Cost So Far
$289M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$53.2M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2019
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
211 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, warning signs, barriers. see more » a barrier, including but not limited to a paved surface or landfill cap, must be maintained in order to prevent exposure to contaminants, including vapor intrusion into an enclosed structure. a fence around controlled area, with or without gate. gate(s) and/or door(s) must be locked to prevent access and exposure to contaminants. a warning sign is in place surrounding the area prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. « see less
9 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 01120
CAMP PENDLETON MCB
Maintenance Yard
Cost
$6.69M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2018
Contaminated Areas
Soil: High Risk
Contaminants: Heptachlor Epoxide 88000.0 ppb Dieldrin 220000.0 ppb Benzo(a)Pyrene 370000.0 ppb 4,4-DDE 5400000.0 ppb 4,4-DDT 7400000.0 ppb Toxaphene 28000000.0 ppb 2-Methyl-4-Chlorophenoxyacetic Acid 42000000.0 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE 01118
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
$3.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2017
This site is under ongoing monitoring until Aug 2021
Contaminated Areas
Groundwater: High Risk
Contaminants: Carbon Dichloride 7000.0 ppb Alpha, Beta-Dichloroethane 12000.0 ppb Trichloroethylene (TCE) 12000.0 ppb
Site ID: SITE 01121
CAMP PENDLETON MCB
Chemical Disposal
Cost
$1.95M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
This site is under ongoing monitoring until Dec 2022
Contaminated Areas
Groundwater: High Risk
Contaminants: 4,4-DDT 1600.0 ppb 4,4-DDD 7200.0 ppb Tetrachloroethylene 500000.0 ppb cis-1,2-Dichloroethylene 860000.0 ppb Naphthalene 6000000.0 ppb 1,1,2-Trichloroethane 7300000.0 ppb Arsenic 19900000.0 ppb Trichloroethylene (TCE) 25000000.0 ppb 1,1,1,2-Tetrachloroethane 110000000.0 ppb
Site ID: SITE 01115
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
$4.58M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2016
This site is under ongoing monitoring until Oct 2023
Contaminated Areas
Groundwater: High Risk
Contaminants: Trichloroethylene (TCE) 45000.0 ppb
Site ID: SITE 01119
CAMP PENDLETON MCB
Chemical Disposal
Cost
$8.79M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2016
This site is under ongoing monitoring until Mar 2025
Contaminated Areas
Groundwater: High Risk
Contaminants: 1,1-Dichloroethylene 1100.0 ppb Trichloroethylene (TCE) 11000.0 ppb 1,2,3-Trichloropropane 70000.0 ppb
Soil: Risk Not Evaluated
Site ID: SITE 00150
CAMP PENDLETON MCB
Maintenance Yard
Cost
$1.67M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Oct 2020
Contaminated Areas
Soil: Low Risk
Contaminants: Butyl benzyl phthalate 0.19 ppb Toluene 6.4 ppb Xylene (mixed) 13.0 ppb
Site ID: SITE 00033
CAMP PENDLETON MCB
Spill Site Area
Cost
$2.58M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2013
This site is under ongoing monitoring until Oct 2040
Contaminated Areas
Groundwater: High Risk
Contaminants: Mercury and compounds (inorganic) 300.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 640.0 ppb Diethyl phthalate 1600.0 ppb Selenium 5900.0 ppb Nickel and compounds 52000.0 ppb Aluminum 86200.0 ppb Barium and compounds 172000.0 ppb Zinc 187000.0 ppb Manganese and compounds 2200000.0 ppb PCE 3600000.0 ppb Iron 8700000.0 ppb
Soil: Risk Not Evaluated
Site ID: SITE 01116
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
$4.23M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2012
This site is under ongoing monitoring until Nov 2023
Contaminated Areas
Groundwater: High Risk
Contaminants: Vinyl Chloride 1600.0 ppb Trichloroethylene (TCE) 58000.0 ppb
Site ID: SITE 00021
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
$3.25M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2011
This site is under ongoing monitoring until Oct 2023
Contaminated Areas
Groundwater: High Risk
Contaminants: Ethyl benzene 23000.0 ppb Vinyl Chloride 27000.0 ppb 1,2-Dichloroethylene (trans) 31000.0 ppb 1,2-Dichloroethylene (cis) 71000.0 ppb Tetrachloroethylene 552000.0 ppb
Sediment (Fresh): High Risk
Contaminants: HCH (beta) 150.0 ppb
Sediment (Human): Medium Risk
Contaminants: Trichloroethylene (TCE) 0.4 ppb Vanadium 70.0 ppb Copper and compounds 280.0 ppb
202 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 00008
CAMP PENDLETON MCB
Landfill
Cost
Unknown
Final Cleanup Action
Sep 1998
This site is under ongoing monitoring until Oct 2007
Contaminated Areas
Groundwater: Low Risk
Contaminants: Arsenic (cancer) 1000.0 ppb
Site ID: SITE 00009
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 1996
This site is under ongoing monitoring until Aug 2005
Contaminated Areas
Surface Water (Human): Medium Risk
Contaminants: Arsenic (cancer endpoint) 1400.0 ppb Nickel and compounds 8100.0 ppb Zinc 9200.0 ppb Copper and compounds 25000.0 ppb Aluminum 355000.0 ppb
Groundwater: Low Risk
Contaminants: Dichloroethane, 1,2- (EDC) 2000.0 ppb Dichloroethylene, 1,2- (mixture) 5000.0 ppb Tetrachloroethylene (PCE) 10000.0 ppb Trichloroethylene (TCE) 15000.0 ppb
Surface Water (Fresh): Low Risk
Contaminants: Arsenic (cancer endpoint) 1400.0 ppb Nickel and compounds 8100.0 ppb Zinc 9200.0 ppb
Soil: Risk Not Evaluated
Site ID: SITE 00011
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1995
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00013
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jan 1995
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00015
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Oct 1995
Contaminated Areas
Groundwater: Risk Not Evaluated
Site ID: SITE 00016
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1998
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Site ID: SITE 00017
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Site ID: SITE 00018
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Site ID: SITE 00019
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Feb 1997
Site ID: SITE 00022
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Feb 1997
Site ID: SITE 00023
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Oct 1995
Contaminated Areas
Groundwater: Risk Not Evaluated
Site ID: SITE 00024
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1995
Contaminated Areas
Groundwater: Risk Not Evaluated
Soil: Risk Not Evaluated
Site ID: SITE 00025
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1995
Contaminated Areas
Sediment (Marine): Low Risk
Contaminants: Dichlorobenzene, 1,4- 0.03 ppb Trichlorobenzene, 1,2,4- 0.03 ppb
Sediment (Human): Risk Not Evaluated
Site ID: SITE 00026
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: SITE 00027
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SITE 00029
CAMP PENDLETON MCB
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00030
CAMP PENDLETON MCB
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 2010
Contaminated Areas
Groundwater: High Risk
Contaminants: Arsenic (cancer) 3800.0 ppb Chromium VI and compounds 6600.0 ppb
Soil: High Risk
Contaminants: Beryllium and compounds 1.7 ppb Chromium VI and compounds 52.1 ppb Arsenic (cancer) 93.5 ppb Antimony and compounds 368.0 ppb Manganese and compounds 5140.0 ppb Lead 109000.0 ppb
Site ID: SITE 00031
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00032
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Groundwater: Risk Not Evaluated
Soil: Risk Not Evaluated
Site ID: SITE 00034
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00035
CAMP PENDLETON MCB
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00037
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00038
CAMP PENDLETON MCB
Waste Lines
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00041
CAMP PENDLETON MCB
Waste Lines
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00042
CAMP PENDLETON MCB
Waste Lines
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00043
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Jun 1996
Contaminated Areas
Groundwater: Risk Not Evaluated
Site ID: SITE 00044
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Site ID: SITE 00048
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Surface Water (Marine): Low Risk
Contaminants: Lead 1000.0 ppb Arsenic (cancer) 1000.0 ppb
Site ID: SITE 00049
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.01 ppb Toluene 0.6 ppb
Site ID: SITE 00050
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jun 1993
Site ID: SITE 00051
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.93 ppb
Site ID: SITE 00052
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.53 ppb
Site ID: SITE 00054
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 2001
Contaminated Areas
Groundwater: Low Risk
Contaminants: Molybdenum 10.0 ppb Zinc 120.0 ppb Vanadium 150.0 ppb Barium and compounds 410.0 ppb Nickel and compounds 490.0 ppb Aluminum 28100.0 ppb Iron 40400.0 ppb
Site ID: SITE 00055
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb Acetone 0.02 ppb
Site ID: SITE 00056
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Methylene Chloride 0.44 ppb
Site ID: SITE 00057
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.01 ppb Toluene 0.29 ppb
Site ID: SITE 00058
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.02 ppb
Site ID: SITE 00059
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.19 ppb
Site ID: SITE 00060
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene, methyl- 0.55 ppb
Site ID: SITE 00063
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Ethylbenzene 0.01 ppb Xylene (mixed) 0.06 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.15 ppb
Site ID: SITE 00064
CAMP PENDLETON MCB
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Apr 2009
Site ID: SITE 00065
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 0.037 ppb Endrin 0.0398 ppb Dieldrin 0.0403 ppb DDD 0.197 ppb DDE 0.211 ppb
Site ID: SITE 00067
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.03 ppb Ethylbenzene 0.41 ppb Toluene 3.9 ppb
Site ID: SITE 00068
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.01 ppb Toluene 0.02 ppb
Site ID: SITE 00070
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.02 ppb
Site ID: SITE 00071
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: o-Xylene 0.34 ppb
Site ID: SITE 00072
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.02 ppb Acenaphthene 0.78 ppb Dibenz[ah]anthracene 0.85 ppb Benzo[k]fluoranthene 3.2 ppb Phenanthrene 4.6 ppb Pyrene 5.2 ppb
Site ID: SITE 00074
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Sediment (Fresh): Medium Risk
Contaminants: Lead 2.9 ppb Nickel and compounds 32.0 ppb Zinc 36.5 ppb Chromium VI and compounds 48.4 ppb Vanadium 49.2 ppb Copper and compounds 52.1 ppb Aluminum 8710.0 ppb
Groundwater: Low Risk
Contaminants: Zinc 60.0 ppb Molybdenum 70.0 ppb Antimony and compounds 170.0 ppb
Site ID: SITE 00075
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Methyl chloride 0.72 ppb Phenanthrene 6.3 ppb Xylene (mixed) 19.0 ppb Naphthalene 34.0 ppb Methylnaphthalene,2 73.0 ppb
Site ID: SITE 00076
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Ethylbenzene 1.4 ppb Xylene (mixed) 8.7 ppb
Site ID: SITE 00077
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Methylene chloride 0.01 ppb Acetone 0.05 ppb Toluene 0.11 ppb
Site ID: SITE 00080
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.18 ppb Phenanthrene 0.44 ppb Fluorene 0.69 ppb
Site ID: SITE 00082
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (mixed) 3.8 ppb
Site ID: SITE 00083
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.06 ppb
Site ID: SITE 00084
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.07 ppb Toluene 1.1 ppb
Site ID: SITE 00086
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.06 ppb Butyl benzyl phthalate 0.24 ppb
Site ID: SITE 00087
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb
Site ID: SITE 00088
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.26 ppb
Site ID: SITE 00089
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (mixed) 0.19 ppb
Site ID: SITE 00090
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.35 ppb
Site ID: SITE 00091
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: o-Xylene 6.6 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE 00092
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Sediment (Fresh): Medium Risk
Contaminants: Toluene 0.11 ppb Mercury 0.69 ppb Nickel and compounds 22.7 ppb Zinc 28.8 ppb Chromium VI and compounds 36.7 ppb Vanadium 36.7 ppb Aluminum 7240.0 ppb
Site ID: SITE 00094
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 1.1 ppb
Site ID: SITE 00095
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.17 ppb
Site ID: SITE 00099
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Naphthalene 1.6 ppb
Site ID: SITE 00100
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (mixed) 9.8 ppb
Site ID: SITE 00102
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 2.9 ppb Bis(2-ethylhexyl)phthalate (DEHP) 6.0 ppb Naphthalene 6.8 ppb
Site ID: SITE 00103
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1997
Contaminated Areas
Sediment (Fresh): Medium Risk
Contaminants: Acetone 0.02 ppb Mercury and compounds (inorganic) 0.86 ppb Lead 5.0 ppb Vanadium 32.7 ppb Chromium VI and compounds 43.8 ppb Zinc 57.5 ppb Barium and compounds 90.5 ppb Aluminum 8150.0 ppb
Site ID: SITE 00104
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Butyl benzyl phthalate 0.44 ppb
Site ID: SITE 00107
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: o-Xylene 0.054 ppb Fluorene 0.065 ppb Benzene, methyl- 0.07 ppb Acetone 0.086 ppb Naphthalene 0.16 ppb
Site ID: SITE 00108
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 1993
Contaminated Areas
Sediment (Fresh): Low Risk
Contaminants: Lead 4.6 ppb Vanadium 22.3 ppb Zinc 26.5 ppb Barium and compounds 84.8 ppb Aluminum 5110.0 ppb
Site ID: SITE 00109
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.032 ppb Ethyl benzene 2.1 ppb o-Xylene 12.0 ppb
Site ID: SITE 00110
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Phenanthrene 0.25 ppb Benz(a)anthracene 0.29 ppb Benzo[a]pyrene 0.31 ppb Chrysene 0.41 ppb Fluoranthene 0.64 ppb
Site ID: SITE 00111
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toxaphene 0.09 ppb
Site ID: SITE 00112
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.29 ppb
Site ID: SITE 00113
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.14 ppb
Site ID: SITE 00115
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.4 ppb
Site ID: SITE 00117
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene, methyl- 0.024 ppb
Site ID: SITE 00118
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.066 ppb Benzene, methyl- 0.68 ppb Ethyl benzene 0.9 ppb o-Xylene 0.93 ppb
Site ID: SITE 00119
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene, methyl- 0.024 ppb
Site ID: SITE 00120
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 1.2 ppb
Site ID: SITE 00123
CAMP PENDLETON MCB
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Chromium (III) 11.5 ppb Vanadium 39.0 ppb Barium and compounds 54.2 ppb Lead 54.5 ppb Zinc 397.0 ppb Aluminum 9310.0 ppb
Site ID: SITE 00124
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 3.3 ppb
Site ID: SITE 00125
CAMP PENDLETON MCB
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.14 ppb
Site ID: SITE 00126
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.19 ppb
Site ID: SITE 00127
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.4 ppb
Site ID: SITE 00128
CAMP PENDLETON MCB
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.02 ppb
Site ID: SITE 00131
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.18 ppb Naphthalene 0.92 ppb
Site ID: SITE 00133
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.23 ppb
Site ID: SITE 00134
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.02 ppb Toluene 0.05 ppb
Site ID: SITE 00135
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2004
Contaminated Areas
Soil: Low Risk
Contaminants: Ethylbenzene 0.14 ppb Toluene 0.18 ppb Xylene (mixed) 0.74 ppb
Site ID: SITE 00136
CAMP PENDLETON MCB
Washrack
Cost
Unknown
Final Cleanup Action
Oct 2004
Contaminated Areas
Surface Water (Human): Low Risk
Contaminants: Carbon Tetrachloride 11.0 ppb Benzene, methyl- 130.0 ppb
Site ID: SITE 00137
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Sediment (Fresh): Low Risk
Contaminants: Mercury 0.17 ppb Lead 3.5 ppb Zinc 15.2 ppb Aluminum 3940.0 ppb
Site ID: SITE 00140
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Sediment (Fresh): Medium Risk
Contaminants: Zinc 24.2 ppb Copper and compounds 31.1 ppb Chromium VI and compounds 31.6 ppb Aluminum 5390.0 ppb
Site ID: SITE 00141
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Naphthalene 4.1 ppb Toluene 27.0 ppb Ethylbenzene 51.0 ppb Xylene (mixed) 450.0 ppb
Surface Water (Fresh): Risk Not Evaluated
Site ID: SITE 00142
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.03 ppb
Site ID: SITE 00143
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (mixed) 0.09 ppb
Site ID: SITE 00144
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb
Site ID: SITE 00145
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.02 ppb
Site ID: SITE 00146
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb
Site ID: SITE 00148
CAMP PENDLETON MCB
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.03 ppb Bis(2-ethylhexyl)phthalate (DEHP) 9.4 ppb Fluorene 13.0 ppb Acenaphthene 19.0 ppb Naphthalene 49.0 ppb
Site ID: SITE 00149
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.47 ppb Xylene (mixed) 1.9 ppb
Site ID: SITE 00153
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb
Site ID: SITE 00154
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Methylene chloride 0.01 ppb Toluene 0.13 ppb
Site ID: SITE 00156
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Carbon Disulfide 0.003 ppb Acetone 0.035 ppb Toluene 0.25 ppb
Groundwater: Risk Not Evaluated
Surface Water (Marine): Risk Not Evaluated
Site ID: SITE 00157
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.15 ppb
Site ID: SITE 01001
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Antimony and compounds 1.0 ppb
Site ID: SITE 01003
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb
Site ID: SITE 01004
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2001
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb
Site ID: SITE 01006
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Antimony and compounds 1.0 ppb
Site ID: SITE 01007
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
May 2011
Contaminated Areas
Soil: High Risk
Contaminants: DDE 0.16 ppb Arsenic (cancer) 64.3 ppb Antimony and compounds 273.0 ppb Manganese and compounds 6780.0 ppb Lead 9560.0 ppb
Site ID: SITE 01008
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Antimony and compounds 1.0 ppb
Site ID: SITE 01111
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: High Risk
Contaminants: DDD,4,4- 34.0 ppb Arsenic (cancer) 48.0 ppb DDE,4,4- 73.0 ppb DDT 170.0 ppb
Site ID: SITE 01112
CAMP PENDLETON MCB
Burn Area
Cost
Unknown
Final Cleanup Action
Nov 2009
Contaminated Areas
Soil: High Risk
Contaminants: (2-Chloroethoxy)ethene 9.2 ppb Antimony Pentoxide 35.0 ppb Lead 1200.0 ppb
Site ID: SITE 01114
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: High Risk
Contaminants: Trichloroethylene (TCE) 22000.0 ppb
Site ID: SITE 02000
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Dec 2000
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 1.9 ppb Arsenic (cancer) 16.0 ppb Chromium VI and compounds 19.0 ppb Lead 2020.0 ppb Copper and compounds 8790.0 ppb Manganese and compounds 345000.0 ppb
Site ID: SITE 02002
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 02003
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Beryllium and compounds 0.98 ppb Arsenic (cancer) 8.0 ppb Chromium VI and compounds 8.3 ppb Lead 421.0 ppb
Site ID: SITE 02004
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Beryllium and compounds 1.0 ppb
Site ID: SITE 02005
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Beryllium and compounds 1.0 ppb
Site ID: SITE 62001
CAMP PENDLETON MCB
Contaminated Fill
Cost
Unknown
Final Cleanup Action
Sep 2014
Contaminated Areas
Soil: High Risk
Contaminants: Aroclor 1254 750.0 ppb
Site ID: UST 000011
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Jan 2012
Contaminated Areas
Groundwater: High Risk
Contaminants: Cadmium and compounds 30000.0 ppb Vanadium 30000.0 ppb Ether,tert-butyl methyl 63000.0 ppb Benzene 75000.0 ppb Toluene 90000.0 ppb Ethylbenzene 1950000.0 ppb Xylene (mixed) 3030000.0 ppb
Site ID: UST 000014
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2011
This site is under ongoing monitoring until Oct 2016
Contaminated Areas
Groundwater: High Risk
Contaminants: o-Xylene 1100.0 ppb Trichloroethylene (TCE) 3500.0 ppb Fluorene 14000.0 ppb Naphthalene 27000.0 ppb Vanadium 30000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 1300000.0 ppb
Site ID: UST 000043
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
$984K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2002
This site is under ongoing monitoring until Dec 2020
Contaminated Areas
Groundwater: High Risk
Contaminants: Nickel and compounds 10000.0 ppb Cadmium and compounds 30000.0 ppb Vanadium 80000.0 ppb Copper and compounds 170000.0 ppb Barium and compounds 620000.0 ppb Ethyl benzene 796000.0 ppb Benzene 1090000.0 ppb Lead 1400000.0 ppb Methyl tertbutyl ether (MTBE) 2830000.0 ppb Xylene 4450000.0 ppb Toluene 4790000.0 ppb Zinc 8900000.0 ppb
Site ID: UST 000015
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Jun 2015
Contaminated Areas
Groundwater: High Risk
Contaminants: Bromodichloromethane 1200.0 ppb Trichloroethylene (TCE) 3800.0 ppb 1,3,5-Trimethylbenzene 4800.0 ppb Ethyl benzene 6300.0 ppb Benzene 14000.0 ppb o-Xylene 17000.0 ppb Naphthalene 110000.0 ppb p-Chloronitrobenzene 1600000.0 ppb
Site ID: UST 000017
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Groundwater: High Risk
Contaminants: Benzene 800.0 ppb
Site ID: UST 000020
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1999
Site ID: UST 000021
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2004
This site is under ongoing monitoring until Dec 2013
Contaminated Areas
Groundwater: High Risk
Contaminants: Acetone 3800000.0 ppb Ethylbenzene 3950000.0 ppb Benzene 4633000.0 ppb Toluene 19056000.0 ppb Xylene (mixed) 21838000.0 ppb
Site ID: UST 000023
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1997
Contaminated Areas
Groundwater: High Risk
Contaminants: Toluene 2800.0 ppb Benzene 101000.0 ppb Ethylbenzene 184000.0 ppb Xylene 467000.0 ppb
Site ID: UST 000026
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2001
This site is under ongoing monitoring until Dec 2012
Contaminated Areas
Groundwater: High Risk
Contaminants: Benzene 20000.0 ppb Ethylbenzene 40000.0 ppb Naphthalene 64000.0 ppb Toluene 110000.0 ppb Xylene 210000.0 ppb
Site ID: UST 000027
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2008
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethylbenzene 10.0 ppb Toluene 30.0 ppb Xylene, o- 2000.0 ppb
Site ID: UST 000033
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 2007
This site is under ongoing monitoring until Sep 2008
Contaminated Areas
Soil: Low Risk
Contaminants: Ethyl benzene 0.308 ppb
Site ID: UST 000041
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 1997
This site is under ongoing monitoring until Oct 2008
Contaminated Areas
Groundwater: High Risk
Contaminants: Ethyl benzene 340000.0 ppb
Soil: Low Risk
Contaminants: Ethyl benzene 0.34 ppb
Site ID: UST 000051
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Groundwater: High Risk
Contaminants: Chloroform 1100.0 ppb
Soil: Low Risk
Contaminants: Toluene-2,6-Diamine 0.071 ppb
Site ID: UST 000022
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
$1.93M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Apr 2025
Contaminated Areas
Groundwater: High Risk
Contaminants: Toluene 1080000.0 ppb Ethylbenzene 2580000.0 ppb Methyl tertbutyl ether (MTBE) 4300000.0 ppb Benzene 5900000.0 ppb Xylene (mixed) 13300000.0 ppb Copper and compounds 26000000.0 ppb Lead 320000000.0 ppb
Site ID: UST 000052
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Groundwater: High Risk
Contaminants: Benzene 1400000.0 ppb p-Chloronitrobenzene 30798000.0 ppb Xylene (mixed) 72000000.0 ppb Toluene 100000000.0 ppb Ethylbenzene 350000000.0 ppb
Site ID: UST 000053
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2011
This site is under ongoing monitoring until Dec 2014
Contaminated Areas
Groundwater: High Risk
Contaminants: Lead 17000.0 ppb Xylene (mixed) 41000.0 ppb Chromium VI and compounds 72000.0 ppb
Site ID: UST 000061
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1999
Contaminated Areas
Groundwater: High Risk
Contaminants: 1,2-Dichloroethane (EDC) 5200000.0 ppb Benzene 14000000.0 ppb Acetone 18000000.0 ppb
Site ID: UST 000062
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Jun 2015
Contaminated Areas
Groundwater: High Risk
Contaminants: Trichlorofluoromethane 8900.0 ppb Naphthalene 1000000.0 ppb 1,3,5-Trimethylbenzene 1200000.0 ppb Lead 2950000.0 ppb 1,2,4-Tribromobenzene 4010000.0 ppb Ethyl benzene 4410000.0 ppb Benzene 9500000.0 ppb Toluene-2,6-Diamine 23600000.0 ppb
Soil: Medium Risk
Contaminants: Fluorene 2800.0 ppb
Site ID: UST 000063
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2008
Contaminated Areas
Groundwater: Low Risk
Contaminants: Toluene-2,6-Diamine 700.0 ppb
Site ID: UST 000100
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 2000
This site is under ongoing monitoring until Dec 2008
Contaminated Areas
Groundwater: High Risk
Contaminants: Copper and compounds 90000.0 ppb Lead 200000.0 ppb Zinc 1600000.0 ppb
Site ID: UST 000101
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: UST 001064
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SITE 00053
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.09 ppb Butyl benzyl phthalate 0.59 ppb
Site ID: UST 000018
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SITE 00014
CAMP PENDLETON MCB
Landfill
Cost
Unknown
Final Cleanup Action
Jul 1996
This site is under ongoing monitoring until Oct 2007
Contaminated Areas
Soil: Low Risk
Contaminants: Arsenic (cancer) 1.0 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE 00007
CAMP PENDLETON MCB
Landfill
Cost
$10.6M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2003
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: High Risk
Contaminants: DDD 1.9 ppb DDE 2.2 ppb Mercury (Methyl) 7.3 ppb Boron 42.0 ppb Cadmium and compounds 44.0 ppb Arsenic 51.0 ppb Chromium 890.0 ppb Lead 8800.0 ppb
Groundwater: Medium Risk
Contaminants: Carbon tetrachloride 500.0 ppb Dichloroethane, 1,2- (EDC) 2000.0 ppb Tetrachloroethylene (PCE) 2000.0 ppb Dichloroethane, 1,1- 2000.0 ppb
Site ID: SITE 00040
CAMP PENDLETON MCB
Waste Lines
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00047
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Sediment (Human): Low Risk
Contaminants: Arsenic (cancer) 1.0 ppb
Site ID: SITE 00073
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.07 ppb
Site ID: SITE 00039
CAMP PENDLETON MCB
Waste Lines
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00078
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene 0.02 ppb Carbon disulfide 0.02 ppb Acetone 0.23 ppb Xylene (mixed) 2.6 ppb Toluene 3.8 ppb
Site ID: SITE 00097
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.01 ppb Methylene Chloride 0.01 ppb Benzene, methyl- 0.14 ppb
Site ID: SITE 00129
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.19 ppb
Site ID: SITE 01002
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Manganese and compounds 10.0 ppb
Site ID: SITE 00079
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.02 ppb Toluene 0.12 ppb
Site ID: SITE 00098
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Benzoic Acid 0.12 ppb
Site ID: SITE 00139
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.06 ppb
Site ID: SITE 00012
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1995
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00020
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Feb 1997
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Sediment (Marine): Risk Not Evaluated
Surface Water (Fresh): Risk Not Evaluated
Surface Water (Human): Risk Not Evaluated
Site ID: SITE 00028
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00036
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00045
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Site ID: SITE 00061
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.02 ppb Carbon tetrachloride 0.03 ppb Toluene 0.5 ppb
Site ID: SITE 00069
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.18 ppb
Site ID: SITE 00085
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (mixed) 0.43 ppb
Site ID: SITE 00093
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.018 ppb Benzene, methyl- 0.12 ppb
Site ID: SITE 00101
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.38 ppb
Site ID: SITE 00106
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Acetone 0.019 ppb Benzene, methyl- 0.061 ppb o-Xylene 0.98 ppb
Site ID: SITE 00114
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Lead 13600.0 ppb Zinc 329000.0 ppb
Sediment (Fresh): Medium Risk
Contaminants: Lead 3.4 ppb Vanadium 37.6 ppb Copper and compounds 43.0 ppb Zinc 46.1 ppb Nickel and compounds 49.0 ppb Chromium VI and compounds 60.7 ppb Aluminum 7580.0 ppb
Site ID: SITE 00122
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Fluoranthene 0.57 ppb
Site ID: SITE 00130
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 5.7 ppb
Site ID: SITE 00138
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 0.59 ppb
Site ID: SITE 00147
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb
Site ID: SITE 00155
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.26 ppb Benzo[a]pyrene 3.0 ppb
Site ID: SITE 01005
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 2000
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb
Site ID: UST 000001
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: UST 000031
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Jan 2009
Contaminated Areas
Groundwater: High Risk
Contaminants: Toluene 500.0 ppb Benzene 1200.0 ppb Ethylbenzene 9900.0 ppb Xylene 45500.0 ppb Methyl tertbutyl ether (MTBE) 390000.0 ppb
Site ID: UST 000064
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 1999
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 1800.0 ppb
Site ID: SITE 00010
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00046
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Groundwater: Low Risk
Contaminants: Arsenic (cancer) 1000.0 ppb
Site ID: SITE 00081
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.14 ppb
Site ID: SITE 00116
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Ethyl benzene 0.014 ppb o-Xylene 0.069 ppb Benzene, methyl- 3.6 ppb
Site ID: SITE 00151
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.03 ppb
Site ID: UST 000012
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2009
This site is under ongoing monitoring until Jan 2014
Contaminated Areas
Groundwater: High Risk
Contaminants: Ethylbenzene 1000.0 ppb Toluene 1500.0 ppb Benzene 4700.0 ppb Phenanthrene 6500.0 ppb Trichloroethylene (TCE) 11120.0 ppb Xylene (mixed) 16400.0 ppb Naphthalene 35000.0 ppb
Site ID: SITE 00105
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Butyl benzyl phthalate 0.44 ppb
Site ID: SITE 00121
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Methylnaphthalene,2 14.0 ppb Ethylbenzene 53.0 ppb Toluene 68.0 ppb Xylene (mixed) 460.0 ppb
Site ID: SITE 00152
CAMP PENDLETON MCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.05 ppb
Site ID: SITE 01117
CAMP PENDLETON MCB
Contaminated Ground Water
Cost
$272K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2012
This site is under ongoing monitoring until Oct 2015
Contaminated Areas
Groundwater: High Risk
Contaminants: Vinyl Chloride 3100.0 ppb Trichloroethylene (TCE) 9600.0 ppb
Site ID: UST 000013
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
$6.35M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2012
This site is under ongoing monitoring until Apr 2039
Contaminated Areas
Groundwater: High Risk
Contaminants: Acenaphthylene- 4000.0 ppb Acetone 7540.0 ppb Toluene 15900.0 ppb Dichloroethane, 1,2- (EDC) 20000.0 ppb Benzene 41000.0 ppb Trichloroethylene (TCE) 42590.0 ppb Xylene 63190.0 ppb
Site ID: UST 000016
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
$64K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2011
This site is under ongoing monitoring until Nov 2015
Contaminated Areas
Groundwater: High Risk
Contaminants: Ethyl benzene 950.0 ppb 1,2,4-Tribromobenzene 1100.0 ppb Toluene-2,6-Diamine 1900.0 ppb o-Xylene 3200.0 ppb
Site ID: UST 000024
CAMP PENDLETON MCB
Underground Storage Tanks
Cost
$767K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2005
This site is under ongoing monitoring until Dec 2021
Contaminated Areas
Groundwater: High Risk
Contaminants: Ether,tert-butyl methyl 37000.0 ppb 1,2-Dichloroethane (EDC) 500000.0 ppb Chromium VI and compounds 1400000.0 ppb Zinc 2600000.0 ppb Benzene 7200000.0 ppb Toluene 11000000.0 ppb Xylene (mixed) 11000000.0 ppb
Site ID: SITE 00096
CAMP PENDLETON MCB
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.24 ppb Naphthalene 0.81 ppb
Site ID: SITE 00006
CAMP PENDLETON MCB
Surface Disposal Area
Cost
$4.91M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2014
This site is under ongoing monitoring until Dec 2025
Contaminated Areas
Groundwater: High Risk
Contaminants: Vinyl chloride 2000.0 ppb Trichloroethane, 1,1,1- 5000.0 ppb Dichloroethane, 1,2- (EDC) 10000.0 ppb Dichloroethane, 1,1- 10000.0 ppb Trichloroethylene (TCE) 19000.0 ppb Antimony and compounds 23200.0 ppb Dichloroethylene, 1,1- 50000.0 ppb Dichloroethylene, 1,2- (mixture) 99000.0 ppb Nickel and compounds 534000.0 ppb
Soil: Low Risk
Contaminants: DDD 10.0 ppb
Site ID: SITE 00062
CAMP PENDLETON MCB
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Methylene chloride 0.5 ppb
Site ID: SITE 01000
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 2010
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 1.0 ppb Arsenic (cancer) 6.4 ppb Antimony and compounds 35.3 ppb Chromium VI and compounds 40.5 ppb Lead 1100.0 ppb Manganese and compounds 1300.0 ppb
Site ID: SITE 00132
CAMP PENDLETON MCB
Storage Area
Cost
Unknown
Final Cleanup Action
May 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Ethylbenzene 0.03 ppb Benzene 0.05 ppb Toluene 0.24 ppb Xylene (mixed) 0.56 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1.2 ppb
Site ID: SITE 00066
CAMP PENDLETON MCB
Incinerator
Cost
Unknown
Final Cleanup Action
Apr 2009
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.12 ppb
Site ID: SITE 02001
CAMP PENDLETON MCB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00003
CAMP PENDLETON MCB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Apr 2005
Contaminated Areas
Soil: Low Risk
Contaminants: Dimethylbenzene 0.024 ppb
Site ID: SITE 00004
CAMP PENDLETON MCB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Dec 1995
Contaminated Areas
Groundwater: Low Risk
Contaminants: Dichloroethane, 1,1- 5000.0 ppb
Soil: Low Risk
Contaminants: Arsenic (cancer) 1.0 ppb
Site ID: SITE 00005
CAMP PENDLETON MCB
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Dec 1995
Contaminated Areas
Groundwater: Risk Not Evaluated
Soil: Risk Not Evaluated
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »