NAVY INSTALLATION ID: CA917302478300

TUSTIN MCAS

irvine, California

Cost So Far

$74.7M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$18.3M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2038

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

13 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions. see more » annual written certification of compliance with lucs a deed restriction is documented in the parcel deed. prohibit construction and/or operation of businesses, structures or other areas frequented by sensitive populations, such as children and the elderly, unless prior written approval of the navy and lead regulatory agency is obtained. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. groundwater use restricted. prohibits the disturbance or use of existing groundwater wells, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

5 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00012

TUNDERGROUND STORAGE TANKSIN MCAS

Storage Area

Cost

$3.32M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2008

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Lead 2440.0 ppb Cadmium and compounds 5250.0 ppb Cyanide (free) 19900.0 ppb Arsenic (cancer) 40000.0 ppb Methylene chloride 71000.0 ppb Selenium 377100.0 ppb Trichloroethylene (TCE) 1000000.0 ppb

Soil: Low Risk

Contaminants: Methylene chloride 0.07 ppb DDD 0.16 ppb DDT 0.33 ppb DDE 0.59 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.6 ppb Arsenic (cancer) 11.6 ppb Chromium VI and compounds 20.91 ppb Lead 39.5 ppb

See more details...

Site ID: SITE 00006

TUNDERGROUND STORAGE TANKSIN MCAS

Storage Area

Cost

$5.12M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2014

Contaminated Areas

Soil: Medium Risk

Contaminants: Dibutyl phthalate 0.07 ppb Beryllium and compounds 0.46 ppb Lead 6.1 ppb Chromium VI and compounds 6.3 ppb Nickel and compounds 6.5 ppb Copper and compounds 11.6 ppb Vanadium 23.0 ppb Zinc 24.4 ppb Arsenic (cancer) 36.2 ppb Barium and compounds 60.2 ppb Manganese and compounds 179.0 ppb Aluminum 9450.0 ppb Iron 12200.0 ppb

See more details...

Site ID: SITE 00013

TUNDERGROUND STORAGE TANKSIN MCAS

Storage Area

Cost

$3.32M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2008

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury 230.0 ppb Lead 1610.0 ppb Trichloroethylene (TCE) 12000.0 ppb Cyanide (free) 22000.0 ppb Antimony and compounds 37500.0 ppb Selenium 197100.0 ppb 1,2,3-Trichloropropane 200000.0 ppb

Soil: Low Risk

Contaminants: DDT 0.08 ppb Methylene chloride 0.08 ppb PCBs 0.5 ppb Fluorene 0.82 ppb Cyanide (free) 1.2 ppb Phenol 1.4 ppb Dibutyl phthalate 1.7 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3.7 ppb Benzo[a]pyrene 5.3 ppb Benzo(b)fluoranthene 6.8 ppb Arsenic (cancer) 15.0 ppb Chromium VI and compounds 85.0 ppb Copper and compounds 337.0 ppb

See more details...

Site ID: SITE 00005

TUNDERGROUND STORAGE TANKSIN MCAS

Drainage Ditch

Cost

$747K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2013

Contaminated Areas

Soil: Medium Risk

Contaminants: Methylene chloride 0.06 ppb Acetone 0.07 ppb Mercury 0.18 ppb Dibenz[ah]anthracene 0.49 ppb Cyanide (free) 1.4 ppb Phenol 1.6 ppb Fluoranthene 1.9 ppb Pyrene 2.0 ppb Chrysene 3.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 5.0 ppb Benzo[b]fluoranthene 8.7 ppb Benzo[k]fluoranthene 8.7 ppb Chromium VI and compounds 23.0 ppb Lead 160.0 ppb Zinc 1310.0 ppb

See more details...

Site ID: SITE 00003

TUNDERGROUND STORAGE TANKSIN MCAS

Surface Disposal Area

Cost

$3.32M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2008

Contaminated Areas

Groundwater: High Risk

Contaminants: Beryllium and compounds 1530.0 ppb Zinc 14900.0 ppb Dichloroethane, 1,1- 39000.0 ppb Selenium 45500.0 ppb Cadmium and compounds 68590.0 ppb Methylene chloride 100000.0 ppb Chloroform 130000.0 ppb Dichloroethylene, 1,1- 300000.0 ppb Trichloroethane, 1,1,1- 580000.0 ppb Dichloroethylene, 1,2- (trans) 780000.0 ppb Trichloroethylene (TCE) 3000000.0 ppb

Soil: Medium Risk

Contaminants: Acetone 0.07 ppb DDT 0.1 ppb Mercury 0.29 ppb Trichloroethylene (TCE) 0.32 ppb Methylene chloride 0.34 ppb Thallium 0.4 ppb Selenium 0.9 ppb Cyanide (free) 0.96 ppb Phenanthrene 1.8 ppb 1,1,2-Trichloro-1,2,2-trifluoroethane 1.9 ppb Butyl benzyl phthalate 1.9 ppb Benz(a)anthracene 2.0 ppb Dibutyl phthalate 2.0 ppb Pyrene 2.1 ppb Fluoranthene 4.5 ppb Benzo[k]fluoranthene 5.1 ppb Silver and compounds 7.8 ppb Phenol 24.0 ppb Arsenic (cancer) 24.3 ppb Nickel and compounds 40.0 ppb Cadmium and compounds 47.6 ppb Copper and compounds 205.0 ppb Lead 621.0 ppb Zinc 761.0 ppb Chromium VI and compounds 853.0 ppb

See more details...

8 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00002

TUNDERGROUND STORAGE TANKSIN MCAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Copper and compounds 5900.0 ppb Chromium (III) 9500.0 ppb Zinc 25300.0 ppb Methylene chloride 39000.0 ppb Arsenic (cancer) 76200.0 ppb Selenium 442300.0 ppb

Soil: Low Risk

Contaminants: DDD,4,4- 0.02 ppb DDE 0.03 ppb DDT 0.04 ppb Methylene chloride 0.16 ppb Mercury 0.31 ppb Thallium 1.0 ppb Arsenic (cancer) 18.3 ppb Chromium (III) 18.9 ppb Copper and compounds 45.0 ppb Zinc 80.7 ppb Lead 104.0 ppb

See more details...

Site ID: SITE 00008

TUNDERGROUND STORAGE TANKSIN MCAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jan 2005

Contaminated Areas

Groundwater: Low Risk

Contaminants: Lead 1210.0 ppb Dichloropropane, 1,2- 8000.0 ppb Cyanide (free) 13400.0 ppb Selenium 55160.0 ppb

Soil: Low Risk

Contaminants: Acetone 0.07 ppb Methylene chloride 0.11 ppb Arsenic (cancer) 6.97 ppb Chromium VI and compounds 13.77 ppb Lead 68.77 ppb

See more details...

Site ID: SITE 00011

TUNDERGROUND STORAGE TANKSIN MCAS

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 2005

Contaminated Areas

Groundwater: Low Risk

Contaminants: Trichloroethylene (TCE) 1600.0 ppb

Soil: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.05 ppb Beryllium and compounds 0.38 ppb Thallium 0.57 ppb Arsenic (cancer) 4.9 ppb Lead 7.1 ppb Nickel and compounds 16.7 ppb Chromium VI and compounds 21.2 ppb Copper and compounds 23.7 ppb Vanadium 44.1 ppb Zinc 80.8 ppb Barium and compounds 191.0 ppb Manganese and compounds 294.0 ppb Aluminum 22500.0 ppb Iron 25700.0 ppb

See more details...

Site ID: SITE 00015

TUNDERGROUND STORAGE TANKSIN MCAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Mar 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Chromium (III) 3000.0 ppb Aluminum 200000.0 ppb Molybdenum 200000.0 ppb

Soil: Low Risk

Contaminants: Beryllium and compounds 0.54 ppb Thallium 0.64 ppb Antimony and compounds 0.86 ppb Arsenic (cancer) 7.8 ppb Lead 11.4 ppb Nickel and compounds 18.0 ppb Chromium VI and compounds 23.7 ppb Vanadium 50.5 ppb Zinc 78.1 ppb Barium and compounds 149.0 ppb Manganese and compounds 417.0 ppb Aluminum 19200.0 ppb Iron 29400.0 ppb

See more details...

Site ID: SITE 00001

TUNDERGROUND STORAGE TANKSIN MCAS

Fire/Crash Training Area

Cost

$2.37M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: Low Risk

Contaminants: Dichloroethane, 1,2- (EDC) 3200.0 ppb Trichloroethane, 1,1,1- 6000.0 ppb Vinyl chloride 8700.0 ppb Trichloroethylene (TCE) 19000.0 ppb Trans-dichloroethylene, 1,2- 27000.0 ppb 1,1-Dichloroethylene 27000.0 ppb Benzene 150000.0 ppb Dichloroethane, 1,1- 310000.0 ppb Naphthalene 6000000.0 ppb Xylene (mixed) 7000000.0 ppb Ethyl benzene 8000000.0 ppb

See more details...

Site ID: SITE 00035

TUNDERGROUND STORAGE TANKSIN MCAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

May 2000

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 34000.0 ppb 1,2,3-Trichloropropane 100000.0 ppb Benzene 130000.0 ppb Xylene (mixed) 177000.0 ppb Trichloroethylene (TCE) 2000000.0 ppb

See more details...

Site ID: TUSTIN ENV

TUNDERGROUND STORAGE TANKSIN MCAS

Unknown Site Type

Cost

$992K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2011

This site is under ongoing monitoring until Apr 2023

Site ID: SITE 00009

TUNDERGROUND STORAGE TANKSIN MCAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: High Risk

Contaminants: Dieldrin 0.02 ppb DDT 0.05 ppb Acetone 0.05 ppb Methylene chloride 0.11 ppb Dibutyl phthalate 0.41 ppb Mercury and compounds (methyl) 0.6 ppb Anthracene 0.79 ppb Dibenz[ah]anthracene 1.1 ppb Pyrene 1.3 ppb Phenanthrene 2.6 ppb Indeno[1,2,3-cd]pyrene 3.4 ppb Benzotrichloride 3.4 ppb Bis(2-ethylhexyl)phthalate (DEHP) 4.2 ppb Cadmium and compounds 6.4 ppb Benz(a)anthracene 7.7 ppb Benzo[a]pyrene 8.0 ppb Fluoranthene 11.0 ppb Arsenic (cancer) 13.1 ppb Chrysene 14.0 ppb Cyanide (free) 16.8 ppb Benzo[b]fluoranthene 24.0 ppb Benzo[k]fluoranthene 24.0 ppb Chromium VI and compounds 25.7 ppb Lead 297.0 ppb Zinc 816.0 ppb

Groundwater: Low Risk

Contaminants: Cyanide (free) 11600.0 ppb Trichloroethylene (TCE) 14000.0 ppb Methylene chloride 27000.0 ppb Methylenebisbenzeneamine, 4,4'- 32000.0 ppb Selenium 110800.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »