NAVY INSTALLATION ID: CA917002755100

AZUSA NCCOSC MORRIS DAM FACILITY

san diego, California

Cost So Far

$18M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$1.22M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2016

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

2 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

1 Active Site

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00002

AZUSA NCCOSC MORRIS DAM FACILITY

Contaminated Ground Water

Cost

$1.38M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

This site is under ongoing monitoring until Sep 2018

Contaminated Areas

Groundwater: High Risk

Contaminants: Arsenic 11600.0 ppb Perchlorate 57000.0 ppb Chromium 114000.0 ppb

Sediment (Fresh): High Risk

Contaminants: Mercury 0.73 ppb Antimony and compounds 11.0 ppb

Sediment (Human): High Risk

Contaminants: Mercury and compounds 0.73 ppb Antimony and compounds 11.0 ppb Molybdenum 100.0 ppb

Soil: High Risk

Contaminants: Perchlorate 0.754 ppb Beryllium and compounds 5.4 ppb Cadmium and compounds 36.7 ppb Chromium VI and compounds 111.0 ppb Silver and compounds 196.0 ppb Lithium 548.0 ppb Manganese and compounds 563.0 ppb Arsenic 648.0 ppb Lead 3610.0 ppb Copper and compounds 4310.0 ppb

See more details...

1 Inactive Site

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00001

AZUSA NCCOSC MORRIS DAM FACILITY

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Jan 1993

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »