Back to Map
NAVY INSTALLATION ID: CA917302353300

CAMP PENDLETON MCB

camp pendleton, California

Cost So Far

$289M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$53.2M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2019

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

211 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, warning signs, barriers. see more » a barrier, including but not limited to a paved surface or landfill cap, must be maintained in order to prevent exposure to contaminants, including vapor intrusion into an enclosed structure. a fence around controlled area, with or without gate. gate(s) and/or door(s) must be locked to prevent access and exposure to contaminants. a warning sign is in place surrounding the area prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

9 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 01120

CAMP PENDLETON MCB

Maintenance Yard

Cost

$6.69M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2018

Contaminated Areas

Soil: High Risk

Contaminants: Heptachlor Epoxide 88000.0 ppb Dieldrin 220000.0 ppb Benzo(a)Pyrene 370000.0 ppb 4,4-DDE 5400000.0 ppb 4,4-DDT 7400000.0 ppb Toxaphene 28000000.0 ppb 2-Methyl-4-Chlorophenoxyacetic Acid 42000000.0 ppb

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 01118

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

$3.17M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2017

This site is under ongoing monitoring until Aug 2021

Contaminated Areas

Groundwater: High Risk

Contaminants: Carbon Dichloride 7000.0 ppb Alpha, Beta-Dichloroethane 12000.0 ppb Trichloroethylene (TCE) 12000.0 ppb

See more details...

Site ID: SITE 01121

CAMP PENDLETON MCB

Chemical Disposal

Cost

$1.95M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2017

This site is under ongoing monitoring until Dec 2022

Contaminated Areas

Groundwater: High Risk

Contaminants: 4,4-DDT 1600.0 ppb 4,4-DDD 7200.0 ppb Tetrachloroethylene 500000.0 ppb cis-1,2-Dichloroethylene 860000.0 ppb Naphthalene 6000000.0 ppb 1,1,2-Trichloroethane 7300000.0 ppb Arsenic 19900000.0 ppb Trichloroethylene (TCE) 25000000.0 ppb 1,1,1,2-Tetrachloroethane 110000000.0 ppb

See more details...

Site ID: SITE 01115

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

$4.58M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2016

This site is under ongoing monitoring until Oct 2023

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 45000.0 ppb

See more details...

Site ID: SITE 01119

CAMP PENDLETON MCB

Chemical Disposal

Cost

$8.79M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

This site is under ongoing monitoring until Mar 2025

Contaminated Areas

Groundwater: High Risk

Contaminants: 1,1-Dichloroethylene 1100.0 ppb Trichloroethylene (TCE) 11000.0 ppb 1,2,3-Trichloropropane 70000.0 ppb

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00150

CAMP PENDLETON MCB

Maintenance Yard

Cost

$1.67M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

This site is under ongoing monitoring until Oct 2020

Contaminated Areas

Soil: Low Risk

Contaminants: Butyl benzyl phthalate 0.19 ppb Toluene 6.4 ppb Xylene (mixed) 13.0 ppb

See more details...

Site ID: SITE 00033

CAMP PENDLETON MCB

Spill Site Area

Cost

$2.58M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2013

This site is under ongoing monitoring until Oct 2040

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 300.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 640.0 ppb Diethyl phthalate 1600.0 ppb Selenium 5900.0 ppb Nickel and compounds 52000.0 ppb Aluminum 86200.0 ppb Barium and compounds 172000.0 ppb Zinc 187000.0 ppb Manganese and compounds 2200000.0 ppb PCE 3600000.0 ppb Iron 8700000.0 ppb

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 01116

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

$4.23M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2012

This site is under ongoing monitoring until Nov 2023

Contaminated Areas

Groundwater: High Risk

Contaminants: Vinyl Chloride 1600.0 ppb Trichloroethylene (TCE) 58000.0 ppb

See more details...

Site ID: SITE 00021

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

$3.25M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2011

This site is under ongoing monitoring until Oct 2023

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethyl benzene 23000.0 ppb Vinyl Chloride 27000.0 ppb 1,2-Dichloroethylene (trans) 31000.0 ppb 1,2-Dichloroethylene (cis) 71000.0 ppb Tetrachloroethylene 552000.0 ppb

Sediment (Fresh): High Risk

Contaminants: HCH (beta) 150.0 ppb

Sediment (Human): Medium Risk

Contaminants: Trichloroethylene (TCE) 0.4 ppb Vanadium 70.0 ppb Copper and compounds 280.0 ppb

See more details...

202 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00008

CAMP PENDLETON MCB

Landfill

Cost

Unknown

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Oct 2007

Contaminated Areas

Groundwater: Low Risk

Contaminants: Arsenic (cancer) 1000.0 ppb

See more details...

Site ID: SITE 00009

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Sep 1996

This site is under ongoing monitoring until Aug 2005

Contaminated Areas

Surface Water (Human): Medium Risk

Contaminants: Arsenic (cancer endpoint) 1400.0 ppb Nickel and compounds 8100.0 ppb Zinc 9200.0 ppb Copper and compounds 25000.0 ppb Aluminum 355000.0 ppb

Groundwater: Low Risk

Contaminants: Dichloroethane, 1,2- (EDC) 2000.0 ppb Dichloroethylene, 1,2- (mixture) 5000.0 ppb Tetrachloroethylene (PCE) 10000.0 ppb Trichloroethylene (TCE) 15000.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: Arsenic (cancer endpoint) 1400.0 ppb Nickel and compounds 8100.0 ppb Zinc 9200.0 ppb

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00011

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00013

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jan 1995

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00015

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 00016

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1998

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00017

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Oct 1998

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00018

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Oct 1998

Contaminated Areas

Sediment (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00019

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Feb 1997

Site ID: SITE 00022

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Feb 1997

Site ID: SITE 00023

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 00024

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Mar 1995

Contaminated Areas

Groundwater: Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00025

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Sediment (Marine): Low Risk

Contaminants: Dichlorobenzene, 1,4- 0.03 ppb Trichlorobenzene, 1,2,4- 0.03 ppb

Sediment (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00026

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Oct 1995

Site ID: SITE 00027

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Oct 1998

Site ID: SITE 00029

CAMP PENDLETON MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Oct 1998

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00030

CAMP PENDLETON MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Jun 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Arsenic (cancer) 3800.0 ppb Chromium VI and compounds 6600.0 ppb

Soil: High Risk

Contaminants: Beryllium and compounds 1.7 ppb Chromium VI and compounds 52.1 ppb Arsenic (cancer) 93.5 ppb Antimony and compounds 368.0 ppb Manganese and compounds 5140.0 ppb Lead 109000.0 ppb

See more details...

Site ID: SITE 00031

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00032

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Groundwater: Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00034

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00035

CAMP PENDLETON MCB

Waste Treatment Plant

Cost

Unknown

Final Cleanup Action

Oct 1998

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00037

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00038

CAMP PENDLETON MCB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00041

CAMP PENDLETON MCB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00042

CAMP PENDLETON MCB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00043

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jun 1996

Contaminated Areas

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 00044

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1996

Contaminated Areas

Sediment (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00048

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1996

Contaminated Areas

Surface Water (Marine): Low Risk

Contaminants: Lead 1000.0 ppb Arsenic (cancer) 1000.0 ppb

See more details...

Site ID: SITE 00049

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.01 ppb Toluene 0.6 ppb

See more details...

Site ID: SITE 00050

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jun 1993

Site ID: SITE 00051

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.93 ppb

See more details...

Site ID: SITE 00052

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.53 ppb

See more details...

Site ID: SITE 00054

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Low Risk

Contaminants: Molybdenum 10.0 ppb Zinc 120.0 ppb Vanadium 150.0 ppb Barium and compounds 410.0 ppb Nickel and compounds 490.0 ppb Aluminum 28100.0 ppb Iron 40400.0 ppb

See more details...

Site ID: SITE 00055

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb Acetone 0.02 ppb

See more details...

Site ID: SITE 00056

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Methylene Chloride 0.44 ppb

See more details...

Site ID: SITE 00057

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.01 ppb Toluene 0.29 ppb

See more details...

Site ID: SITE 00058

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.02 ppb

See more details...

Site ID: SITE 00059

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.19 ppb

See more details...

Site ID: SITE 00060

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene, methyl- 0.55 ppb

See more details...

Site ID: SITE 00063

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Ethylbenzene 0.01 ppb Xylene (mixed) 0.06 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.15 ppb

See more details...

Site ID: SITE 00064

CAMP PENDLETON MCB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Apr 2009

Site ID: SITE 00065

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: DDT 0.037 ppb Endrin 0.0398 ppb Dieldrin 0.0403 ppb DDD 0.197 ppb DDE 0.211 ppb

See more details...

Site ID: SITE 00067

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.03 ppb Ethylbenzene 0.41 ppb Toluene 3.9 ppb

See more details...

Site ID: SITE 00068

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.01 ppb Toluene 0.02 ppb

See more details...

Site ID: SITE 00070

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.02 ppb

See more details...

Site ID: SITE 00071

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: o-Xylene 0.34 ppb

See more details...

Site ID: SITE 00072

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.02 ppb Acenaphthene 0.78 ppb Dibenz[ah]anthracene 0.85 ppb Benzo[k]fluoranthene 3.2 ppb Phenanthrene 4.6 ppb Pyrene 5.2 ppb

See more details...

Site ID: SITE 00074

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Sediment (Fresh): Medium Risk

Contaminants: Lead 2.9 ppb Nickel and compounds 32.0 ppb Zinc 36.5 ppb Chromium VI and compounds 48.4 ppb Vanadium 49.2 ppb Copper and compounds 52.1 ppb Aluminum 8710.0 ppb

Groundwater: Low Risk

Contaminants: Zinc 60.0 ppb Molybdenum 70.0 ppb Antimony and compounds 170.0 ppb

See more details...

Site ID: SITE 00075

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Methyl chloride 0.72 ppb Phenanthrene 6.3 ppb Xylene (mixed) 19.0 ppb Naphthalene 34.0 ppb Methylnaphthalene,2 73.0 ppb

See more details...

Site ID: SITE 00076

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Ethylbenzene 1.4 ppb Xylene (mixed) 8.7 ppb

See more details...

Site ID: SITE 00077

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Methylene chloride 0.01 ppb Acetone 0.05 ppb Toluene 0.11 ppb

See more details...

Site ID: SITE 00080

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.18 ppb Phenanthrene 0.44 ppb Fluorene 0.69 ppb

See more details...

Site ID: SITE 00082

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Xylene (mixed) 3.8 ppb

See more details...

Site ID: SITE 00083

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.06 ppb

See more details...

Site ID: SITE 00084

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.07 ppb Toluene 1.1 ppb

See more details...

Site ID: SITE 00086

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.06 ppb Butyl benzyl phthalate 0.24 ppb

See more details...

Site ID: SITE 00087

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb

See more details...

Site ID: SITE 00088

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.26 ppb

See more details...

Site ID: SITE 00089

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Xylene (mixed) 0.19 ppb

See more details...

Site ID: SITE 00090

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.35 ppb

See more details...

Site ID: SITE 00091

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: o-Xylene 6.6 ppb

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 00092

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Sediment (Fresh): Medium Risk

Contaminants: Toluene 0.11 ppb Mercury 0.69 ppb Nickel and compounds 22.7 ppb Zinc 28.8 ppb Chromium VI and compounds 36.7 ppb Vanadium 36.7 ppb Aluminum 7240.0 ppb

See more details...

Site ID: SITE 00094

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 1.1 ppb

See more details...

Site ID: SITE 00095

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.17 ppb

See more details...

Site ID: SITE 00099

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Naphthalene 1.6 ppb

See more details...

Site ID: SITE 00100

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Xylene (mixed) 9.8 ppb

See more details...

Site ID: SITE 00102

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 2.9 ppb Bis(2-ethylhexyl)phthalate (DEHP) 6.0 ppb Naphthalene 6.8 ppb

See more details...

Site ID: SITE 00103

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1997

Contaminated Areas

Sediment (Fresh): Medium Risk

Contaminants: Acetone 0.02 ppb Mercury and compounds (inorganic) 0.86 ppb Lead 5.0 ppb Vanadium 32.7 ppb Chromium VI and compounds 43.8 ppb Zinc 57.5 ppb Barium and compounds 90.5 ppb Aluminum 8150.0 ppb

See more details...

Site ID: SITE 00104

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Butyl benzyl phthalate 0.44 ppb

See more details...

Site ID: SITE 00107

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: o-Xylene 0.054 ppb Fluorene 0.065 ppb Benzene, methyl- 0.07 ppb Acetone 0.086 ppb Naphthalene 0.16 ppb

See more details...

Site ID: SITE 00108

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 1993

Contaminated Areas

Sediment (Fresh): Low Risk

Contaminants: Lead 4.6 ppb Vanadium 22.3 ppb Zinc 26.5 ppb Barium and compounds 84.8 ppb Aluminum 5110.0 ppb

See more details...

Site ID: SITE 00109

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.032 ppb Ethyl benzene 2.1 ppb o-Xylene 12.0 ppb

See more details...

Site ID: SITE 00110

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Phenanthrene 0.25 ppb Benz(a)anthracene 0.29 ppb Benzo[a]pyrene 0.31 ppb Chrysene 0.41 ppb Fluoranthene 0.64 ppb

See more details...

Site ID: SITE 00111

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toxaphene 0.09 ppb

See more details...

Site ID: SITE 00112

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.29 ppb

See more details...

Site ID: SITE 00113

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.14 ppb

See more details...

Site ID: SITE 00115

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.4 ppb

See more details...

Site ID: SITE 00117

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene, methyl- 0.024 ppb

See more details...

Site ID: SITE 00118

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.066 ppb Benzene, methyl- 0.68 ppb Ethyl benzene 0.9 ppb o-Xylene 0.93 ppb

See more details...

Site ID: SITE 00119

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene, methyl- 0.024 ppb

See more details...

Site ID: SITE 00120

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 1.2 ppb

See more details...

Site ID: SITE 00123

CAMP PENDLETON MCB

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Chromium (III) 11.5 ppb Vanadium 39.0 ppb Barium and compounds 54.2 ppb Lead 54.5 ppb Zinc 397.0 ppb Aluminum 9310.0 ppb

See more details...

Site ID: SITE 00124

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 3.3 ppb

See more details...

Site ID: SITE 00125

CAMP PENDLETON MCB

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.14 ppb

See more details...

Site ID: SITE 00126

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.19 ppb

See more details...

Site ID: SITE 00127

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.4 ppb

See more details...

Site ID: SITE 00128

CAMP PENDLETON MCB

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.02 ppb

See more details...

Site ID: SITE 00131

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.18 ppb Naphthalene 0.92 ppb

See more details...

Site ID: SITE 00133

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.23 ppb

See more details...

Site ID: SITE 00134

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.02 ppb Toluene 0.05 ppb

See more details...

Site ID: SITE 00135

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2004

Contaminated Areas

Soil: Low Risk

Contaminants: Ethylbenzene 0.14 ppb Toluene 0.18 ppb Xylene (mixed) 0.74 ppb

See more details...

Site ID: SITE 00136

CAMP PENDLETON MCB

Washrack

Cost

Unknown

Final Cleanup Action

Oct 2004

Contaminated Areas

Surface Water (Human): Low Risk

Contaminants: Carbon Tetrachloride 11.0 ppb Benzene, methyl- 130.0 ppb

See more details...

Site ID: SITE 00137

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Sediment (Fresh): Low Risk

Contaminants: Mercury 0.17 ppb Lead 3.5 ppb Zinc 15.2 ppb Aluminum 3940.0 ppb

See more details...

Site ID: SITE 00140

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Sediment (Fresh): Medium Risk

Contaminants: Zinc 24.2 ppb Copper and compounds 31.1 ppb Chromium VI and compounds 31.6 ppb Aluminum 5390.0 ppb

See more details...

Site ID: SITE 00141

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Naphthalene 4.1 ppb Toluene 27.0 ppb Ethylbenzene 51.0 ppb Xylene (mixed) 450.0 ppb

Surface Water (Fresh): Risk Not Evaluated

See more details...

Site ID: SITE 00142

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.03 ppb

See more details...

Site ID: SITE 00143

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Xylene (mixed) 0.09 ppb

See more details...

Site ID: SITE 00144

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb

See more details...

Site ID: SITE 00145

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

May 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.02 ppb

See more details...

Site ID: SITE 00146

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb

See more details...

Site ID: SITE 00148

CAMP PENDLETON MCB

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.03 ppb Bis(2-ethylhexyl)phthalate (DEHP) 9.4 ppb Fluorene 13.0 ppb Acenaphthene 19.0 ppb Naphthalene 49.0 ppb

See more details...

Site ID: SITE 00149

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.47 ppb Xylene (mixed) 1.9 ppb

See more details...

Site ID: SITE 00153

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb

See more details...

Site ID: SITE 00154

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Methylene chloride 0.01 ppb Toluene 0.13 ppb

See more details...

Site ID: SITE 00156

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Carbon Disulfide 0.003 ppb Acetone 0.035 ppb Toluene 0.25 ppb

Groundwater: Risk Not Evaluated

Surface Water (Marine): Risk Not Evaluated

See more details...

Site ID: SITE 00157

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.15 ppb

See more details...

Site ID: SITE 01001

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony and compounds 1.0 ppb

See more details...

Site ID: SITE 01003

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb

See more details...

Site ID: SITE 01004

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb

See more details...

Site ID: SITE 01006

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony and compounds 1.0 ppb

See more details...

Site ID: SITE 01007

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

May 2011

Contaminated Areas

Soil: High Risk

Contaminants: DDE 0.16 ppb Arsenic (cancer) 64.3 ppb Antimony and compounds 273.0 ppb Manganese and compounds 6780.0 ppb Lead 9560.0 ppb

See more details...

Site ID: SITE 01008

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony and compounds 1.0 ppb

See more details...

Site ID: SITE 01111

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: High Risk

Contaminants: DDD,4,4- 34.0 ppb Arsenic (cancer) 48.0 ppb DDE,4,4- 73.0 ppb DDT 170.0 ppb

See more details...

Site ID: SITE 01112

CAMP PENDLETON MCB

Burn Area

Cost

Unknown

Final Cleanup Action

Nov 2009

Contaminated Areas

Soil: High Risk

Contaminants: (2-Chloroethoxy)ethene 9.2 ppb Antimony Pentoxide 35.0 ppb Lead 1200.0 ppb

See more details...

Site ID: SITE 01114

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jul 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 22000.0 ppb

See more details...

Site ID: SITE 02000

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Dec 2000

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.9 ppb Arsenic (cancer) 16.0 ppb Chromium VI and compounds 19.0 ppb Lead 2020.0 ppb Copper and compounds 8790.0 ppb Manganese and compounds 345000.0 ppb

See more details...

Site ID: SITE 02002

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 02003

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.98 ppb Arsenic (cancer) 8.0 ppb Chromium VI and compounds 8.3 ppb Lead 421.0 ppb

See more details...

Site ID: SITE 02004

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 1.0 ppb

See more details...

Site ID: SITE 02005

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 1.0 ppb

See more details...

Site ID: SITE 62001

CAMP PENDLETON MCB

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Sep 2014

Contaminated Areas

Soil: High Risk

Contaminants: Aroclor 1254 750.0 ppb

See more details...

Site ID: UST 000011

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Jan 2012

Contaminated Areas

Groundwater: High Risk

Contaminants: Cadmium and compounds 30000.0 ppb Vanadium 30000.0 ppb Ether,tert-butyl methyl 63000.0 ppb Benzene 75000.0 ppb Toluene 90000.0 ppb Ethylbenzene 1950000.0 ppb Xylene (mixed) 3030000.0 ppb

See more details...

Site ID: UST 000014

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 2011

This site is under ongoing monitoring until Oct 2016

Contaminated Areas

Groundwater: High Risk

Contaminants: o-Xylene 1100.0 ppb Trichloroethylene (TCE) 3500.0 ppb Fluorene 14000.0 ppb Naphthalene 27000.0 ppb Vanadium 30000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 1300000.0 ppb

See more details...

Site ID: UST 000043

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

$984K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2002

This site is under ongoing monitoring until Dec 2020

Contaminated Areas

Groundwater: High Risk

Contaminants: Nickel and compounds 10000.0 ppb Cadmium and compounds 30000.0 ppb Vanadium 80000.0 ppb Copper and compounds 170000.0 ppb Barium and compounds 620000.0 ppb Ethyl benzene 796000.0 ppb Benzene 1090000.0 ppb Lead 1400000.0 ppb Methyl tertbutyl ether (MTBE) 2830000.0 ppb Xylene 4450000.0 ppb Toluene 4790000.0 ppb Zinc 8900000.0 ppb

See more details...

Site ID: UST 000015

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Jun 2015

Contaminated Areas

Groundwater: High Risk

Contaminants: Bromodichloromethane 1200.0 ppb Trichloroethylene (TCE) 3800.0 ppb 1,3,5-Trimethylbenzene 4800.0 ppb Ethyl benzene 6300.0 ppb Benzene 14000.0 ppb o-Xylene 17000.0 ppb Naphthalene 110000.0 ppb p-Chloronitrobenzene 1600000.0 ppb

See more details...

Site ID: UST 000017

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 800.0 ppb

See more details...

Site ID: UST 000020

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jan 1999

Site ID: UST 000021

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 2004

This site is under ongoing monitoring until Dec 2013

Contaminated Areas

Groundwater: High Risk

Contaminants: Acetone 3800000.0 ppb Ethylbenzene 3950000.0 ppb Benzene 4633000.0 ppb Toluene 19056000.0 ppb Xylene (mixed) 21838000.0 ppb

See more details...

Site ID: UST 000023

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 2800.0 ppb Benzene 101000.0 ppb Ethylbenzene 184000.0 ppb Xylene 467000.0 ppb

See more details...

Site ID: UST 000026

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2001

This site is under ongoing monitoring until Dec 2012

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 20000.0 ppb Ethylbenzene 40000.0 ppb Naphthalene 64000.0 ppb Toluene 110000.0 ppb Xylene 210000.0 ppb

See more details...

Site ID: UST 000027

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 2008

Contaminated Areas

Groundwater: Low Risk

Contaminants: Ethylbenzene 10.0 ppb Toluene 30.0 ppb Xylene, o- 2000.0 ppb

See more details...

Site ID: UST 000033

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 2007

This site is under ongoing monitoring until Sep 2008

Contaminated Areas

Soil: Low Risk

Contaminants: Ethyl benzene 0.308 ppb

See more details...

Site ID: UST 000041

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

This site is under ongoing monitoring until Oct 2008

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethyl benzene 340000.0 ppb

Soil: Low Risk

Contaminants: Ethyl benzene 0.34 ppb

See more details...

Site ID: UST 000051

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Chloroform 1100.0 ppb

Soil: Low Risk

Contaminants: Toluene-2,6-Diamine 0.071 ppb

See more details...

Site ID: UST 000022

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

$1.93M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Apr 2025

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 1080000.0 ppb Ethylbenzene 2580000.0 ppb Methyl tertbutyl ether (MTBE) 4300000.0 ppb Benzene 5900000.0 ppb Xylene (mixed) 13300000.0 ppb Copper and compounds 26000000.0 ppb Lead 320000000.0 ppb

See more details...

Site ID: UST 000052

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 1400000.0 ppb p-Chloronitrobenzene 30798000.0 ppb Xylene (mixed) 72000000.0 ppb Toluene 100000000.0 ppb Ethylbenzene 350000000.0 ppb

See more details...

Site ID: UST 000053

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2011

This site is under ongoing monitoring until Dec 2014

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 17000.0 ppb Xylene (mixed) 41000.0 ppb Chromium VI and compounds 72000.0 ppb

See more details...

Site ID: UST 000061

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Nov 1999

Contaminated Areas

Groundwater: High Risk

Contaminants: 1,2-Dichloroethane (EDC) 5200000.0 ppb Benzene 14000000.0 ppb Acetone 18000000.0 ppb

See more details...

Site ID: UST 000062

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2007

This site is under ongoing monitoring until Jun 2015

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichlorofluoromethane 8900.0 ppb Naphthalene 1000000.0 ppb 1,3,5-Trimethylbenzene 1200000.0 ppb Lead 2950000.0 ppb 1,2,4-Tribromobenzene 4010000.0 ppb Ethyl benzene 4410000.0 ppb Benzene 9500000.0 ppb Toluene-2,6-Diamine 23600000.0 ppb

Soil: Medium Risk

Contaminants: Fluorene 2800.0 ppb

See more details...

Site ID: UST 000063

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 2008

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene-2,6-Diamine 700.0 ppb

See more details...

Site ID: UST 000100

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 2000

This site is under ongoing monitoring until Dec 2008

Contaminated Areas

Groundwater: High Risk

Contaminants: Copper and compounds 90000.0 ppb Lead 200000.0 ppb Zinc 1600000.0 ppb

See more details...

Site ID: UST 000101

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: UST 001064

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: SITE 00053

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.09 ppb Butyl benzyl phthalate 0.59 ppb

See more details...

Site ID: UST 000018

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: SITE 00014

CAMP PENDLETON MCB

Landfill

Cost

Unknown

Final Cleanup Action

Jul 1996

This site is under ongoing monitoring until Oct 2007

Contaminated Areas

Soil: Low Risk

Contaminants: Arsenic (cancer) 1.0 ppb

Groundwater: Risk Not Evaluated

See more details...

Site ID: SITE 00007

CAMP PENDLETON MCB

Landfill

Cost

$10.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2003

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: High Risk

Contaminants: DDD 1.9 ppb DDE 2.2 ppb Mercury (Methyl) 7.3 ppb Boron 42.0 ppb Cadmium and compounds 44.0 ppb Arsenic 51.0 ppb Chromium 890.0 ppb Lead 8800.0 ppb

Groundwater: Medium Risk

Contaminants: Carbon tetrachloride 500.0 ppb Dichloroethane, 1,2- (EDC) 2000.0 ppb Tetrachloroethylene (PCE) 2000.0 ppb Dichloroethane, 1,1- 2000.0 ppb

See more details...

Site ID: SITE 00040

CAMP PENDLETON MCB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00047

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1996

Contaminated Areas

Sediment (Human): Low Risk

Contaminants: Arsenic (cancer) 1.0 ppb

See more details...

Site ID: SITE 00073

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.07 ppb

See more details...

Site ID: SITE 00039

CAMP PENDLETON MCB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00078

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Benzene 0.02 ppb Carbon disulfide 0.02 ppb Acetone 0.23 ppb Xylene (mixed) 2.6 ppb Toluene 3.8 ppb

See more details...

Site ID: SITE 00097

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.01 ppb Methylene Chloride 0.01 ppb Benzene, methyl- 0.14 ppb

See more details...

Site ID: SITE 00129

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.19 ppb

See more details...

Site ID: SITE 01002

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Low Risk

Contaminants: Manganese and compounds 10.0 ppb

See more details...

Site ID: SITE 00079

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.02 ppb Toluene 0.12 ppb

See more details...

Site ID: SITE 00098

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Benzoic Acid 0.12 ppb

See more details...

Site ID: SITE 00139

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.06 ppb

See more details...

Site ID: SITE 00012

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00020

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Feb 1997

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Sediment (Marine): Risk Not Evaluated

Surface Water (Fresh): Risk Not Evaluated

Surface Water (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00028

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jun 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00036

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00045

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Sep 1996

Contaminated Areas

Sediment (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00061

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Feb 2012

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.02 ppb Carbon tetrachloride 0.03 ppb Toluene 0.5 ppb

See more details...

Site ID: SITE 00069

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.18 ppb

See more details...

Site ID: SITE 00085

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Xylene (mixed) 0.43 ppb

See more details...

Site ID: SITE 00093

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.018 ppb Benzene, methyl- 0.12 ppb

See more details...

Site ID: SITE 00101

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.38 ppb

See more details...

Site ID: SITE 00106

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Acetone 0.019 ppb Benzene, methyl- 0.061 ppb o-Xylene 0.98 ppb

See more details...

Site ID: SITE 00114

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Jul 2010

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Lead 13600.0 ppb Zinc 329000.0 ppb

Sediment (Fresh): Medium Risk

Contaminants: Lead 3.4 ppb Vanadium 37.6 ppb Copper and compounds 43.0 ppb Zinc 46.1 ppb Nickel and compounds 49.0 ppb Chromium VI and compounds 60.7 ppb Aluminum 7580.0 ppb

See more details...

Site ID: SITE 00122

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Fluoranthene 0.57 ppb

See more details...

Site ID: SITE 00130

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 5.7 ppb

See more details...

Site ID: SITE 00138

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: DDT 0.59 ppb

See more details...

Site ID: SITE 00147

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.01 ppb

See more details...

Site ID: SITE 00155

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.26 ppb Benzo[a]pyrene 3.0 ppb

See more details...

Site ID: SITE 01005

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2000

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.4 ppb Cadmium and compounds 9.2 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 104.0 ppb Antimony and compounds 140.0 ppb Manganese and compounds 1120.0 ppb Lead 1610.0 ppb

See more details...

Site ID: UST 000001

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1996

Site ID: UST 000031

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2001

This site is under ongoing monitoring until Jan 2009

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 500.0 ppb Benzene 1200.0 ppb Ethylbenzene 9900.0 ppb Xylene 45500.0 ppb Methyl tertbutyl ether (MTBE) 390000.0 ppb

See more details...

Site ID: UST 000064

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1999

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzene 1800.0 ppb

See more details...

Site ID: SITE 00010

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00046

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Sep 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Arsenic (cancer) 1000.0 ppb

See more details...

Site ID: SITE 00081

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.14 ppb

See more details...

Site ID: SITE 00116

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Ethyl benzene 0.014 ppb o-Xylene 0.069 ppb Benzene, methyl- 3.6 ppb

See more details...

Site ID: SITE 00151

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.03 ppb

See more details...

Site ID: UST 000012

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2009

This site is under ongoing monitoring until Jan 2014

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethylbenzene 1000.0 ppb Toluene 1500.0 ppb Benzene 4700.0 ppb Phenanthrene 6500.0 ppb Trichloroethylene (TCE) 11120.0 ppb Xylene (mixed) 16400.0 ppb Naphthalene 35000.0 ppb

See more details...

Site ID: SITE 00105

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Soil: Low Risk

Contaminants: Butyl benzyl phthalate 0.44 ppb

See more details...

Site ID: SITE 00121

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Methylnaphthalene,2 14.0 ppb Ethylbenzene 53.0 ppb Toluene 68.0 ppb Xylene (mixed) 460.0 ppb

See more details...

Site ID: SITE 00152

CAMP PENDLETON MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.05 ppb

See more details...

Site ID: SITE 01117

CAMP PENDLETON MCB

Contaminated Ground Water

Cost

$272K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2012

This site is under ongoing monitoring until Oct 2015

Contaminated Areas

Groundwater: High Risk

Contaminants: Vinyl Chloride 3100.0 ppb Trichloroethylene (TCE) 9600.0 ppb

See more details...

Site ID: UST 000013

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

$6.35M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2012

This site is under ongoing monitoring until Apr 2039

Contaminated Areas

Groundwater: High Risk

Contaminants: Acenaphthylene- 4000.0 ppb Acetone 7540.0 ppb Toluene 15900.0 ppb Dichloroethane, 1,2- (EDC) 20000.0 ppb Benzene 41000.0 ppb Trichloroethylene (TCE) 42590.0 ppb Xylene 63190.0 ppb

See more details...

Site ID: UST 000016

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

$64K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2011

This site is under ongoing monitoring until Nov 2015

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethyl benzene 950.0 ppb 1,2,4-Tribromobenzene 1100.0 ppb Toluene-2,6-Diamine 1900.0 ppb o-Xylene 3200.0 ppb

See more details...

Site ID: UST 000024

CAMP PENDLETON MCB

Underground Storage Tanks

Cost

$767K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2005

This site is under ongoing monitoring until Dec 2021

Contaminated Areas

Groundwater: High Risk

Contaminants: Ether,tert-butyl methyl 37000.0 ppb 1,2-Dichloroethane (EDC) 500000.0 ppb Chromium VI and compounds 1400000.0 ppb Zinc 2600000.0 ppb Benzene 7200000.0 ppb Toluene 11000000.0 ppb Xylene (mixed) 11000000.0 ppb

See more details...

Site ID: SITE 00096

CAMP PENDLETON MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.24 ppb Naphthalene 0.81 ppb

See more details...

Site ID: SITE 00006

CAMP PENDLETON MCB

Surface Disposal Area

Cost

$4.91M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

This site is under ongoing monitoring until Dec 2025

Contaminated Areas

Groundwater: High Risk

Contaminants: Vinyl chloride 2000.0 ppb Trichloroethane, 1,1,1- 5000.0 ppb Dichloroethane, 1,2- (EDC) 10000.0 ppb Dichloroethane, 1,1- 10000.0 ppb Trichloroethylene (TCE) 19000.0 ppb Antimony and compounds 23200.0 ppb Dichloroethylene, 1,1- 50000.0 ppb Dichloroethylene, 1,2- (mixture) 99000.0 ppb Nickel and compounds 534000.0 ppb

Soil: Low Risk

Contaminants: DDD 10.0 ppb

See more details...

Site ID: SITE 00062

CAMP PENDLETON MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Oct 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Methylene chloride 0.5 ppb

See more details...

Site ID: SITE 01000

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 2010

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.0 ppb Arsenic (cancer) 6.4 ppb Antimony and compounds 35.3 ppb Chromium VI and compounds 40.5 ppb Lead 1100.0 ppb Manganese and compounds 1300.0 ppb

See more details...

Site ID: SITE 00132

CAMP PENDLETON MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Ethylbenzene 0.03 ppb Benzene 0.05 ppb Toluene 0.24 ppb Xylene (mixed) 0.56 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1.2 ppb

See more details...

Site ID: SITE 00066

CAMP PENDLETON MCB

Incinerator

Cost

Unknown

Final Cleanup Action

Apr 2009

Contaminated Areas

Soil: Low Risk

Contaminants: Toluene 0.12 ppb

See more details...

Site ID: SITE 02001

CAMP PENDLETON MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00003

CAMP PENDLETON MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Apr 2005

Contaminated Areas

Soil: Low Risk

Contaminants: Dimethylbenzene 0.024 ppb

See more details...

Site ID: SITE 00004

CAMP PENDLETON MCB

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Dec 1995

Contaminated Areas

Groundwater: Low Risk

Contaminants: Dichloroethane, 1,1- 5000.0 ppb

Soil: Low Risk

Contaminants: Arsenic (cancer) 1.0 ppb

See more details...

Site ID: SITE 00005

CAMP PENDLETON MCB

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Dec 1995

Contaminated Areas

Groundwater: Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »