Cost So Far
$122M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$47.4M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2045
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
43 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: has restrictions on groundwater use, disturbance of surface or subsurface soil. see more » annual written certification of compliance with lucs incorporation of lucs into a base master plan prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. groundwater use restricted. « see less
4 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 00039
BARSTOW MCLB
Surface Disposal Area
Cost
$8.24M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2017
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Dichloroethylene, 1,1- 53000.0 ppb Trichloroethylene (TCE) 141000.0 ppb PCE 230000.0 ppb
Soil: Medium Risk
Contaminants: Dibenz[ah]anthracene 0.72 ppb Benzo[a]pyrene 2.29 ppb Benzo[k]fluoranthene 4.95 ppb
Site ID: SITE 00040
BARSTOW MCLB
Contaminated Ground Water
Cost
$646K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Sep 2024
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethyl benzene 9800.0 ppb
Sediment (Fresh): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Sediment (Marine): Risk Not Evaluated
Surface Water (Fresh): Risk Not Evaluated
Surface Water (Human): Risk Not Evaluated
Surface Water (Marine): Risk Not Evaluated
Site ID: SITE 00037
BARSTOW MCLB
Contaminated Ground Water
Cost
$34.7M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2005
Contaminated Areas
Groundwater: High Risk
Contaminants: Trichloroethane, 1,1,1- 2000.0 ppb Dichloroethane, 1,1- 2000.0 ppb Trichlorofluoromethane 47000.0 ppb Dichloroethylene, 1,1- 53000.0 ppb Trichloroethylene (TCE) 78000.0 ppb Tetrachloroethylene (PCE) 115000.0 ppb
Site ID: SITE 00038
BARSTOW MCLB
Contaminated Ground Water
Cost
$1.42M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2005
This site is under ongoing monitoring until Jan 2035
Contaminated Areas
Groundwater: High Risk
Contaminants: Dichloroethane, 1,2- (EDC) 4000.0 ppb Dichlorobenzene, 1,4- 66000.0 ppb Tetrachloroethylene (PCE) 80000.0 ppb Trichloroethylene (TCE) 290000.0 ppb
39 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 00002
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 1991
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 1.0 ppb
Site ID: SITE 00003
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Dichlorobenzene, 1,4- 66000.0 ppb Tetrachloroethylene (PCE) 80000.0 ppb Trichloroethylene (TCE) 290000.0 ppb
Soil: Low Risk
Contaminants: DDT 0.05 ppb DDE 0.05 ppb Pyrene 0.07 ppb Dieldrin 0.09 ppb Beryllium and compounds 0.91 ppb Selenium 14.3 ppb Lead 17.2 ppb Nickel and compounds 17.3 ppb Boron 57.0 ppb Zinc 75.3 ppb Barium and compounds 234.0 ppb Strontium, stable 521.0 ppb Aluminum 24300.0 ppb
Site ID: SITE 00004
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Anthracene 0.01 ppb Carbazole 0.01 ppb Acenaphthene 0.02 ppb Phenanthrene 0.03 ppb Dibenz[ah]anthracene 0.05 ppb Fluoranthene 0.12 ppb Pyrene 0.13 ppb Benz[a]anthracene 0.15 ppb Chrysene 0.17 ppb Indeno[1,2,3-cd]pyrene 0.19 ppb Benzo[a]pyrene 0.27 ppb Benzo[b]fluoranthene 0.36 ppb Silver and compounds 1.4 ppb Strontium, stable 83.8 ppb
Site ID: SITE 00005
BARSTOW MCLB
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1996
This site is under ongoing monitoring until Oct 2005
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.01 ppb Aldrin 0.01 ppb HCH (gamma) Lindane 0.01 ppb Heptachlor 0.01 ppb Trichloroethylene (TCE) 0.01 ppb Endosulfan 0.02 ppb DDD 0.02 ppb Phenol 0.03 ppb Dieldrin 0.03 ppb Hexane, n- 0.04 ppb Chrysene 0.04 ppb Endrin 0.04 ppb Methylene chloride 0.04 ppb Acetone 0.05 ppb Pyrene 0.06 ppb Fluoranthene 0.1 ppb DDT 0.12 ppb Phenanthrene 0.12 ppb DDE 0.14 ppb Polychlorinated biphenyls (PCBs) 0.18 ppb
Site ID: SITE 00008
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00009
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Mar 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Carbon disulfide 0.01 ppb Acetone 0.02 ppb
Site ID: SITE 00010
BARSTOW MCLB
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Nov 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 0.01 ppb
Site ID: SITE 00011
BARSTOW MCLB
Burn Area
Cost
Unknown
Final Cleanup Action
Mar 1996
This site is under ongoing monitoring until Oct 2005
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 0.01 ppb Acetone 0.01 ppb Methoxychlor 0.01 ppb DDE 0.01 ppb Acenaphthene 0.01 ppb Methylene chloride 0.03 ppb Phenanthrene 0.03 ppb Benzo[a]pyrene 0.06 ppb Benz[a]anthracene 0.06 ppb Dieldrin 0.06 ppb Chrysene 0.07 ppb Benzo[b]fluoranthene 0.09 ppb Fluoranthene 0.1 ppb Pyrene 0.11 ppb
Site ID: SITE 00014
BARSTOW MCLB
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Methoxychlor 0.02 ppb Endrin 0.03 ppb Dieldrin 0.06 ppb Phenanthrene 0.07 ppb DDD 0.16 ppb DDT 0.25 ppb Indeno[1,2,3-cd]pyrene 0.28 ppb Benzo[k]fluoranthene 0.28 ppb Benzo[b]fluoranthene 0.33 ppb Benz[a]anthracene 0.33 ppb Benzo[a]pyrene 0.35 ppb Fluoranthene 0.37 ppb Chrysene 0.37 ppb DDE 0.41 ppb Pyrene 0.43 ppb
Site ID: SITE 00017
BARSTOW MCLB
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Dec 1998
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo[a]pyrene 0.08 ppb Chrysene 0.21 ppb Antimony and compounds 7.6 ppb Lead 139.0 ppb
Site ID: SITE 00019
BARSTOW MCLB
Mixed Waste Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Pyrene 0.01 ppb Benzo[b]fluoranthene 0.01 ppb Fluoranthene 0.01 ppb Chrysene 0.01 ppb DDE 0.01 ppb Phenanthrene 0.01 ppb Endosulfan 0.02 ppb Endrin 0.04 ppb Methoxychlor 0.14 ppb Beryllium and compounds 0.79 ppb Thallium carbonate 1.1 ppb Arsenic (cancer endpoint) 13.7 ppb Copper and compounds 18.7 ppb Zinc 60.4 ppb Vanadium 82.3 ppb Strontium, stable 145.0 ppb Barium and compounds 228.0 ppb Aluminum 22000.0 ppb
Site ID: SITE 00035
BARSTOW MCLB
Landfill
Cost
$945K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2002
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: High Risk
Contaminants: Dichloroethylene, 1,2- (trans) 1000.0 ppb Phenmedipham 2000.0 ppb Trichloroethane, 1,1,1- 2000.0 ppb Trichloroethane, 1,1,2- 4000.0 ppb Bisphenol A 4000.0 ppb Methyl ethyl ketone 6000.0 ppb Antimony and compounds 6400.0 ppb Dichloroethylene, 1,1- 12000.0 ppb Dichloroethane, 1,1- 13000.0 ppb Tetrachloroethylene (PCE) 44000.0 ppb Trichlorofluoromethane 51000.0 ppb Cadmium and compounds 70700.0 ppb Silver and compounds 74100.0 ppb Trichloroethylene (TCE) 120000.0 ppb Chromium VI and compounds 228000.0 ppb Nickel and compounds 581000.0 ppb Aluminum 2210000.0 ppb
Soil: Low Risk
Contaminants: Tetrachloroethylene (PCE) 0.01 ppb Ethylbenzene 0.02 ppb Toluene 0.02 ppb Naphthalene 0.04 ppb Indeno[1,2,3-cd]pyrene 0.06 ppb Carbazole 0.06 ppb Acetaldehyde 0.07 ppb Xylene (mixed) 0.08 ppb Benzo[k]fluoranthene 0.08 ppb Benzo[a]pyrene 0.08 ppb Fluorene 0.08 ppb Benzo[b]fluoranthene 0.12 ppb Chrysene 0.13 ppb Fluoranthene 0.26 ppb Pyrene 0.3 ppb Phenanthrene 0.46 ppb Polychlorinated biphenyls (PCBs) 5.7 ppb
Site ID: SITE 00021
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 1997
Contaminated Areas
Soil: High Risk
Contaminants: Endrin 0.01 ppb Methoxychlor 0.01 ppb DDD 0.01 ppb Anthracene 0.05 ppb Methylene chloride 0.05 ppb Methyl acetate 0.05 ppb Phenanthrene 0.05 ppb Tetrachloroethylene (PCE) 0.06 ppb DDT 0.06 ppb DDE 0.12 ppb Endosulfan 0.16 ppb Polychlorinated biphenyls (PCBs) 247.0 ppb
Site ID: SITE 00022
BARSTOW MCLB
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Groundwater: Low Risk
Contaminants: Dichloroethylene, 1,1- 53000.0 ppb Tetrachloroethylene (PCE) 115000.0 ppb
Soil: Low Risk
Contaminants: Dieldrin 0.06 ppb
Site ID: SITE 00025
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 0.01 ppb
Site ID: SITE 00027
BARSTOW MCLB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 0.02 ppb Anthracene 0.03 ppb Phenanthrene 0.03 ppb Carbazole 0.04 ppb Fluoranthene 0.06 ppb Chrysene 0.06 ppb Indeno[1,2,3-cd]pyrene 0.08 ppb Pyrene 0.09 ppb Benzo[a]pyrene 0.12 ppb Benzo[b]fluoranthene 0.19 ppb Methoxychlor 0.19 ppb
Site ID: SITE 00028
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo[b]fluoranthene 0.01 ppb Aldrin 0.01 ppb HCH (gamma) Lindane 0.01 ppb Methoxychlor 0.01 ppb DDD 0.01 ppb Heptachlor 0.01 ppb Fluoranthene 0.02 ppb Benzo[a]pyrene 0.03 ppb Nitroaniline, 2- 0.03 ppb Pyrene 0.08 ppb Phenanthrene 0.31 ppb Selenium 1.7 ppb Molybdenum 7.1 ppb
Site ID: SITE 00029
BARSTOW MCLB
Storage Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 2.5 ppb
Site ID: SITE 00030
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Toxaphene 0.09 ppb Selenium 0.67 ppb
Site ID: SITE 00031
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: DDT 0.01 ppb
Site ID: SITE 00032
BARSTOW MCLB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Medium Risk
Contaminants: Pyrene 0.02 ppb Heptachlor 0.03 ppb Methoxychlor 0.04 ppb DDE 0.05 ppb Heptachlor epoxide 0.2 ppb Beryllium and compounds 0.97 ppb Polychlorinated biphenyls (PCBs) 5.7 ppb Nickel and compounds 25.3 ppb Vanadium 44.4 ppb Boron 60.0 ppb
Site ID: SITE 00036
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Selenium 1.5 ppb
Site ID: UST 000001
BARSTOW MCLB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1998
Contaminated Areas
Groundwater: High Risk
Contaminants: PCE 230000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 400000.0 ppb
Soil: High Risk
Contaminants: Benzene 50000.0 ppb
Site ID: UST 000002
BARSTOW MCLB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2004
This site is under ongoing monitoring until Sep 2014
Contaminated Areas
Groundwater: High Risk
Contaminants: PCE 239000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 739000.0 ppb
Soil: Low Risk
Contaminants: Benzo[b]fluoranthene 0.01 ppb Dichloroethane, 1,1- 0.02 ppb Ethylbenzene 0.06 ppb Trichloroethylene (TCE) 0.1 ppb Toluene 0.17 ppb Xylene (mixed) 0.26 ppb Trichloroethane, 1,1,1- 0.43 ppb Fluorene 0.54 ppb Tetrachloroethylene (PCE) 0.59 ppb Carbazole 0.62 ppb Dibenz[ah]anthracene 0.72 ppb Indeno[1,2,3-cd]pyrene 1.28 ppb Anthracene 1.47 ppb Benzo[a]pyrene 2.29 ppb Naphthalene 2.42 ppb Benz[a]anthracene 2.95 ppb Chrysene 3.14 ppb Phenanthrene 4.3 ppb Fluoranthene 4.53 ppb Pyrene 4.62 ppb Benzo[k]fluoranthene 4.95 ppb Acenaphthene 8.1 ppb
Site ID: SITE 00023
BARSTOW MCLB
Landfill
Cost
$830K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2001
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: High Risk
Contaminants: Cadmium and compounds 6000.0 ppb Tetrachloroethylene (PCE) 18000.0 ppb Trichloroethylene (TCE) 34000.0 ppb
Soil: Medium Risk
Contaminants: Dieldrin 0.01 ppb Hexane, n- 0.02 ppb Methylene chloride 0.04 ppb Acetone 0.05 ppb DDD 0.07 ppb DDE 0.09 ppb Polychlorinated biphenyls (PCBs) 0.25 ppb DDT 0.37 ppb
Site ID: SITE 00001
BARSTOW MCLB
Landfill
Cost
Unknown
Final Cleanup Action
Dec 1996
This site is under ongoing monitoring until Oct 2005
Contaminated Areas
Soil: Medium Risk
Contaminants: DDD 0.01 ppb Endrin 0.02 ppb Phenanthrene 0.05 ppb Polychlorinated biphenyls (PCBs) 0.1 ppb DDT 0.11 ppb DDE 0.15 ppb Dieldrin 0.18 ppb Pyrene 0.25 ppb Benz[a]anthracene 0.28 ppb Chrysene 0.37 ppb Benzo[a]pyrene 0.58 ppb Thallium carbonate 0.61 ppb Benzo[k]fluoranthene 0.75 ppb Selenium 1.2 ppb Cadmium and compounds 3.9 ppb Arsenic (cancer endpoint) 7.6 ppb Lead 64.1 ppb Zinc 68.7 ppb Strontium, stable 523.0 ppb
Site ID: SITE 00012
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Anthracene 0.01 ppb Benzo[b]fluoranthene 0.01 ppb Fluoranthene 0.01 ppb Benzo[a]pyrene 0.01 ppb Acenaphthene 0.01 ppb Carbazole 0.01 ppb Phenanthrene 0.04 ppb Pyrene 0.58 ppb Thallium carbonate 0.74 ppb Antimony and compounds 11.2 ppb Strontium, stable 146.0 ppb
Site ID: SITE 00024
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Pyrene 0.02 ppb Endosulfan 0.05 ppb
Site ID: SITE 00026
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Medium Risk
Contaminants: HCH (beta) 0.01 ppb Trichloroethylene (TCE) 0.01 ppb DDT 0.06 ppb Tetrachloroethylene (PCE) 0.12 ppb DDE 0.13 ppb Beryllium and compounds 0.53 ppb Copper and compounds 11.8 ppb Lead 16.7 ppb Boron 18.9 ppb
Site ID: SITE 00015
BARSTOW MCLB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1998
Contaminated Areas
Soil: Low Risk
Contaminants: DDE 0.01 ppb Carbazole 0.01 ppb Anthracene 0.02 ppb Dibenz[ah]anthracene 0.02 ppb Indeno[1,2,3-cd]pyrene 0.03 ppb Methoxychlor 0.03 ppb Polychlorinated biphenyls (PCBs) 0.05 ppb Fluoranthene 0.05 ppb Benzo[b]fluoranthene 0.06 ppb Benzo[a]pyrene 0.08 ppb Trichloroethylene (TCE) 0.08 ppb Phenanthrene 0.12 ppb Pyrene 0.19 ppb Chrysene 0.21 ppb Tetrachloroethylene (PCE) 0.41 ppb Antimony and compounds 7.6 ppb Lead 139.0 ppb
Site ID: SITE 00020
BARSTOW MCLB
Mixed Waste Area
Cost
$693K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2000
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Low Risk
Contaminants: Chromium VI and compounds 1600.0 ppb Nickel-56 41500.0 ppb
Soil: Low Risk
Contaminants: Dieldrin 0.01 ppb DDE 0.01 ppb Acetone 0.15 ppb Ethylene glycol 228.0 ppb
Site ID: SITE 00013
BARSTOW MCLB
Storage Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Strontium, stable 131.0 ppb
Site ID: SITE 00033
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 0.01 ppb
Site ID: UST 000003
BARSTOW MCLB
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2003
This site is under ongoing monitoring until May 2007
Contaminated Areas
Soil: High Risk
Contaminants: Benzene 50000.0 ppb
Groundwater: Low Risk
Contaminants: Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 10000.0 ppb
Site ID: SITE 00018
BARSTOW MCLB
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Mar 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Endrin 0.01 ppb Methylene chloride 0.02 ppb Indeno[1,2,3-cd]pyrene 0.03 ppb Benzo[a]pyrene 0.03 ppb Phenol 0.04 ppb Benz[a]anthracene 0.05 ppb Benzo[b]fluoranthene 0.06 ppb Chrysene 0.06 ppb Phenanthrene 0.11 ppb Fluoranthene 0.14 ppb Pyrene 0.28 ppb
Site ID: SITE 00016
BARSTOW MCLB
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Dec 1998
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Trichloroethane, 1,1,1- 2000.0 ppb Dichloroethane, 1,1- 2000.0 ppb Trichlorofluoromethane 47000.0 ppb Dichloroethylene, 1,1- 53000.0 ppb Trichloroethylene (TCE) 78000.0 ppb Tetrachloroethylene (PCE) 115000.0 ppb
Site ID: SITE 00034
BARSTOW MCLB
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Arochlor 1016 1.0 ppb
Site ID: SITE 00006
BARSTOW MCLB
Landfill
Cost
Unknown
Final Cleanup Action
Dec 1996
This site is under ongoing monitoring until Oct 2005
Contaminated Areas
Soil: Low Risk
Contaminants: Pyrene 0.01 ppb Benzo[b]fluoranthene 0.01 ppb Fluoranthene 0.01 ppb DDD 0.01 ppb Heptachlor 0.01 ppb Endrin 0.02 ppb DDE 0.02 ppb Methoxychlor 0.03 ppb Chrysene 0.04 ppb Carbazole 0.05 ppb Phenanthrene 0.1 ppb Methylphenol, 4- 0.12 ppb Dimethylphenol, 2,4- 0.18 ppb Selenium 1.5 ppb Lead 69.2 ppb
Site ID: SITE 00007
BARSTOW MCLB
Storage Area
Cost
$2.24M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2000
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: High Risk
Contaminants: Thallium carbonate 3000.0 ppb Trichloroethylene (TCE) 10000.0 ppb Fluoranthene 48000.0 ppb
Soil: Medium Risk
Contaminants: Tetrachloroethylene (PCE) 0.02 ppb Trichloroethylene (TCE) 0.02 ppb Dichloroethane, 1,2- (EDC) 0.03 ppb Pyrene 0.03 ppb Dichloropropane, 1,2- 0.03 ppb Dieldrin 0.1 ppb Dichlorobenzene, 1,2- 0.1 ppb Endrin 0.13 ppb DDE 0.2 ppb Mercury and compounds (inorganic) 0.34 ppb DDD 0.39 ppb Trichloropropane, 1,2,3- 0.4 ppb Thallium carbonate 0.64 ppb DDT 0.77 ppb Selenium 1.4 ppb Polychlorinated biphenyls (PCBs) 2.7 ppb Cadmium and compounds 230.0 ppb Lead 839.0 ppb Barium and compounds 1560.0 ppb Zinc 2700.0 ppb Copper and compounds 2800.0 ppb Aluminum 14000.0 ppb
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »