Cost So Far
$127M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$17.1M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2050
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
206 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: dig permits. see more » environmental covenants dig permits shall not conduct or allow others to conduct any construction, excavation, drilling, grading. removal, trenching. filling, earth movement. mining, and planting that would disturb the soil without regulatory approval. do not conduct activities that would cause surface application or injection of water or other fluids to affect the integrity of the landfill or the groundwater flow direction. grantee shall continuously maintain, repair and replace the impermeable surface paving materials as presently exist on the property such that no surface water intrusion onto the property may occur through such paved surfaces. do not knowingly disrupt any remedial activities do not limit access to site grantor shall maintain paved surfaces will not conduct or allow others to conduct activities that would disrupt environmental investigations or remedial actions or limit access to the site for inspections do not disturb fence, gates or signs do not disturb asphalt cover, or other landfill equipment. do not limit access to landfill or landfill equipment do not conduct activities that would disrupt environmental investigations, remedial actions or limit access to the site for inspection do not conduct activities that would limit access to the site for inspection protect and allow air force to access groundwater monitoring wells the grantee covenants not to knowingly disrupt any remediation activities the grantee shall not conduct any mineral right or resource extraction, severance or removal activity on the premises, including without limitation sand and gravel extraction operations « see less
2 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: AT005P
PFC - FIRE TRAINING AREA - IRP-05
Fire/Crash Training Area
Cost
$5.35M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
Site ID: CG097
TCE PLUME (CBA OU IN FY94)
Contaminated Ground Water
Cost
$1.3M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 1995
204 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: DP024
AOC 33, BLDG 747, INDUSTRIAL FACILITY/ENGINE OVERHAUL FACILITY
Disposal Pit and Dry Well
Cost
$248K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2018
Site ID: LF002
IRP-02 LANDFILL NO. 2
Landfill
Cost
$3.81M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 0.1 ug/L 1,1-Dichloroethylene 0.3 ug/L Selenium 1.0 ug/L Benzene, methyl- 1.1 ug/L Methylene Chloride 3.1 ug/L Antimony and compounds 4.0 ug/L Carbon Dichloride 5.0 ug/L Chloroform 7.05 ug/L Zinc 12.0 ug/L Bis(2-Ethylhexyl)Phthalate 13.0 ug/L Lead 60.0 ug/L Barium 64.0 ug/L Iron 179.0 ug/L Boron 239.0 ug/L Fluoride 730.0 ug/L
Site ID: SA017
IRP-17 DRUMMED WASTE STORAGE
Storage Area
Cost
$248K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2018
Site ID: SA019
IRP-19 WASTE DRUM STORAGE
Storage Area
Cost
$1.56M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Arsenic 1.0 mg/kg Polychlorinated Biphenyls 28.0 mg/kg Manganese and compounds 269.0 mg/kg
Site ID: SR027
SMALL ARMS RANGE
Small Arms Range
Cost
$1.56M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Site ID: CTU003
38 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU030
333-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: CTU037
427-3 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU061
647-6 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU065
650-5 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU072
653-4 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU098
719-5 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU100
726-4 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU101
726-5 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU130
804-6 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU136
809-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU140
809-7 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: DA096
TCE SOURCE AREAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1996
This site is under ongoing monitoring until Oct 2002
Site ID: SI016
IRP-16 ACC EVAPORATION PONDS
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jul 1999
This site is under ongoing monitoring until Sep 2005
Site ID: RW029
BUILDING 752 PIPELINE
Radioactive Waste Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: AOC
AREAS OF CONCERN
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: CTU163
477-1
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU164
650-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1995
Site ID: CTU165
650-4 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1995
Site ID: DP003
IRP-03 WASTE PIT NO. 2
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: DP004
IRP-04 WASTE PIT NO. 1
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: SD025
AOC 39, GOLF COURSE STORM DRAIN OUTFALL
Storm Drain
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: SI001
IRP-01 INDUSTRIAL WASTE LAGOONS
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Dec 2013
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Acetone 14.0 mg/kg 1,2,4-Trichlorobenzene 48.0 mg/kg 1,2-Dichlorobenzene 230.0 mg/kg Iron 14800.0 mg/kg
Site ID: SP009
IRP-09 PLATING SHOP (CB009 IN RR DBASE)
Plating Shop
Cost
Unknown
Final Cleanup Action
Apr 1996
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chromium VI and compounds 11600.0 mg/kg
Site ID: SR400
FORMER SKEET RANGE NO. 1
Small Arms Range
Cost
Unknown
Final Cleanup Action
Aug 2009
Site ID: SR401
FORMER SKEET RANGE NO. 2
Small Arms Range
Cost
Unknown
Final Cleanup Action
Aug 2009
Site ID: SS008
IRP-08 PCB SPILL AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Polychlorinated Biphenyls 6.2 mg/kg
Site ID: SS018
IRP-18 AVGAS SPILL AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 3.21 ug/L Dibutyl Phthalate 12.0 ug/L Manganese and compounds 25.0 ug/L Chromium 30.0 ug/L Zinc 55.0 ug/L Bis(2-Ethylhexyl)Phthalate 104.0 ug/L Barium 107.0 ug/L Iron 116.0 ug/L Boron 165.0 ug/L Fluoride 630.0 ug/L Silver and compounds 9600.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Lead 1.7666666667 mg/kg Copper and compounds 3.8850000000000002 mg/kg Chromium 7.425 mg/kg Nickel (Soluble Salts) 9.09 mg/kg Methylene Chloride 24.0 mg/kg Zinc 27.7 mg/kg
Site ID: SS028
NORTHEAST BASE GROUNDWATER
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: TU006
IRP-06 WASTE OIL UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: TU015
IRP-15 S-290 UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: TV021
IRP-21 FERRICYANIDE UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: WR020
IRP-20 LOW LEVEL RAD WASTE BURIAL
Radioactive Waste Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: WT007
IRP-07 IWTP SLUDGE DRYING BEDS
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Jun 2012
Site ID: WT013
IRP-13 IWTP SLUDGE DRYING AREA
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 2005
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chromium VI and compounds 5.94 mg/kg Polychlorinated Biphenyls 77.0 mg/kg
Site ID: XU404
CHEMICAL WARFARE TRAINING AREA
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: DP012
IRP-12 WASTE PIT NO. 3
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: SS026
AOC 40, GOLF COURSE MAINTENANCE AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: CTU008
105-4 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU016
169-5 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU024
249-6 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU054
620-6 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU074
671 PD-680
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1987
Site ID: CTU082
697-1 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1993
Site ID: CTU091
716-3 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU116
794 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1992
Site ID: CTU124
803-7 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU125
804-1 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU126
804-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU134
805-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU142
809-9 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU151
863 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: SI011
IRP-11 FUEL SLUDGE DRYING AREA
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: CTU159
2326-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1992
Site ID: CTU103
726-7 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU066
650-6 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: COW163
336 VEHICLE WASH RACK
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: CTU013
169-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU032
335-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU047
575 PD-680
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU069
653-1 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU085
705-2 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU115
763-4 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU138
809-5 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU153
948-1 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: COW164
620 BASE EXCHANGE SERVICE STATION
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU001
6 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU002
21 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU004
100 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1995
Site ID: CTU005
105-1 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU006
105-2 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU007
105-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU009
105-5 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU010
105-6 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU011
105-7 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU012
142 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1995
Site ID: CTU014
169-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU015
169-4 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU017
226-1 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU018
226-2 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU019
226-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU020
227-1 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU021
228 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU022
249-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU023
249-4 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU025
249-7 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU026
249-8 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU027
289 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: CTU028
300-1 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: CTU029
324-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU031
333-3 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU033
335-3 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU034
341-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU035
341-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU036
427-2 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU038
468-1 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU039
468-2 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU040
468-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU041
468-4 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU042
468-6 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU043
468-7 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: CTU044
477 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1996
Site ID: CTU045
479 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU046
528 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU048
617-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU049
620-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU050
620-2 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU051
620-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU052
620-4 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU053
620-5 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU055
620-7 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: CTU056
645 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: CTU057
647-2 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU058
647-3 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU059
647-4 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU060
647-5 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU062
647-7 LUBE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU063
650-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU064
650-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU067
650-7 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU068
650-8 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU070
653-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU071
653-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU073
655 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU075
672 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1991
Site ID: CTU076
675-1 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU077
675-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU078
675-3 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU079
675-4 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU080
680-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1998
Site ID: CTU081
695-2 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1993
Site ID: CTU083
697-2 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1993
Site ID: CTU084
701-3 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU086
705-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU087
705-4 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU088
705-5 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU089
716-1 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU090
716-2 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU092
716-4 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU093
716-5 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU094
719-1 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU095
719-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU096
719-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU097
719-4 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU099
719-6 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU102
726-6 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU104
736-7 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: CTU105
736-8 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: CTU106
736-9 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: CTU107
736-13 HEPTONE
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: CTU108
749-3 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU109
749-4 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU110
754-1 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU111
754-2 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: CTU112
757-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU113
757-2 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU114
763-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU117
795-2 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU118
803-1 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU119
803-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU120
803-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU121
803-4 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU122
803-5 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU123
803-6 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU127
804-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU128
804-4 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU129
804-5 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU131
804-7 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU132
804-8 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU133
804-9 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU135
809-2 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU137
809-4 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU139
809-6 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU141
809-8 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU143
809-10 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1997
Site ID: CTU144
811 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU145
818 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU146
819-2 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU147
820-2 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU148
825 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1996
Site ID: CTU149
844-2 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU150
860-1 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU152
935 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU154
948-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: CTU155
950 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1992
Site ID: CTU156
984-2 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1992
Site ID: CTU157
984-3 HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1992
Site ID: CTU158
1264 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: CTU160
2333 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU161
3101-3 DF-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: CTU162
STABLES HEATING FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: DP014
IRP-14 WASTE PIT NO. 4
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: FR402
FORMER TARGET BUTT
Firing Range
Cost
Unknown
Final Cleanup Action
Mar 2010
Site ID: ID022
IRP-22 IWTP DISCHARGE OUTFALL
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: LF010
IRP-10 LANDFILL NO. 1
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Jun 2006
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Trichloroethylene (TCE) 0.59 ug/L Benzene, methyl- 2.2 ug/L Lead 2.4 ug/L Methylene Chloride 3.8 ug/L Dibutyl Phthalate 10.0 ug/L Zinc 12.0 ug/L Bis(2-Ethylhexyl)Phthalate 16.0 ug/L Manganese and compounds 16.0 ug/L Benzenedicarboxylate 17.0 ug/L Barium 27.0 ug/L Chloroform 30.0 ug/L Molybdenum 40.0 ug/L Benzenol 46.0 ug/L Iron 72.0 ug/L Boron 146.0 ug/L Fluoride 1100.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.6028571429 mg/kg Cadmium and compounds 2.3000000000000003 mg/kg Cobalt 10.0 mg/kg Copper and compounds 11.214285714 mg/kg Nickel (Soluble Salts) 12.2875 mg/kg Chromium 17.8 mg/kg Lead 29.0 mg/kg Vanadium 41.375 mg/kg Zinc 63.375 mg/kg Manganese and compounds 388.0 mg/kg Aluminum 16821.25 mg/kg
Site ID: RW030
BUILDING 752 SURFACE SPILL
Radioactive Waste Area
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Jan 2012
Site ID: DP023
AOC 4, BUILDING 301, SOLIDS COLLECTION PIT AND TRENCH DRAINS
Disposal Pit and Dry Well
Cost
$1.56M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Site ID: XU403
EOD FACILITY
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: AT005
IRP-05 FIRE TRAINING AREA
Fire/Crash Training Area
Cost
$1.56M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: 2,3,7,8-TCDD (Dioxin) 0.0066 mg/kg Anthracene 0.083 mg/kg Benzo(k)Fluoranthene 1.2 mg/kg Methylene Chloride 1.2 mg/kg
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »