NAVY INSTALLATION ID: CA917002332300

PORT HUENEME NCBC

port hueneme, California

Cost So Far

$78.9M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$10.4M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2021

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

31 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

7 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00019

PORT HUENEME NCBC

Contaminated Sediments

Cost

$1.13M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2016

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Sediment (Human): High Risk

Contaminants: Acetone 0.07 ppb DDD 0.09 ppb Benz(a)anthracene 0.12 ppb Benzo[a]pyrene 0.16 ppb Benzo[k]fluoranthene 0.18 ppb DDE 0.22 ppb Pyrene 0.27 ppb Dibutyl phthalate 0.27 ppb Mercury 0.3 ppb Benzo[b]fluoranthene 0.43 ppb Beryllium and compounds 0.44 ppb DDT 0.55 ppb Fluoranthene 0.62 ppb Phenanthrene 0.79 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.92 ppb Selenium 2.08 ppb Polychlorinated biphenyls (PCBs) 3.8 ppb Cadmium and compounds 5.8 ppb Nickel and compounds 15.6 ppb Arsenic (cancer) 22.9 ppb Chromium VI and compounds 52.9 ppb Zinc 157.0 ppb Copper and compounds 200.0 ppb Lead 270.0 ppb Manganese and compounds 945.0 ppb Barium and compounds 1000.0 ppb

Sediment (Marine): High Risk

Contaminants: Acetone 0.07 ppb DDD,4,4- 0.09 ppb Phenanthrene 0.09 ppb Benz[a]anthracene 0.12 ppb Benzo[a]pyrene 0.16 ppb Benzo[k]fluoranthene 0.18 ppb DDE 0.22 ppb Chrysene 0.25 ppb Pyrene 0.27 ppb Fluoranthene 0.27 ppb Dibutyl phthalate 0.27 ppb Mercury and compounds (inorganic) 0.3 ppb Benzo[b]fluoranthene 0.43 ppb Beryllium and compounds 0.44 ppb DDT 0.55 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.92 ppb Selenium 2.08 ppb Polychlorinated biphenyls (PCBs) 3.8 ppb Cadmium and compounds 4.0 ppb Arsenic (cancer endpoint) 9.4 ppb Nickel and compounds 15.6 ppb Chromium (total) 25.0 ppb Copper and compounds 47.8 ppb Zinc 157.0 ppb Lead 270.0 ppb

See more details...

Site ID: UXO 000001

PORT HUENEME NCBC

Pistol Range

Cost

$572K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

Contaminated Areas

Surface Water (Marine): Low Risk

Contaminants: Lead 200000.0 ppb

See more details...

Site ID: SWMU 00002

PORT HUENEME NCBC

Contaminated Soil Piles

Cost

$2.99M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2018

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: Low Risk

Contaminants: Heptachlor 800.0 ppb Endrin 1000.0 ppb Dieldrin 22000.0 ppb Nickel (Soluble Salts) 32600.0 ppb Copper and compounds 43100.0 ppb

Soil: Low Risk

Contaminants: Benzo(a)Pyrene 0.17 ppb Aroclor 1254 0.97 ppb

See more details...

Site ID: SITE 00005

PORT HUENEME NCBC

Mixed Waste Area

Cost

$87K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2016

This site is under ongoing monitoring until Mar 2018

Contaminated Areas

Soil: Low Risk

Contaminants: di-n-Octyl phthalate 0.02 ppb Dibutyl phthalate 0.02 ppb Anthracene 0.03 ppb Indeno[1,2,3-cd]pyrene 0.04 ppb Benz(a)anthracene 0.04 ppb Benzo[a]pyrene 0.05 ppb Phenanthrene 0.05 ppb Benzo[b]fluoranthene 0.07 ppb Benzo[k]fluoranthene 0.07 ppb Pyrene 0.08 ppb Chrysene 0.09 ppb Fluoranthene 0.14 ppb Butyl benzyl phthalate 0.19 ppb Carbazole 0.34 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.56 ppb Antimony and compounds 0.81 ppb Arsenic (noncancer) 7.5 ppb Chromium VI and compounds 23.9 ppb Copper and compounds 27.6 ppb Nickel and compounds 29.7 ppb Vanadium 47.2 ppb Lead 48.9 ppb Barium and compounds 60.0 ppb Zinc 119.0 ppb Manganese and compounds 452.0 ppb Aluminum 11800.0 ppb Iron 31400.0 ppb

See more details...

Site ID: SITE 00020

PORT HUENEME NCBC

Underground Storage Tanks

Cost

$203K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2013

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Soil: High Risk

Contaminants: di-n-Octyl phthalate 0.02 ppb Chrysene 0.02 ppb Toluene 0.11 ppb Benzene 0.16 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.18 ppb Naphthalene 0.2 ppb Beryllium and compounds 0.45 ppb Thallium 0.94 ppb Arsenic (cancer) 4.0 ppb Ethylbenzene 4.5 ppb Lead 12.3 ppb Xylene (mixed) 13.0 ppb Acetone 20.0 ppb Chromium VI and compounds 23.6 ppb Nickel and compounds 24.3 ppb Copper and compounds 29.9 ppb Vanadium 40.4 ppb Zinc 70.6 ppb Barium and compounds 114.0 ppb Manganese and compounds 799.0 ppb Aluminum 18800.0 ppb Iron 47700.0 ppb

Groundwater: Low Risk

Contaminants: Phenanthrene 610.0 ppb Acenaphthene 630.0 ppb Dibutyl phthalate 640.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3600.0 ppb Diethyl phthalate 3900.0 ppb Phenol 11000.0 ppb Methylphenol, 4- 53000.0 ppb Methylnaphthalene,2 94000.0 ppb Naphthalene 260000.0 ppb Toluene 280000.0 ppb Acetone 390000.0 ppb Xylene (mixed) 4400000.0 ppb Ethylbenzene 4700000.0 ppb Benzene 8200000.0 ppb

See more details...

Site ID: SITE 00006

PORT HUENEME NCBC

Mixed Waste Area

Cost

$22K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2015

This site is under ongoing monitoring until Mar 2017

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.26 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.76 ppb Arsenic (cancer) 3.0 ppb Copper and compounds 8.6 ppb Nickel and compounds 10.8 ppb Chromium (III) 11.9 ppb Lead 22.5 ppb Vanadium 27.5 ppb Chromium VI and compounds 30.0 ppb Zinc 31.8 ppb Barium and compounds 147.0 ppb Manganese and compounds 387.0 ppb Aluminum 6350.0 ppb Iron 14500.0 ppb

See more details...

Site ID: UST 000002

PORT HUENEME NCBC

Underground Storage Tanks

Cost

$1.15M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Diethyl phthalate 630.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 920.0 ppb Toluene 1000.0 ppb o-Xylene 1600.0 ppb Xylene (mixed) 4000.0 ppb Methyl ethyl ketone 31000.0 ppb Ether,tert-butyl methyl 2800000.0 ppb

See more details...

24 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: UST 000003

PORT HUENEME NCBC

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2012

Contaminated Areas

Groundwater: Low Risk

Contaminants: Manganese and compounds 1740.0 ppb

Soil: Low Risk

Contaminants: Xylene (mixed) 0.04 ppb Phenol 0.44 ppb Beryllium and compounds 1.1 ppb Lead 10.0 ppb

See more details...

Site ID: UST 000004

PORT HUENEME NCBC

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jan 1989

Site ID: SITE 00017

PORT HUENEME NCBC

Mixed Waste Area

Cost

Unknown

Final Cleanup Action

May 2002

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Carbon tetrachloride 1000.0 ppb Arsenic (cancer) 2600.0 ppb Lead 4200.0 ppb Antimony and compounds 5100.0 ppb Chromium VI and compounds 6500.0 ppb Vanadium 40700.0 ppb Molybdenum 52600.0 ppb Manganese and compounds 913000.0 ppb

Soil: Low Risk

Contaminants: Heptachlor 0.32 ppb Chlordane 5.2 ppb Lead 650.0 ppb

See more details...

Site ID: UST 000005

PORT HUENEME NCBC

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2001

This site is under ongoing monitoring until Feb 2013

Contaminated Areas

Groundwater: Low Risk

Contaminants: Naphthalene 140.0 ppb Toluene 600.0 ppb

Sediment (Human): Low Risk

Contaminants: Phenanthrene 240.0 ppb

Soil: Low Risk

Contaminants: Pentachlorophenol 0.43 ppb Benz(a)anthracene 0.5 ppb Benzo[k]fluoranthene 0.53 ppb Benzo[a]pyrene 0.59 ppb Chrysene 0.77 ppb Benzo[b]fluoranthene 1.1 ppb Phenanthrene 240.0 ppb

See more details...

Site ID: SWMU 00001

PORT HUENEME NCBC

Contaminated Soil Piles

Cost

Unknown

Final Cleanup Action

Sep 2013

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Heptachlor 800.0 ppb Endrin 1000.0 ppb Dieldrin 22000.0 ppb Nickel (Soluble Salts) 32600.0 ppb Copper and compounds 43100.0 ppb

Soil: Medium Risk

Contaminants: Benz(a)Anthracene 0.17 ppb Aroclor 1254 228.0 ppb

See more details...

Site ID: SITE 00012

PORT HUENEME NCBC

Spill Site Area

Cost

$202K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2014

This site is under ongoing monitoring until Mar 2045

Contaminated Areas

Soil: Low Risk

Contaminants: DDT 0.09 ppb Polychlorinated biphenyls (PCBs) 10.0 ppb

See more details...

Site ID: SITE 00014

PORT HUENEME NCBC

Landfill

Cost

$4.97M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2005

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: High Risk

Contaminants: DDE 1.3 ppb Beryllium and compounds 1.3 ppb DDT 1.7 ppb Polychlorinated biphenyls (PCBs) 3.5 ppb Cadmium and compounds 7.9 ppb Benzo[a]pyrene 33.0 ppb Benz[a]anthracene 37.0 ppb Arsenic (cancer) 41.3 ppb Nickel and compounds 102.0 ppb Vanadium 109.0 ppb Chromium VI and compounds 147.0 ppb Manganese and compounds 921.0 ppb Lead 2400.0 ppb Zinc 3510.0 ppb

Groundwater: Medium Risk

Contaminants: DDD 2100.0 ppb Xylene (mixed) 3000.0 ppb Dichloroethylene, 1,2- (trans) 5000.0 ppb Naphthalene 17000.0 ppb Carbon disulfide 23000.0 ppb Arsenic (cancer) 26900.0 ppb Cadmium and compounds 30800.0 ppb Dichloroethylene, 1,2- (cis) 31000.0 ppb Chromium VI and compounds 33300.0 ppb Vanadium 53600.0 ppb Lead 64500.0 ppb Antimony and compounds 73900.0 ppb Molybdenum 78700.0 ppb Barium and compounds 116000.0 ppb Zinc 178000.0 ppb Manganese and compounds 6690000.0 ppb

See more details...

Site ID: SITE 00015

PORT HUENEME NCBC

Storage Area

Cost

$36K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2014

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Soil: Low Risk

Contaminants: Polychlorinated biphenyls (PCBs) 2.3 ppb

See more details...

Site ID: SITE 00018

PORT HUENEME NCBC

Spill Site Area

Cost

Unknown

Final Cleanup Action

May 1999

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.78 ppb Selenium 1.1 ppb Chromium VI and compounds 26.3 ppb Nickel and compounds 32.5 ppb Manganese and compounds 831.0 ppb

See more details...

Site ID: SITE 00021

PORT HUENEME NCBC

Storage Area

Cost

$60K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2013

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Naphthalene 600.0 ppb Lead 1900.0 ppb Toluene 3000.0 ppb Antimony and compounds 5300.0 ppb Cadmium and compounds 9000.0 ppb Chromium VI and compounds 11100.0 ppb Arsenic (cancer) 11900.0 ppb Manganese and compounds 3280000.0 ppb

Soil: Low Risk

Contaminants: Benzo[a]pyrene 0.17 ppb Chromium (total) 37.2 ppb Lead 294.0 ppb

See more details...

Site ID: SITE 00016

PORT HUENEME NCBC

Mixed Waste Area

Cost

$37K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2012

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Arsenic (cancer) 2100.0 ppb Lead 5400.0 ppb Zinc 41800.0 ppb Molybdenum 42800.0 ppb Manganese and compounds 411000.0 ppb

Soil: Low Risk

Contaminants: Hexane, n- 0.02 ppb Beryllium and compounds 0.63 ppb Cadmium and compounds 2.5 ppb Arsenic (cancer) 5.5 ppb Selenium 7.6 ppb Chromium VI and compounds 24.0 ppb Barium and compounds 137.0 ppb Manganese and compounds 759.0 ppb

See more details...

Site ID: SITE 00001

PORT HUENEME NCBC

Storage Area

Cost

Unknown

Final Cleanup Action

Nov 1994

Site ID: SITE 00002

PORT HUENEME NCBC

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Nov 1994

Site ID: SITE 00003

PORT HUENEME NCBC

Radioactive Waste Area

Cost

Unknown

Final Cleanup Action

Nov 1994

Site ID: SITE 00008

PORT HUENEME NCBC

Mixed Waste Area

Cost

$55K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2012

This site is under ongoing monitoring until Mar 2017

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Chloroform 1000.0 ppb Benzene 1000.0 ppb Chromium VI and compounds 5300.0 ppb Antimony and compounds 57700.0 ppb Zinc 76900.0 ppb Selenium 201000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 210000.0 ppb Manganese and compounds 871000.0 ppb

Soil: Low Risk

Contaminants: Benzo[a]pyrene 0.05 ppb Polychlorinated biphenyls (PCBs) 1.5 ppb Beryllium and compounds 1.5 ppb Selenium 2.0 ppb Arsenic (cancer) 8.3 ppb Cadmium and compounds 8.6 ppb Nickel and compounds 37.7 ppb Chromium VI and compounds 49.6 ppb Manganese and compounds 2520.0 ppb

See more details...

Site ID: SITE 00009

PORT HUENEME NCBC

Burn Area

Cost

$218K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2012

This site is under ongoing monitoring until Mar 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Bromodichloromethane 7000.0 ppb Cadmium and compounds 7200.0 ppb Dichloroethane, 1,2- (EDC) 8000.0 ppb Thallium 9400.0 ppb Lead 18000.0 ppb Dichloroethylene, 1,2- (trans) 28000.0 ppb Antimony and compounds 68400.0 ppb Selenium 149000.0 ppb

Soil: Medium Risk

Contaminants: DDT 0.07 ppb DDE 0.29 ppb Indeno[1,2,3-cd]pyrene 0.42 ppb Beryllium and compounds 1.1 ppb Polychlorinated biphenyls (PCBs) 1.5 ppb Benzo[k]fluoranthene 1.5 ppb Benzene 1.6 ppb Benzo[a]pyrene 2.1 ppb Benzo[b]fluoranthene 2.4 ppb Chrysene 6.9 ppb Cadmium and compounds 13.4 ppb Pyrene 30.0 ppb Nickel and compounds 31.3 ppb Fluoranthene 36.0 ppb Chromium VI and compounds 99.8 ppb Lead 281.0 ppb Zinc 630.0 ppb Barium and compounds 887.0 ppb Manganese and compounds 974.0 ppb

See more details...

Site ID: SITE 00010

PORT HUENEME NCBC

Surface Disposal Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2014

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Arsenic (cancer) 5700.0 ppb Chromium VI and compounds 7400.0 ppb Antimony and compounds 59200.0 ppb Manganese and compounds 876000.0 ppb

Sediment (Human): Low Risk

Contaminants: Chrysene 0.21 ppb Benzo[b]fluoranthene 0.22 ppb

Soil: Low Risk

Contaminants: N-Nitroso di-n-propylamine 0.17 ppb Pentachlorophenol 0.77 ppb Beryllium and compounds 1.4 ppb Vanadium 64.2 ppb Zinc 93.7 ppb Barium and compounds 129.0 ppb Manganese and compounds 796.0 ppb

See more details...

Site ID: SITE 00011

PORT HUENEME NCBC

Mixed Waste Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2014

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Arsenic (cancer) 5100.0 ppb Lead 5200.0 ppb Zinc 45900.0 ppb Antimony and compounds 63400.0 ppb Molybdenum 78100.0 ppb Manganese and compounds 458000.0 ppb

Soil: Low Risk

Contaminants: Pentachlorophenol 0.2 ppb Polychlorinated biphenyls (PCBs) 0.23 ppb Lead 10.7 ppb Chromium VI and compounds 20.9 ppb

See more details...

Site ID: SITE 00007

PORT HUENEME NCBC

Radioactive Waste Area

Cost

Unknown

Final Cleanup Action

Jan 2014

Contaminated Areas

Soil: Low Risk

Contaminants: Arsenic 30.0 ppb

See more details...

Site ID: SITE 00004

PORT HUENEME NCBC

Sewage Effluent Settling Ponds

Cost

$36K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2014

This site is under ongoing monitoring until Mar 2026

Contaminated Areas

Groundwater: High Risk

Contaminants: Carbon tetrachloride 1000.0 ppb Arsenic (cancer) 3500.0 ppb Chromium VI and compounds 7700.0 ppb Copper and compounds 18100.0 ppb Phosphorus (white) 280000.0 ppb Manganese and compounds 1050000.0 ppb

Soil: Low Risk

Contaminants: Polychlorinated biphenyls (PCBs) 0.03 ppb Benzo[a]pyrene 0.05 ppb Benz(a)anthracene 0.06 ppb Benzo[b]fluoranthene 0.11 ppb Mercury 0.17 ppb Beryllium and compounds 1.1 ppb Manganese and compounds 1080.0 ppb

See more details...

Site ID: SITE 00023

PORT HUENEME NCBC

Mixed Waste Area

Cost

Unknown

Final Cleanup Action

Mar 2012

Contaminated Areas

Soil: Low Risk

Contaminants: DDT 0.02 ppb Polychlorinated biphenyls (PCBs) 13.8 ppb

See more details...

Site ID: SITE 00013

PORT HUENEME NCBC

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Mar 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Polychlorinated biphenyls (PCBs) 28.0 ppb

See more details...

Site ID: UXO 000002

PORT HUENEME NCBC

Small Arms Range

Cost

Unknown

Final Cleanup Action

Mar 2015

Contaminated Areas

Surface Water (Marine): Low Risk

Contaminants: Lead 200000.0 ppb

See more details...

Site ID: UST 000001

PORT HUENEME NCBC

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 2011

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Naphthalene 810000.0 ppb Benzene 6700000.0 ppb Ethylbenzene 7600000.0 ppb Toluene 9100000.0 ppb Xylene (mixed) 14900000.0 ppb

Soil: Low Risk

Contaminants: Methylene chloride 31.0 ppb Benzene 120.0 ppb Naphthalene 130.0 ppb Ethylbenzene 590.0 ppb Toluene 1700.0 ppb Xylene (mixed) 3250.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »