Cost So Far
$20.8M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$16.3M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2025
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
19 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, warning signs, signs. see more » a fence around controlled area, with or without gate. a warning sign is in place surrounding the area prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. « see less
1 Active Site
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: UXO 000001
BRIDGEPORT MCMWTC
Landfill
Cost
$14.4M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2024
This site is under ongoing monitoring until Jan 2035
Contaminated Areas
Groundwater: Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water (Fresh): Risk Not Evaluated
Surface Water (Human): Risk Not Evaluated
18 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 00003
BRIDGEPORT MCMWTC
Landfill
Cost
$2.29M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2000
This site is under ongoing monitoring until Mar 2045
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Toluene 200.0 ppb Vinyl acetate 6000.0 ppb
Soil: Low Risk
Contaminants: Lead 38.85 ppb
Site ID: SITE 00004
BRIDGEPORT MCMWTC
Spill Site Area
Cost
$112K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2003
This site is under ongoing monitoring until Dec 2015
Contaminated Areas
Groundwater: High Risk
Contaminants: Toluene 250000.0 ppb Xylene (mixed) 2800000.0 ppb Ethylbenzene 4800000.0 ppb Benzene 13000000.0 ppb
Site ID: SITE 00001
BRIDGEPORT MCMWTC
Contaminated Soil Piles
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Benzene 500.0 ppb
Soil: Medium Risk
Contaminants: Mercury and compounds (inorganic) 6.52 ppb Lead 9.2 ppb
Site ID: SITE 00002
BRIDGEPORT MCMWTC
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Jun 2011
Contaminated Areas
Groundwater: High Risk
Contaminants: Benzene 5800.0 ppb Chlorobenzene 7100.0 ppb Trichloroethylene (TCE) 9700.0 ppb Dichloroethane, 1,1- 11000.0 ppb Carbon disulfide 13000.0 ppb Phenol 32000.0 ppb Toluene 54000.0 ppb Acetone 830000.0 ppb Naphthalene 12000000.0 ppb
Soil: High Risk
Contaminants: Methyl ethyl ketone 2.1 ppb Naphthalene 2500.0 ppb
Site ID: SITE 00005
BRIDGEPORT MCMWTC
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2003
This site is under ongoing monitoring until Sep 2005
Contaminated Areas
Soil: Low Risk
Contaminants: Manganese and compounds 1340.0 ppb
Site ID: SITE 00006
BRIDGEPORT MCMWTC
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 1998
Contaminated Areas
Groundwater: Low Risk
Contaminants: Methyl ethyl ketone 1000.0 ppb Acetone 12000.0 ppb
Soil: Low Risk
Contaminants: DDT 0.01 ppb
Site ID: SITE 00007
BRIDGEPORT MCMWTC
Landfill
Cost
Unknown
Final Cleanup Action
Feb 2001
Contaminated Areas
Groundwater: Low Risk
Contaminants: DDT 34000.0 ppb Benzo(j)Fluoranthene 54000.0 ppb
Soil: Low Risk
Contaminants: Benzo[a]pyrene 0.05 ppb
Site ID: SITE 00008
BRIDGEPORT MCMWTC
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Site ID: SITE 00009
BRIDGEPORT MCMWTC
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jun 1998
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic (cancer) 75.3 ppb
Site ID: SITE 00010
BRIDGEPORT MCMWTC
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Contaminated Areas
Soil: Low Risk
Contaminants: Phenanthrene 0.05 ppb Arsenic (cancer) 4.5 ppb
Site ID: UST 001005
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2003
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Benzene 8860.0 ppb
Site ID: UST 001021
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2002
This site is under ongoing monitoring until Sep 2012
Contaminated Areas
Groundwater: High Risk
Contaminants: Benzene 213000.0 ppb
Site ID: UST 001025
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1997
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Dibutyl phthalate 1000.0 ppb Lead 10600.0 ppb Arsenic (cancer) 16000.0 ppb Nickel and compounds 21900.0 ppb Chromium VI and compounds 26400.0 ppb Copper and compounds 59900.0 ppb Vanadium 111000.0 ppb Zinc 114000.0 ppb Barium and compounds 350000.0 ppb Manganese and compounds 960000.0 ppb Aluminum 33200000.0 ppb Iron 34300000.0 ppb
Site ID: UST 001040
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1994
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Dibutyl phthalate 800.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 930.0 ppb Selenium 3600.0 ppb Thallium 6200.0 ppb Lead 7400.0 ppb Chromium VI and compounds 7400.0 ppb Arsenic (cancer) 8200.0 ppb Vanadium 30200.0 ppb Copper and compounds 36400.0 ppb Zinc 49600.0 ppb Barium and compounds 187000.0 ppb Manganese and compounds 536000.0 ppb Iron 11600000.0 ppb Aluminum 11800000.0 ppb
Site ID: UST 006000
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Benzene 2500.0 ppb
Site ID: UST 007007
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 2001
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Lead 4000.0 ppb Zinc 40000.0 ppb
Site ID: SWMU 02002
BRIDGEPORT MCMWTC
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1995
Site ID: UST 001026
BRIDGEPORT MCMWTC
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1997
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 2000.0 ppb Chromium VI and compounds 5000.0 ppb Lead 5100.0 ppb Arsenic (cancer) 6200.0 ppb Acetone 13000.0 ppb Vanadium 21300.0 ppb Copper and compounds 23800.0 ppb Zinc 50000.0 ppb Barium and compounds 152000.0 ppb Manganese and compounds 3640000.0 ppb Aluminum 8960000.0 ppb Iron 9350000.0 ppb
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »