Back to Map
NAVY INSTALLATION ID: CA917002291500

SUNNYVALE NIROP

sunnyvale, California

Total Cost

$147K

Money spent on the evaluation and cleanup of hazardous sites at this installation.

Completion Date

1994

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

16 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

16 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00006

SUNNYVALE NIROP

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1989

Site ID: SITE 00014

SUNNYVALE NIROP

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Aug 1989

Site ID: SITE 00001

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jan 1990

Site ID: SITE 00002

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jan 1990

Site ID: SITE 00003

SUNNYVALE NIROP

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Apr 1989

Site ID: SITE 00004

SUNNYVALE NIROP

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jan 1990

Site ID: SITE 00005

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Apr 1990

Site ID: SITE 00007

SUNNYVALE NIROP

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1989

Site ID: SITE 00008

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1988

Site ID: SITE 00009

SUNNYVALE NIROP

Waste Lines

Cost

Unknown

Final Cleanup Action

May 1990

Site ID: SITE 00010

SUNNYVALE NIROP

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Apr 1994

Site ID: SITE 00011

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 1991

Site ID: SITE 00013

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1991

Site ID: SITE 00015

SUNNYVALE NIROP

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1989

Site ID: SITE 00016

SUNNYVALE NIROP

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 1991

Site ID: SITE 00012

SUNNYVALE NIROP

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1989

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »