Back to Map
NAVY INSTALLATION ID: CA917002452800

CONCORD NWS

concord, California

Cost So Far

$152M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$60M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2027

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

33 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions. see more » a deed restriction is documented in the parcel deed. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

13 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00042

CONCORD NWS

Spill Site Area

Cost

$2.87M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2022

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 400000.0 ppb

Soil: Medium Risk

Contaminants: Trichloroethylene (TCE) 400.0 ppb

See more details...

Site ID: SITE 00022

CONCORD NWS

Storage Area

Cost

$41.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2022

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 0.7 ppb Lead 165.0 ppb Arsenic (noncancer) 199.0 ppb

See more details...

Site ID: SITE 0022A

CONCORD NWS

Storage Area

Cost

$778K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2016

This site is under ongoing monitoring until Sep 2046

Contaminated Areas

Soil: High Risk

Contaminants: Arsenic 53.0 ppb

See more details...

Site ID: SITE 00029

CONCORD NWS

Spill Site Area

Cost

$4.07M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2019

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 4300000.0 ppb

Soil: Medium Risk

Contaminants: Benzo[a]pyrene 0.15 ppb Beryllium and compounds 16.0 ppb Cadmium and compounds 460.0 ppb Lead 3400.0 ppb

See more details...

Site ID: UXO 000010

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

$966K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2017

This site is under ongoing monitoring until Dec 2047

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 32.5 ppb

See more details...

Site ID: UXO 000003

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

$1.1M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2016

This site is under ongoing monitoring until May 2050

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo(a)Pyrene 0.27 ppb Beryllium and compounds 1.0 ppb Arsenic 21.6 ppb Antimony and compounds 84.2 ppb Lead 5590.0 ppb

Groundwater: Low Risk

Contaminants: Manganese and compounds 3130000.0 ppb

See more details...

Site ID: UXO 000011

CONCORD NWS

Unexploded Munitions and Ordnance Area

Cost

$5.4M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2019

This site is under ongoing monitoring until May 2048

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzene 570.0 ppb Trichloroethylene (TCE) 39000.0 ppb Tetrachloroethylene 63000.0 ppb cis-1,2-Dichloroethylene 290000.0 ppb

Soil: Medium Risk

Contaminants: Lead 1420.0 ppb

See more details...

Site ID: UXO 000012

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

$646K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2017

This site is under ongoing monitoring until Jun 2047

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: UXO 00001A

CONCORD NWS

Unexploded Munitions and Ordnance Area

Cost

$1.26M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2017

This site is under ongoing monitoring until Aug 2048

Contaminated Areas

Soil: High Risk

Contaminants: Cadmium and compounds 3.0 ppb Selenium 4.4 ppb Cobalt 31.0 ppb Chromium (III) 63.0 ppb Arsenic 140.0 ppb Vanadium 150.0 ppb Antimony and compounds 700.0 ppb Zinc 2100.0 ppb Copper and compounds 12000.0 ppb Lead 62000.0 ppb

See more details...

Site ID: SITE 00041

CONCORD NWS

Storage Area

Cost

$564K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2019

Contaminated Areas

Soil: Low Risk

Contaminants: Arsenic 7.0 ppb

Groundwater: Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Surface Water (Human): Risk Not Evaluated

See more details...

Site ID: UXO 000013

CONCORD NWS

Training and Maneuver Area

Cost

$998K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2017

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00013

CONCORD NWS

Burn Area

Cost

Unknown

Final Cleanup Action

Dec 2016

Contaminated Areas

Groundwater: Low Risk

Contaminants: Manganese and compounds 3130000.0 ppb Nitrate 9600000.0 ppb

Soil: Low Risk

Contaminants: Benzo[a]pyrene 0.27 ppb Beryllium and compounds 0.9 ppb Cadmium and compounds 15.7 ppb Antimony and compounds 84.2 ppb Lead 5590.0 ppb Barium and compounds 50500.0 ppb Aluminum 79700.0 ppb

See more details...

Site ID: SWMU 00005

CONCORD NWS

Underground Storage Tanks

Cost

$642K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2013

Contaminated Areas

Groundwater: High Risk

Contaminants: Naphthalene 1000.0 ppb Mercury and compounds (inorganic) 1900.0 ppb Methylene chloride 3000.0 ppb Trichloroethylene (TCE) 3000.0 ppb Methylnaphthalene,2 3000.0 ppb Phenol 4000.0 ppb 1,2-Dichloroethylene (mixture) 5000.0 ppb Dichloroethane, 1,1- 6000.0 ppb Tetrachloroethylene (PCE) 7000.0 ppb Beryllium and compounds 7100.0 ppb Antimony and compounds 7800.0 ppb Molybdenum 14800.0 ppb Cadmium and compounds 20300.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 28000.0 ppb Arsenic (cancer) 167000.0 ppb Lead 672000.0 ppb Copper and compounds 1360000.0 ppb Vanadium 1620000.0 ppb Nickel and compounds 2070000.0 ppb Zinc 2620000.0 ppb Barium and compounds 4750000.0 ppb Manganese and compounds 15500000.0 ppb Aluminum 486000000.0 ppb Iron 831000000.0 ppb

Soil: Medium Risk

Contaminants: Lead 62.6 ppb

See more details...

20 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SWMU 00013

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SWMU 00014

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: UXO 000009

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Mar 2010

Site ID: CONCORDENV

CONCORD NWS

Unknown Site Type

Cost

$7.27M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Nov 2023

Site ID: SWMU 00023

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: UXO 000006

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2007

Site ID: SWMU 00016

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: Low Risk

Contaminants: Dieldrin 0.01 ppb DDT 0.02 ppb Chlordane, alpha- (2) 0.02 ppb DDD 0.02 ppb DDE 0.03 ppb

See more details...

Site ID: SITE 00027

CONCORD NWS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Carbon disulfide 0.01 ppb Dieldrin 0.07 ppb DDE,4,4- 0.1 ppb Acetone 0.11 ppb Arochlor 1254 1.0 ppb DDD,4,4- 8.2 ppb Chlordane 47.0 ppb

See more details...

Site ID: SWMU 00018

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jun 2009

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 2300.0 ppb Antimony and compounds 6100.0 ppb Arsenic (cancer) 91900.0 ppb Lead 128000.0 ppb Copper and compounds 835000.0 ppb Vanadium 974000.0 ppb Nickel and compounds 1480000.0 ppb Barium and compounds 2940000.0 ppb Manganese and compounds 9720000.0 ppb Aluminum 300000000.0 ppb

Soil: Low Risk

Contaminants: Xylene 0.01 ppb

See more details...

Site ID: SWMU 00022

CONCORD NWS

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: Low Risk

Contaminants: Methyl chloride 0.01 ppb Acetone 0.03 ppb Beryllium and compounds 0.17 ppb Antimony and compounds 0.56 ppb Arsenic (noncancer) 3.5 ppb Lead 7.6 ppb Nickel and compounds 12.9 ppb Copper and compounds 21.1 ppb Vanadium 33.9 ppb Zinc 60.9 ppb Barium and compounds 94.7 ppb Manganese and compounds 340.0 ppb Aluminum 10400.0 ppb Iron 15100.0 ppb

See more details...

Site ID: SWMU 00024

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SWMU 00025

CONCORD NWS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SWMU 00026

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 0.74 ppb Ethylbenzene 1.1 ppb Toluene 1.6 ppb Xylene (mixed) 8.4 ppb

See more details...

Site ID: UXO 000002

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2007

Site ID: UXO 000004

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Soil: High Risk

Contaminants: Lead 121.0 ppb Copper and compounds 220.0 ppb Manganese and compounds 300000.0 ppb Aluminum 420000.0 ppb

See more details...

Site ID: UXO 000005

CONCORD NWS

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Oct 2008

Site ID: SWMU 00017

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SWMU 00001

CONCORD NWS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Groundwater: Low Risk

Contaminants: Tetrachloroethylene (PCE) 6000.0 ppb

See more details...

Site ID: SWMU 00002

CONCORD NWS

Burn Area

Cost

Unknown

Final Cleanup Action

Jun 2009

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethyl benzene 600.0 ppb Toluene 1300.0 ppb Xylene 3000.0 ppb 1,1-Dichloroethylene 6500.0 ppb Trichloroethylene (TCE) 38000.0 ppb 1,1,2,2-Tetrachloroethane 102000.0 ppb

Soil: High Risk

Contaminants: Xylene 0.01 ppb Cadmium and compounds 3.5 ppb Arsenic (noncancer) 14.3 ppb Barium and compounds 212.0 ppb Lead 334.0 ppb

See more details...

Site ID: SWMU 00007

CONCORD NWS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 2009

Contaminated Areas

Groundwater: High Risk

Contaminants: 1,2-Dichloroethane (EDC) 2000.0 ppb Selenium 2400.0 ppb Antimony and compounds 3500.0 ppb Beryllium and compounds 4700.0 ppb Mercury and compounds (inorganic) 7200.0 ppb Acetone 11000.0 ppb Molybdenum 14200.0 ppb Arsenic (cancer) 239000.0 ppb Lead 371000.0 ppb Vanadium 2640000.0 ppb Copper and compounds 2800000.0 ppb Zinc 3390000.0 ppb Nickel and compounds 4590000.0 ppb Barium and compounds 8070000.0 ppb Manganese and compounds 38300000.0 ppb Aluminum 1010000000.0 ppb Iron 1560000000.0 ppb

Soil: High Risk

Contaminants: Acetone 0.07 ppb Cadmium and compounds 0.1 ppb Beryllium and compounds 0.26 ppb Antimony and compounds 0.41 ppb Arsenic (noncancer) 4.8 ppb Nickel and compounds 15.5 ppb Lead 25.0 ppb Copper and compounds 30.1 ppb Vanadium 43.3 ppb Zinc 69.7 ppb Barium and compounds 119.0 ppb Manganese and compounds 325.0 ppb Aluminum 11900.0 ppb Iron 24400.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »