg/kg Copper 13.0 mg/kg Nickel 14.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 14.0 mg/kg Lead 21.0 mg/kg Vanadium 25.0 mg/kg Zinc 46.0 mg/kg Strontium 64.0 mg/kg Barium 160.0 mg/kg Manganese 490.0 mg/kg Titanium 500.0 mg/kg Aluminum 12000.0 mg/kg Iron 17000.0 mg/kg

See more details...

Site ID: 14OEW

NORTH IMPACT AREA

Medium/Large Caliber

Cost

$42.8M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2058

This site is under ongoing monitoring until Sep 2087

Contaminated Areas

Soil: Low Risk

Contaminants: Silver 0.069 mg/kg Cadmium 0.27 mg/kg Molybdenum 0.34 mg/kg Selenium 0.44 mg/kg Beryllium 0.53 mg/kg Cobalt 11.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 27.0 mg/kg Nickel 28.0 mg/kg Vanadium 44.0 mg/kg Lead 110.0 mg/kg Zinc 120.0 mg/kg Strontium 180.0 mg/kg Barium 350.0 mg/kg Manganese 1100.0 mg/kg

See more details...

Site ID: 15OEW

MARTINEZ LAKE IMPACT AREA

Multi Use Range

Cost

$9.66M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2051

This site is under ongoing monitoring until Sep 2080

Contaminated Areas

Soil: Medium Risk

Contaminants: Lead 6.3 mg/kg Copper 13.0 mg/kg Strontium 140.0 mg/kg Barium 320.0 mg/kg Aluminum 12000.0 mg/kg

See more details...

Site ID: 17OEW

MUGGINS HILLS IMPACT AREA

Multi Use Range

Cost

$6.64M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2050

This site is under ongoing monitoring until Sep 2079

Contaminated Areas

Soil: Medium Risk

Contaminants: Antimony 0.19 mg/kg Nickel 6.3 mg/kg Lead 44.0 mg/kg Strontium 190.0 mg/kg Zinc 200.0 mg/kg Barium 250.0 mg/kg Copper 360.0 mg/kg Titanium 400.0 mg/kg Aluminum 11000.0 mg/kg

See more details...

Site ID: 05OEW

EAST AND WEST IMPACT AREAS

Multi Use Range

Cost

$10.3M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2055

This site is under ongoing monitoring until Sep 2084

Contaminated Areas

Soil: Low Risk

Contaminants: Mercury and compounds 0.023 mg/kg Silver 0.14 mg/kg Cadmium 0.2 mg/kg Molybdenum 0.23 mg/kg Selenium 0.58 mg/kg Beryllium 0.64 mg/kg Arsenic 4.3 mg/kg Cobalt 9.6 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 16.0 mg/kg Copper 21.0 mg/kg Nickel 29.0 mg/kg Vanadium 30.0 mg/kg Lead 70.0 mg/kg Zinc 89.0 mg/kg Barium 220.0 mg/kg Strontium 290.0 mg/kg Manganese 490.0 mg/kg Titanium 840.0 mg/kg Aluminum 20000.0 mg/kg Iron 22000.0 mg/kg

See more details...

Site ID: 06OEW

CAMP HORN TRAINING RANGES

Multi Use Range

Cost

$84M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2060

This site is under ongoing monitoring until Sep 2089

Contaminated Areas

Soil: Low Risk

Contaminants: Silver 0.081 mg/kg Cadmium 0.19 mg/kg Molybdenum 0.5 mg/kg Selenium 0.5 mg/kg Beryllium 0.76 mg/kg Cobalt 13.0 mg/kg Nickel 14.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 15.0 mg/kg Copper 30.0 mg/kg Vanadium 37.0 mg/kg Strontium 140.0 mg/kg Barium 210.0 mg/kg Manganese 560.0 mg/kg

See more details...

Site ID: 03OEW

BOMB TARGET # 4

Air to Land

Cost

$6.8M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2050

This site is under ongoing monitoring until Sep 2079

Contaminated Areas

Soil: Low Risk

Contaminants: Silver 0.052 mg/kg Cadmium 0.15 mg/kg Selenium 0.52 mg/kg Molybdenum 0.71 mg/kg Beryllium 0.75 mg/kg Cobalt 9.3 mg/kg Vanadium 38.0 mg/kg Copper 56.0 mg/kg Nickel 60.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 87.0 mg/kg Strontium 97.0 mg/kg Barium 810.0 mg/kg Manganese 2700.0 mg/kg

See more details...

Site ID: 11OEW

CIBOLA BOMB TARGET

Air to Land

Cost

$5.8M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2050

This site is under ongoing monitoring until Sep 2078

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 6.0 mg/kg Copper 17.0 mg/kg Strontium 190.0 mg/kg Barium 250.0 mg/kg Aluminum 18000.0 mg/kg

See more details...

Site ID: 01OEW

BOMB TARGET # 1

Air to Land

Cost

$4.92M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2049

This site is under ongoing monitoring until Sep 2078

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 9.9 mg/kg Copper 13.0 mg/kg Zinc 26.0 mg/kg Strontium 63.0 mg/kg Barium 190.0 mg/kg Aluminum 8300.0 mg/kg

See more details...

4 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: 09OEW

AIR TO GROUND GUNNERY RANGE

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Sep 2010

Contaminated Areas

Soil: Low Risk

Contaminants: Zinc 24.0 mg/kg Barium 250.0 mg/kg Strontium 270.0 mg/kg

See more details...

Site ID: 08OEW

MANEUVER AREA # 2

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

May 2014

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony 0.8 mg/kg Lead 10.0 mg/kg Copper 29.0 mg/kg Zinc 29.0 mg/kg Strontium 300.0 mg/kg

See more details...

Site ID: 02OEW

LAGUNA MANEUVER AREA - AREA B

Site Not Recommended For Action

Cost

Unknown

Final Cleanup Action

Aug 2001

Site ID: 07OEW

VEHICULAR ACCESS/ MANEUVER AREAS

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Dec 2007

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »