Back to Map
NAVY INSTALLATION ID: CA917002453000

EL CENTRO NAF

el centro, California

Cost So Far

$57.2M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$24.3M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2024

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

26 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

8 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00002

EL CENTRO NAF

Landfill

Cost

$3.26M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2017

This site is under ongoing monitoring until Jun 2032

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 2500.0 ppb Cadmium and compounds 2700.0 ppb Methylene chloride 6000.0 ppb Lead 15000.0 ppb Silver and compounds 16300.0 ppb Copper and compounds 67200.0 ppb Selenium 88000.0 ppb Zinc 122000.0 ppb

Soil: High Risk

Contaminants: Chromium VI and compounds 668.0 ppb Lead 110000.0 ppb

See more details...

Site ID: UXO 000001

EL CENTRO NAF

Small Arms Range

Cost

$1.83M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2021

Contaminated Areas

Soil: Medium Risk

Contaminants: Dibenz[ah]anthracene 130.0 ppb Benzo(a)Pyrene 260.0 ppb Arsenic 290.0 ppb Lead 87500.0 ppb

See more details...

Site ID: SITE 00018

EL CENTRO NAF

Surface Disposal Area

Cost

$2.87M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2020

This site is under ongoing monitoring until Jun 2031

Contaminated Areas

Soil: Medium Risk

Contaminants: Lead 2200.0 ppb

See more details...

Site ID: UXO 000003

EL CENTRO NAF

Unexploded Munitions and Ordnance Area

Cost

$11.3M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2022

This site is under ongoing monitoring until Oct 2051

Site ID: UXO 000004

EL CENTRO NAF

Small Arms Range

Cost

$3.16M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2023

Contaminated Areas

Soil: Medium Risk

Contaminants: Arsenic 366.0 ppb Tin 530.0 ppb Chrysene 970.0 ppb Dibenz[ah]anthracene 1100.0 ppb Benz(a)Anthracene 2800.0 ppb Benzo(a)Pyrene 3900.0 ppb Lead 70600.0 ppb

See more details...

Site ID: UST 000004

EL CENTRO NAF

Underground Storage Tanks

Cost

$330K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2015

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 5.0 ppb

See more details...

Site ID: UST 000003

EL CENTRO NAF

Underground Storage Tanks

Cost

$128K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2016

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 5.0 ppb

See more details...

Site ID: UXO 000002

EL CENTRO NAF

Small Arms Range

Cost

$2.11M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2023

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 205.0 ppb

See more details...

18 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00012

EL CENTRO NAF

Burn Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: 2,3,7,8-TCDD(dioxin) 41000.0 ppb Arsenic (cancer) 800000.0 ppb Beryllium and compounds 1130000.0 ppb Cadmium and compounds 2630000.0 ppb Chromium VI and compounds 73200000.0 ppb Lead 81000000.0 ppb Copper and compounds 111000000.0 ppb Zinc 1200000000.0 ppb

Soil: Low Risk

Contaminants: Beryllium and compounds 1.38 ppb Arsenic (cancer) 14.0 ppb Chromium VI and compounds 73.2 ppb Copper and compounds 111.0 ppb Zinc 1200.0 ppb

See more details...

Site ID: SITE 00001

EL CENTRO NAF

Landfill

Cost

$1.73M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Mar 2032

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 1400.0 ppb Polychlorinated biphenyls (PCBs) 1500.0 ppb Beryllium and compounds 2400.0 ppb Cadmium and compounds 3900.0 ppb Nickel and compounds 5000.0 ppb Arsenic (cancer endpoint) 5500.0 ppb Silver and compounds 6900.0 ppb Zinc 30500.0 ppb Copper and compounds 42700.0 ppb Selenium 66000.0 ppb

See more details...

Site ID: SITE 00015

EL CENTRO NAF

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: Arsenic (cancer endpoint) 31500.0 ppb Toluene 180000000.0 ppb Benzene 690000000.0 ppb Ethylbenzene 980000000.0 ppb Xylene (mixed) 999999000.0 ppb

See more details...

Site ID: SITE 00017

EL CENTRO NAF

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 1100.0 ppb Beryllium and compounds 2200.0 ppb Cadmium and compounds 2700.0 ppb Dibenzo-p-dioxin,1,2,3,7,8,9-hexachloro- 3900.0 ppb Selenium 4000.0 ppb Arsenic (cancer endpoint) 5900.0 ppb Silver and compounds 9900.0 ppb Antimony and compounds 15100.0 ppb Copper and compounds 21600.0 ppb Zinc 27600.0 ppb Arochlor 1260 110000.0 ppb Phenanthrene 19000000.0 ppb

See more details...

Site ID: UST 000001

EL CENTRO NAF

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2004

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 5.0 ppb

See more details...

Site ID: UST 000002

EL CENTRO NAF

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2013

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 50.0 ppb

See more details...

Site ID: SITE 00016

EL CENTRO NAF

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: Low Risk

Contaminants: Cyanide of potassium 1.3 ppb Cyanide (free) 2.2 ppb Arsenic (cancer) 7.0 ppb

See more details...

Site ID: SITE 00010

EL CENTRO NAF

Sewage Effluent Settling Ponds

Cost

Unknown

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Mar 2013

Contaminated Areas

Groundwater: High Risk

Contaminants: Bromodichloromethane 1000.0 ppb Lead 2700.0 ppb Chloroform 3000.0 ppb Beryllium and compounds 3700.0 ppb Arsenic (cancer endpoint) 6400.0 ppb Thallium carbonate 10000.0 ppb Silver and compounds 12800.0 ppb Cadmium and compounds 18000.0 ppb Antimony and compounds 19200.0 ppb Nickel and compounds 31200.0 ppb Selenium 33900.0 ppb Copper and compounds 41900.0 ppb Zinc 47700.0 ppb

See more details...

Site ID: SITE 00007

EL CENTRO NAF

Underground Tank Farm

Cost

$587K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 1999

This site is under ongoing monitoring until Mar 2027

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 2400.0 ppb Vinyl chloride 6300.0 ppb Lead 11000.0 ppb Arsenic (cancer endpoint) 15400.0 ppb Naphthalene 160000.0 ppb 1,2-Dichloroethane 1700000.0 ppb Benzene 20000000.0 ppb

Soil: High Risk

Contaminants: Benzene 4000.0 ppb

See more details...

Site ID: SITE 00013

EL CENTRO NAF

Incinerator

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.7 ppb Arsenic (cancer) 4.0 ppb

See more details...

Site ID: SITE 00014

EL CENTRO NAF

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Lead 2700.0 ppb Silver and compounds 9000.0 ppb Benzene 10000.0 ppb Zinc 16300.0 ppb Copper and compounds 59700.0 ppb

See more details...

Site ID: SITE 00003

EL CENTRO NAF

Landfill

Cost

Unknown

Final Cleanup Action

Sep 1999

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Cadmium and compounds 2100.0 ppb Beryllium and compounds 2400.0 ppb Silver and compounds 15600.0 ppb Zinc 22000.0 ppb Copper and compounds 59800.0 ppb Selenium 146000.0 ppb

See more details...

Site ID: SITE 00004

EL CENTRO NAF

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 1400.0 ppb Lead 8000.0 ppb Silver and compounds 9900.0 ppb

See more details...

Site ID: SITE 00005

EL CENTRO NAF

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Dibromochloromethane 1000.0 ppb Beryllium and compounds 4800.0 ppb Cadmium and compounds 5300.0 ppb Silver and compounds 21600.0 ppb Selenium 228000.0 ppb

Soil: Low Risk

Contaminants: Beryllium and compounds 1.1 ppb Arsenic (cancer endpoint) 4.8 ppb

See more details...

Site ID: SITE 00006

EL CENTRO NAF

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 2400.0 ppb Selenium 224000.0 ppb Nitrate 58100000.0 ppb

See more details...

Site ID: SITE 00008

EL CENTRO NAF

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: High Risk

Contaminants: Cadmium and compounds 14.1 ppb Copper and compounds 239.0 ppb Arsenic (cancer endpoint) 323.0 ppb

See more details...

Site ID: SITE 00009

EL CENTRO NAF

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.07 ppb DDE 0.1 ppb Silver and compounds 0.3 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.91 ppb Butyl benzyl phthalate 1.3 ppb Cadmium and compounds 2.9 ppb Arsenic (cancer endpoint) 3.2 ppb Nickel and compounds 16.8 ppb Lead 18.0 ppb Copper and compounds 20.3 ppb Zinc 58.5 ppb

See more details...

Site ID: SITE 00011

EL CENTRO NAF

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: High Risk

Contaminants: Arsenic (cancer endpoint) 2200.0 ppb Beryllium and compounds 2400.0 ppb Cadmium and compounds 4400.0 ppb Lead 5200.0 ppb Silver and compounds 5700.0 ppb Copper and compounds 10600.0 ppb Zinc 37000.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »