Cost So Far
$172M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$62.2M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2077
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
219 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, fences, dig permits. see more » local use ordinances environmental covenants dig permits landfill cover fences signs prohibit activities that would allow/cause the infiltration of water or other fluids implementation of land use restrictions which will restrict construction activities that would impair the integrity of the existing system (i.e., sve and monitoring wells) while it is in place prohibit subsurface construction or disturbance of the surface will not conduct or allow others to disturb or limit access to groundwater or soil remediation do not disturb, move, or damage any groundwater wells or equipment will not engage in activities that will disrupt required remedial investigation will not conduct any soil disturbing activities without a health safety plan will follow all applicable laws and regulations for the handling, transporting, and disposing of any soils containing dieldrin will not disturb or limit access to any wells for groundwater monitoring maintain landfill cover maintain fence implement and maintain long-term ground water monitoring plan provide detailed written description of all proposals for any alterations which may interfere with any remediation activities signage warning against unauthorized vehicular traffic access restrictions to prevent unauthorized access to installed equipment « see less
23 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: OT069
PCE/TCE PLUME
Industrial Discharge
Cost
$3.89M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2079
Site ID: FT082P
PFC - CG070 TCE SOURCE AREA
Fire/Crash Training Area
Cost
$1.01M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
Site ID: XU400
OLD BORROW AREA (OB/OD)
Unexploded Munitions and Ordnance Area
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 1996
This site is under ongoing monitoring until Mar 2019
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Dibenzo(b,e)(1,4)dioxin,2,3,7,8-tetrachloro- 2.5e-07 mg/kg 1,2,3,7,8,9-Hexachlorodibenzeno- p-Dioxin 1.3e-06 mg/kg 1,3-Dinitrobenzene 0.016 mg/kg TNT 0.05 mg/kg 2,6-Dinitrotoluene 0.13 mg/kg Cadmium and compounds 1.4000000000000001 mg/kg Dinitotoluene 1.7 mg/kg Molybdenum 2.2 mg/kg Nickel (Soluble Salts) 11.6 mg/kg Antimony and compounds 19.6 mg/kg Vanadium 24.0 mg/kg Chromium 35.1 mg/kg Trinitroglycerin 87.0 mg/kg Manganese and compounds 393.0 mg/kg Zinc 741.0 mg/kg Barium 746.0 mg/kg Lead 797.0 mg/kg Copper and compounds 1140.0 mg/kg Aluminum 22400.0 mg/kg
Site ID: FT020P
PFC - FIRE TRAINING AREA - ABANDONED
Fire/Crash Training Area
Cost
$1.01M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
Site ID: COW120
724-2 OIL/WATER
Oil/Water Separator
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2016
Site ID: FT082
CG070 TCE SOURCE AREA
Fire/Crash Training Area
Cost
$369K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2016
This site is under ongoing monitoring until Dec 2018
Site ID: COW119
724-1 OIL/WATER
Oil/Water Separator
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
Site ID: SR401
SMALL ARMS RANGE
Small Arms Range
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 1998
This site is under ongoing monitoring until Oct 2046
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Copper and compounds 0.012 mg/kg Dinitotoluene 0.1 mg/kg Aluminum 0.31 mg/kg Manganese and compounds 0.45 mg/kg Zinc 0.48 mg/kg Barium 1.2 mg/kg Trinitroglycerin 5.1000000000000005 mg/kg Antimony and compounds 5.7 mg/kg Lead 597.0 mg/kg
Site ID: SS030
JP4 PLUME
Contaminated Ground Water
Cost
$13M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2017
This site is under ongoing monitoring until Jul 2069
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Ethylbenzene 97.0 mg/kg Benzene 150.0 mg/kg Toluene 1100.0 mg/kg Xylene (Mixed) 3000.0 mg/kg
Site ID: CTU116
724-2 DIESEL
Underground Storage Tanks
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
Site ID: SS084
LFDS FUEL PIT #6 LEAK (AOC MW-32)
Spill Site Area
Cost
$1.18M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
This site is under ongoing monitoring until Oct 2045
Site ID: SS083
OT069 TCE SOURCE AREA NEAR HANGAR 676
Spill Site Area
Cost
$308K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2018
This site is under ongoing monitoring until Dec 2018
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.9 ug/L 1,1-Dichloroethylene 1.1 ug/L Methyl Ethyl Ketone 1.2 ug/L Chloromethane (methyl chloride) 1.9 ug/L Carbon Dichloride 2.0 ug/L Acetone 4.6 ug/L Trichloroethylene (TCE) 28.0 ug/L
Site ID: ST057
FAULTY CONSTRUCTION LEAK; FUEL PIT PIPE LEA
POL (Petroleum/Oil/Lubricants) Lines
Cost
$1.18M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
This site is under ongoing monitoring until Oct 2045
Site ID: CTU124
830 JET FUEL 10-INCH FUEL LINE
Underground Storage Tanks
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
Site ID: ZZ051
OT-51 TEST CELL 799
Spill Site Area
Cost
$422K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2019
Site ID: OT071
PESTICIDE (DIELDRIN) AREA OF CONCERN (AOC071)
Contaminated Ground Water
Cost
$7.81M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
This site is under ongoing monitoring until Feb 2069
Site ID: ST054
BUILDING 708 PIPELINE LEAK
Spill Site Area
Cost
$1.58M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
This site is under ongoing monitoring until Oct 2045
Site ID: ST067
FS LIQUID FUEL DISTRIBUTION SYSTEM
POL (Petroleum/Oil/Lubricants) Lines
Cost
$10.6M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
This site is under ongoing monitoring until Dec 2068
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: DDE 0.0002 ug/L Aldrin 0.0024 ug/L HCH (alpha) 0.003 ug/L HCH (gamma) Lindane 0.0073 ug/L HCH (beta) 0.0093 ug/L Heptachlor 0.02 ug/L Heptachlor Epoxide 0.0235 ug/L Endrin 0.026 ug/L Dieldrin 0.032 ug/L DDT 0.06 ug/L Vinyl Chloride 0.21 ug/L Ether,tert-butyl methyl 0.25 ug/L Carbon Tetrachloride 0.26 ug/L Trichloroethylene (TCE) 0.29 ug/L Bromodichloromethane 0.3 ug/L Benzene, 1,2,4-trichloro- 0.31 ug/L Carbon Dichloride 0.32 ug/L Chloroform 0.34 ug/L Chloromethane (methyl chloride) 0.34 ug/L Chloroethane 0.34 ug/L Bromofume 0.41 ug/L Trichlorofluoromethane 0.46 ug/L 1,1,2,2-Tetrachloroethane 0.52 ug/L 1,1-Dichloroethylene 0.64 ug/L Hexanone 0.73 ug/L 1,1,2-Trichloroethane 0.78 ug/L Ethenylbenzene 0.81 ug/L tert-Butylbenzene 1.1 ug/L 1,2-Dichloroethane (EDC) 1.6 ug/L 1,1,1-Trichloroethane 1.65 ug/L 1,2,3-Trichloropropane 2.1 ug/L 1,1-Dichloroethane 2.7 ug/L Methylene Chloride 3.6 ug/L 1,3-Dichloropropane 6.7 ug/L sec-Butylbenzene 8.5 ug/L Arsenic 12.4 ug/L n-Butylbenzene 15.0 ug/L Vanadium 27.0 ug/L cis-1,2-Dichloroethylene 43.0 ug/L Phosphorus (white) 57.0 ug/L 1-Phenylpropane 69.0 ug/L 1,3,5-Trimethylbenzene 69.0 ug/L Cumene 71.0 ug/L Methyl Ethyl Ketone 77.0 ug/L Naphthalene 86.0 ug/L Iron 122.0 ug/L Boron 125.0 ug/L Zinc 130.0 ug/L Acetone 150.0 ug/L 1,2,4-Trimethylbenzene 190.0 ug/L o-Xylene 220.0 ug/L Barium 265.0 ug/L Benzene, methyl- 640.0 ug/L Ethyl benzene 760.0 ug/L Manganese and compounds 880.0 ug/L Benzene 2700.0 ug/L 1,2-Dichlorobenzene 4530.0 ug/L Benzene, p-dichloro- 7500.0 ug/L Benzene, chloro- 14853.333333 ug/L
Soil: Risk Not Evaluated
Contaminants: DDE 0.0002866667 mg/kg Endrin 0.0007199999999999999 mg/kg Benzene, p-dichloro- 0.0034 mg/kg Benzene, chloro- 0.0036000000000000003 mg/kg Benzene, methyl- 0.0036428571000000002 mg/kg 1,2-Dichlorobenzene 0.0044 mg/kg Chromium 6.5 mg/kg Benzene 10.172733333 mg/kg Zinc 16.7 mg/kg Ethyl benzene 42.635714286 mg/kg Iron 20000.0 mg/kg
Site ID: CG070
NEDA, NORTHEAST DISPOSAL TCE PLUME
Contaminated Ground Water
Cost
$9.01M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2079
Site ID: CTU115
724-1 DIESEL
Underground Storage Tanks
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
Site ID: FT019P
PFC - FIRE TRAINING AREA
Fire/Crash Training Area
Cost
$1.01M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
Site ID: FT019
FIRE TRAINING AND WASTE BURN PIT
Fire/Crash Training Area
Cost
$459K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 0.04 ug/L Dichloropropane 0.06 ug/L Carbon Tetrachloride 0.14 ug/L 1,2-Dichloroethane (EDC) 0.16 ug/L Benzene 0.2 ug/L Benzene, methyl- 0.21 ug/L Chloroform 0.21 ug/L cis-1,2-Dichloroethylene 0.24 ug/L Ether,tert-butyl methyl 0.3 ug/L Cumene 0.33 ug/L Bromoform 0.35 ug/L Methylene Chloride 0.39 ug/L Naphthalene 0.66 ug/L Ethenylbenzene 0.72 ug/L 1-Phenylpropane 0.74 ug/L 1,3,5-Trimethylbenzene 1.5 ug/L Carbon Dichloride 1.5 ug/L Bromodichloromethane 1.6 ug/L 1,4-Diethylene Dioxide 2.0 ug/L 1,2-trans-dichloroethylene 2.2 ug/L Chlorodibromomethane 2.7 ug/L Ethyl benzene 2.9 ug/L Lead 3.0 ug/L o-Xylene 3.4 ug/L 1,2,4-Trimethylbenzene 3.9 ug/L Trichloroethylene (TCE) 5.1 ug/L Manganese and compounds 7.25 ug/L Hexanone 12.0 ug/L Bis(2-Ethylhexyl)Phthalate 14.0 ug/L Copper and compounds 30.0 ug/L Dibutyl Phthalate 31.0 ug/L Acetone 60.0 ug/L Vinyl Chloride 81.0 ug/L Barium 100.0 ug/L Iron 108.4 ug/L Aluminum 300.0 ug/L Zinc 430.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Trichloroethylene (TCE) 0.008 mg/kg Chloroethane 0.01 mg/kg Benzene 0.011 mg/kg Chloroform 0.0155 mg/kg Methylene Bromide 0.02 mg/kg Methylene Chloride 0.02 mg/kg Hexanone 0.039 mg/kg Dibutyl Phthalate 0.068 mg/kg Benzene, p-dichloro- 0.082 mg/kg 1,1-Dichloroethylene 0.09 mg/kg 2,4-Dimethylphenol 0.2 mg/kg Benzene, methyl- 0.24 mg/kg 2-Nitroaniline 0.45 mg/kg Carbon Dichloride 0.48 mg/kg Beryllium and compounds 0.5750000000000001 mg/kg Acetone 0.61 mg/kg Cadmium and compounds 0.63 mg/kg 2,6-Dinitrotoluene 0.64 mg/kg 1,2-Dichlorobenzene 0.6697500000000001 mg/kg Acenaphthene 0.7000000000000001 mg/kg Benzenedicarboxylate 0.79 mg/kg Methyl Ethyl Ketone 1.2 mg/kg Ethyl benzene 1.3 mg/kg Benzenol 1.5 mg/kg Molybdenum 2.1 mg/kg Ethenylbenzene 2.9 mg/kg Silver and compounds 3.8000000000000003 mg/kg 1-Amino-4-Chlorobenzene 3.9 mg/kg Naphthalene 4.5 mg/kg Antimony and compounds 4.9 mg/kg Arsenic 6.2 mg/kg Cobalt 6.65 mg/kg Lead 8.8 mg/kg Nickel (Soluble Salts) 9.3 mg/kg 4-Cresol 9.775 mg/kg 2-Methylnaphthalene 10.0 mg/kg Copper and compounds 12.05 mg/kg Chromium 14.35 mg/kg Zinc 39.525 mg/kg Vanadium 40.45 mg/kg Chrysene 90.0 mg/kg Phosphorus (white) 107.5 mg/kg Barium 125.97500000000001 mg/kg Bis(2-Ethylhexyl)Phthalate 730.0 mg/kg
Site ID: COW125
OWS645
Oil/Water Separator
Cost
$107K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
196 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: COW083
18-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW084
533-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW085
555-2 OIL/WATER MAINT. FACILITY - SOUTH
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW086
559-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW087
568-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW088
652-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW089
652-2 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW091
652-4 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW092
652-5 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW093
668-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW095
676-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW096
676-2 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW097
682-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW099
685-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW100
686-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW101
691-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW102
691-2 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW103
731/734-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW104
772-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW105
780-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW111
1146-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW114
55775(C-6) OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW118
723-S1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Feb 2011
Site ID: COW121
755-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Feb 2011
Site ID: COW122
OWS 552 - 500 GAL
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW123
OWS 552 - 7,000GAL
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: CTU001
12-1 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1992
Site ID: CTU002
12-4 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1992
Site ID: CTU004
12-6 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1992
Site ID: CTU005
253 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU006
256 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU007
280 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU008
285 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU009
299 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU010
310 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU011
497 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU012
499 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU013
501 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU014
550-T8 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU015
550-T7 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU016
550-T6 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU017
555 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU019
559-2 JP-4/WATER
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU021
588 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU022
591 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU023
592 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU024
593 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU025
596-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU027
643-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU028
643-3 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU029
643-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU032
660-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU033
660-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU034
660-4 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU035
660-5 NAPHTHA
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU039
685-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU040
686 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU041
687-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU042
687-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU047
710-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU048
723-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU049
723-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU050
730 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU051
739-2 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 2008
Site ID: CTU052
749-1 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2011
Site ID: CTU053
749-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2011
Site ID: CTU054
749-3 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2011
Site ID: CTU057
756-3 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU058
761-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU059
761-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU060
763-1 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU062
785 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU063
789 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU064
799 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1993
Site ID: CTU065
805 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU067
806-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU068
819 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1993
Site ID: CTU069
821 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU070
822 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU071
832 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU073
849 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU075
1146-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1992
Site ID: CTU076
1155-3 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: DP034
MUNITIONS/BOMBS
Landfill
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Dec 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: LF007
BASE LANDFILL
Landfill
Cost
$1.35M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Dieldrin 0.0005 ug/L DDT 0.0092 ug/L DDE 0.013 ug/L Chloroform 1.0 ug/L Methylene Chloride 1.0 ug/L Acetone 1.3 ug/L Benzene, methyl- 1.9 ug/L Methyl Ethyl Ketone 3.2 ug/L Selenium 5.0 ug/L Silver and compounds 16.0 ug/L Beryllium and compounds 18.0 ug/L Bis(2-Ethylhexyl)Phthalate 19.0 ug/L Arsenic 22.0 ug/L Lead 86.0 ug/L Nickel (Soluble Salts) 140.0 ug/L Cobalt 160.0 ug/L Copper and compounds 270.0 ug/L Chromium 370.0 ug/L Fluoride 400.0 ug/L Vanadium 890.0 ug/L Zinc 1400.0 ug/L Barium 2100.0 ug/L Phosphorus (white) 4900.0 ug/L Manganese and compounds 8700.0 ug/L Aluminum 288000.0 ug/L Iron 346000.0 ug/L
Soil: Risk Not Evaluated
Contaminants: HCH (beta) 0.00165 mg/kg DDE 0.002 mg/kg HCH (alpha) 0.004 mg/kg HCH (gamma) Lindane 0.00468 mg/kg Methylene Chloride 0.0054 mg/kg DDT 0.0075 mg/kg Beryllium and compounds 0.338 mg/kg Bis(2-Ethylhexyl)Phthalate 0.36 mg/kg Benzenol 1.125 mg/kg Arsenic 2.4 mg/kg Cobalt 3.6 mg/kg Nickel (Soluble Salts) 7.5333333333 mg/kg Chromium 9.56 mg/kg Vanadium 23.68 mg/kg Copper and compounds 24.580000000000002 mg/kg Zinc 31.560000000000002 mg/kg Barium 43.68 mg/kg Manganese and compounds 164.6 mg/kg Lead 269.325 mg/kg Aluminum 5700.0 mg/kg Iron 8832.0 mg/kg
Site ID: CTU077
1155-4 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU078
1188 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2001
Site ID: CTU079
1200 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU080
1209 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU081
32000-3 WASTE JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1999
Site ID: DP001
PAINT DRUM BURIAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Lead 7.5 mg/kg
Site ID: DP002
PESTICIDE AND PAINT BURIAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: DP046
F-111 AIRCRAFT BURIAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: DP060
SEWERAGE SLUDGE DISPOSAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: FT020
ABANDONED FIRE TRAINING AREA
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Jul 2001
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.0078 mg/kg Beryllium and compounds 0.3133333333 mg/kg Benzenol 0.84 mg/kg Cobalt 2.775 mg/kg Arsenic 4.45 mg/kg Nickel (Soluble Salts) 6.1000000000000005 mg/kg Chromium 8.875 mg/kg Copper and compounds 17.225 mg/kg Vanadium 22.1 mg/kg Lead 24.900000000000002 mg/kg Barium 31.85 mg/kg Zinc 37.525 mg/kg Manganese and compounds 122.47500000000001 mg/kg Aluminum 6555.0 mg/kg Iron 9572.5 mg/kg
Site ID: LF011
LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Methylene Chloride 0.95 ug/L Acetone 1.2 ug/L Benzene, methyl- 1.9 ug/L Beryllium and compounds 2.1 ug/L Silver and compounds 3.0 ug/L Arsenic 8.4 ug/L Lead 16.0 ug/L Cobalt 29.0 ug/L Copper and compounds 47.0 ug/L Nickel (Soluble Salts) 55.0 ug/L Chromium 63.0 ug/L Vanadium 140.0 ug/L Zinc 250.0 ug/L Barium 280.0 ug/L Fluoride 300.0 ug/L Phosphorus (white) 690.0 ug/L Manganese and compounds 1500.0 ug/L Aluminum 37200.0 ug/L Iron 51300.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.0293333333 mg/kg Beryllium and compounds 0.405 mg/kg Benzenol 2.2 mg/kg Diethyl Phthalate 2.9 mg/kg Molybdenum 5.4 mg/kg Nickel (Soluble Salts) 6.6000000000000005 mg/kg
Site ID: DP010
LANDFILL
Landfill
Cost
$107K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Jun 2018
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: OT074
OT-74, ORIGINAL SKEET RANGE
Firing Range
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2015
Site ID: OT081
RAILROAD FUELING SYSTEM (AOC081)
Underground Storage Tanks
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2005
This site is under ongoing monitoring until Mar 2017
Site ID: LF013
ORIGINAL BASE LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.22 ug/L o-Xylene 0.3 ug/L Methylene Chloride 0.32 ug/L 1,1,2-Trichloroethane 0.325 ug/L Dichlorodifluoromethane 0.33 ug/L Ethyl benzene 0.38 ug/L 1,2-Dichloroethane (EDC) 0.38 ug/L Carbon Dichloride 0.4 ug/L 1,2-trans-dichloroethylene 0.42 ug/L 1,2,4-Trimethylbenzene 0.43 ug/L Bromodichloromethane 0.46 ug/L Benzene 0.47 ug/L Naphthalene 0.68 ug/L Cumene 0.7 ug/L cis-1,2-Dichloroethylene 0.74 ug/L 1,4-Diethylene Dioxide 0.97 ug/L 1-Phenylpropane 1.1 ug/L 1,3,5-Trimethylbenzene 2.5 ug/L Arsenic 8.4 ug/L Vanadium 10.0 ug/L Lead 12.0 ug/L Benzene, methyl- 13.6 ug/L Cobalt 15.0 ug/L Trichloroethylene (TCE) 21.0 ug/L Copper and compounds 31.0 ug/L Chromium 52.0 ug/L Barium 53.0 ug/L Zinc 120.0 ug/L Iron 250.0 ug/L Fluoride 260.0 ug/L Phosphorus (white) 500.0 ug/L Manganese and compounds 830.0 ug/L Aluminum 880.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.7566666666999999 mg/kg Benzenol 1.6333333333000002 mg/kg Benzoic Acid 2.7 mg/kg Lead 2.7 mg/kg Cobalt 3.65 mg/kg Nickel (Soluble Salts) 9.7666666667 mg/kg Copper and compounds 33.175 mg/kg
Site ID: LF035
LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Oct 2003
Site ID: LF036
CONSTRUCTION DEBRIS/BORROW PIT
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Acetone 2.5 ug/L Methylene Chloride 5.7 ug/L Lead 6.6 ug/L Arsenic 6.9 ug/L Chromium 26.0 ug/L Vanadium 73.0 ug/L Barium 140.0 ug/L Zinc 170.0 ug/L Fluoride 410.0 ug/L Phosphorus (white) 410.0 ug/L Manganese and compounds 460.0 ug/L Aluminum 12000.0 ug/L Iron 17600.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Acetone 0.017 mg/kg Beryllium and compounds 0.36 mg/kg Cadmium and compounds 0.81 mg/kg Selenium 1.8 mg/kg Benzenol 2.05 mg/kg Cobalt 2.5500000000000003 mg/kg Nickel (Soluble Salts) 5.1000000000000005 mg/kg Copper and compounds 20.75 mg/kg
Site ID: LF037
LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: LF038
TRASH DISPOSAL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: LF039
CONSTRUCTION DEBRIS/TRASH
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 0.06 ug/L DDE 0.08 ug/L HCH (alpha) 0.082 ug/L HCH (gamma) Lindane 0.14 ug/L Ethyl benzene 0.2 ug/L Chloromethane (methyl chloride) 0.59 ug/L Methylene Chloride 0.78 ug/L Chloroform 0.96 ug/L DDD 1.5 ug/L Acetone 2.0 ug/L Beryllium and compounds 2.2 ug/L DDT 5.4 ug/L Arsenic 13.0 ug/L Lead 31.0 ug/L Cobalt 34.0 ug/L Nickel (Soluble Salts) 43.0 ug/L Trichloroethylene (TCE) 60.0 ug/L Chromium 81.0 ug/L Copper and compounds 84.0 ug/L Vanadium 190.0 ug/L Fluoride 230.0 ug/L Barium 560.0 ug/L Zinc 740.0 ug/L Phosphorus (white) 1400.0 ug/L Manganese and compounds 1900.0 ug/L Aluminum 60800.0 ug/L Iron 77300.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.0088 mg/kg Benzene, methyl- 0.015 mg/kg Bis(2-Ethylhexyl)Phthalate 0.33 mg/kg Beryllium and compounds 0.43 mg/kg Selenium 0.84 mg/kg Silver and compounds 1.6 mg/kg Benzenol 2.0 mg/kg Nickel (Soluble Salts) 7.8 mg/kg
Site ID: LF043
RUBBLE DISPOSAL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: LF045
CONSTRUCTION DEMOLITION
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: OT062
RINSE WATER DISPOSAL PIT
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: OT065
OUTLYING REVETMENTS
Contaminated Soil Piles
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: OT066
NONPOINT-SOURCE RESIDENTIAL HOUSING
Surface Runoff
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: OT075
OT-75, INDOOR SHOOTING RANGE (BUILDING 615)
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: OT076
OT-76, DOZER SCAR SITE
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: OT077
OT-77, DISTURBED AREA SITE
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: OT078
OT-78, EXPLOSIVE ORDNANCE DISPOSAL RANGE
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: OT080
BUILDING 513, CHLORDANE (AOC080)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SD018
FUEL AND OIL DISPOSAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Acetone 2.4 ug/L Methylene Chloride 5.7 ug/L Cobalt 13.0 ug/L Lead 15.0 ug/L Arsenic 17.0 ug/L Chromium 40.0 ug/L Copper and compounds 41.0 ug/L Vanadium 140.0 ug/L Zinc 150.0 ug/L Barium 300.0 ug/L Fluoride 810.0 ug/L Manganese and compounds 830.0 ug/L Phosphorus (white) 1200.0 ug/L Aluminum 32700.0 ug/L Iron 37500.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.3125 mg/kg Selenium 0.67 mg/kg Cadmium and compounds 0.89 mg/kg Molybdenum 2.2 mg/kg Lead 4.5 mg/kg Cobalt 5.4333333333 mg/kg Nickel (Soluble Salts) 10.625 mg/kg Chromium 15.0 mg/kg Copper and compounds 20.533333332999998 mg/kg Zinc 36.0 mg/kg
Site ID: SD025
INDUSTRIAL OUTFALL AND PIPELINE
Waste Lines
Cost
Unknown
Final Cleanup Action
Mar 1994
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,2-Dichloroethane (EDC) 0.05 ug/L 1,1,2,2-Tetrachloroethane 0.12 ug/L Carbon Tetrachloride 0.14 ug/L 1,1,1-Trichloroethane 0.17 ug/L Chlorodibromomethane 0.19 ug/L Benzene, methyl- 0.2 ug/L o-Xylene 0.21 ug/L Bromodichloromethane 0.24 ug/L Bromoform 0.26 ug/L Cumene 0.26 ug/L Chloromethane (methyl chloride) 0.28 ug/L n-Butylbenzene 0.29 ug/L Ethyl benzene 0.34 ug/L 1,3,5-Trimethylbenzene 0.34 ug/L Benzene 0.38 ug/L Ether,tert-butyl methyl 0.43 ug/L Carbon Dichloride 0.48 ug/L 1,2,4-Trimethylbenzene 0.51 ug/L 1,1-Dichloroethane 0.52 ug/L Methylene Chloride 0.54 ug/L 1,1-Dichloroethylene 0.56 ug/L 1-Phenylpropane 0.57 ug/L 1,4-Diethylene Dioxide 0.62 ug/L sec-Butylbenzene 0.65 ug/L Chloroform 0.96 ug/L Naphthalene 0.96 ug/L Hexanone 1.1 ug/L Chloroethane 1.1 ug/L 1,2-trans-dichloroethylene 1.2 ug/L cis-1,2-Dichloroethylene 1.5 ug/L Arsenic 5.5 ug/L Bis(2-Ethylhexyl)Phthalate 9.6 ug/L Chromium 10.0 ug/L Copper and compounds 10.0 ug/L Manganese and compounds 26.4 ug/L Zinc 40.0 ug/L Lead 66.0 ug/L Vinyl Chloride 81.0 ug/L Trichloroethylene (TCE) 83.0 ug/L Aluminum 300.0 ug/L Iron 1190.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Chloroform 0.04 mg/kg 1,1,1-Trichloroethane 0.06 mg/kg Benzenedicarboxylate 0.09 mg/kg Dibutyl Phthalate 0.14 mg/kg Benzene, hexachloro- 0.46 mg/kg Benzene 0.49 mg/kg Bis(2-Ethylhexyl)Phthalate 0.55 mg/kg N-Nitrosodiphenylamine 0.65 mg/kg Acenaphthene 1.2 mg/kg Dibenz[ah]anthracene 1.5 mg/kg Diethyl Phthalate 1.7 mg/kg Butyl Benzyl Phthalate 2.0 mg/kg Anthracene 3.0 mg/kg Lead 4.7 mg/kg Benzene, methyl- 4.7375 mg/kg Indeno(1,2,3-cd)Pyrene 6.0 mg/kg Chromium 8.1 mg/kg Ethyl benzene 10.675 mg/kg 8,9-Benzofluoranthene 12.0 mg/kg Benzo(a)Pyrene 15.0 mg/kg Benz(a)Anthracene 17.0 mg/kg Naphthalene 19.0 mg/kg Zinc 20.516666667000003 mg/kg 2,3-Benzofluoranthene 22.0 mg/kg Chrysene 25.0 mg/kg Fluorene 30.0 mg/kg Benzo(def)Phenanthrene 33.0 mg/kg 1,2-Benzacenaphthene 46.0 mg/kg
Site ID: SD027
ABANDONED DRAIN PIT/DRY WELL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, methyl- 3.3 ug/L Zinc 12.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Benzene, methyl- 0.008 mg/kg Ethyl benzene 0.013000000000000001 mg/kg Methyl Ethyl Ketone 0.03 mg/kg Acetone 0.047 mg/kg Naphthalene 0.74 mg/kg 2-Methylnaphthalene 1.3 mg/kg Nickel (Soluble Salts) 6.0 mg/kg Lead 20.3 mg/kg Zinc 45.2 mg/kg Chromium 90.8 mg/kg
Site ID: SD028
ABANDONED DRAIN PIT/DRY WELL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, methyl- 3.3 ug/L Zinc 12.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Lead 3.85 mg/kg Chromium 8.0333333333 mg/kg
Site ID: SS052
CREOSOTE SPILL AREA
Landfill
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Jun 2017
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: SS058
BUILDING 690 GASOLINE SPILL
Spill Site Area
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2014
Site ID: SD041
RIPRAP FOR INDUSTRIAL DRAIN DISCHARGE
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SD042
RIPRAP FOR OFF-BASE WATER SUPPLY
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SR404
SMALL ARMS FIRING RANGE (FAC614/ 615) (INDOOR)
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SS021
TIP TANK DRAINAGE AREA
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SS023
SALVAGE YARD/HAZARDOUS WASTE STORAGE AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methyl Ethyl Ketone 0.015 mg/kg Acetone 0.028 mg/kg Beryllium and compounds 0.81 mg/kg Cadmium and compounds 1.3733333333000002 mg/kg Arsenic 4.6000000000000005 mg/kg Cobalt 9.4 mg/kg Nickel (Soluble Salts) 19.2 mg/kg Chromium 21.8 mg/kg Copper and compounds 22.400000000000002 mg/kg Lead 33.8 mg/kg Vanadium 38.800000000000004 mg/kg Zinc 41.6 mg/kg Barium 99.60000000000001 mg/kg
Site ID: SS024
BUILDING 580 UNSERVICED TRANSFORMER STORAGE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SS055
FUEL SPILL COLLECTION POINT
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SS059
BUILDING 819
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: SS079
BUILDING 749 AGE GAS STATION UNDERGROUND STORAGE TANKSS (AOC079)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2011
Site ID: ST031
ABANDONED UNDERGROUND STORAGE TANKS (APPROX
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: ST056
BUILDING 690 FUEL LEAK
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: WP017
POL LEACH FIELD
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Aug 2004
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Carbon Dichloride 0.008 mg/kg Methylene Chloride 0.022 mg/kg Ethenylbenzene 3.3000000000000003 mg/kg Lead 4.6000000000000005 mg/kg Benzene 5.2 mg/kg Nickel (Soluble Salts) 10.5 mg/kg Chromium 34.1 mg/kg Zinc 37.6 mg/kg Ethyl benzene 46.333333333000006 mg/kg Hexanone 105.0 mg/kg Benzene, methyl- 140.0 mg/kg Phosphorus (white) 380.0 mg/kg Iron 11500.0 mg/kg
Site ID: WP026
STP PERCOLATION PONDS
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Mar 1994
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.05 ug/L Benzene, chloro- 0.1 ug/L 1,1,1-Trichloroethane 0.1 ug/L Benzene 0.15 ug/L Trichloroethylene (TCE) 0.2 ug/L 1,1-Dichloroethane 0.35 ug/L Carbon Dichloride 0.5 ug/L Methylene Chloride 0.5 ug/L 1,2-Dichlorobenzene 1.2 ug/L Silver and compounds 3.0 ug/L Benzene, methyl- 4.2 ug/L Beryllium and compounds 5.0 ug/L Lead 7.0 ug/L Tetrahydrofuran 11.0 ug/L Methyl Ethyl Ketone 11.0 ug/L Chromium 17.0 ug/L Nickel (Soluble Salts) 43.5 ug/L Ethyl benzene 44.0 ug/L Copper and compounds 55.5 ug/L Zinc 139.0 ug/L Iron 9800.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Benzenedicarboxylate 0.059000000000000004 mg/kg Diethyl Phthalate 0.07 mg/kg 1,2-Benzacenaphthene 0.115 mg/kg Benzo(def)Phenanthrene 0.135 mg/kg Bis(2-Ethylhexyl)Phthalate 0.145 mg/kg Dibutyl Phthalate 0.195 mg/kg Chromium 5.295 mg/kg Lead 18.91 mg/kg Zinc 31.833333333 mg/kg
Site ID: WP029
SLUDGE DRYING BEDS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: WP032
LEACH FIELD
Leach Field
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.0075 mg/kg Beryllium and compounds 0.27 mg/kg Benzo(def)Phenanthrene 0.35000000000000003 mg/kg 2,3-Benzofluoranthene 0.55 mg/kg Arsenic 1.0657142857 mg/kg Cobalt 1.7444444444 mg/kg Chromium 5.2 mg/kg Nickel (Soluble Salts) 6.9 mg/kg Lead 15.6 mg/kg Vanadium 18.777777778 mg/kg Copper and compounds 26.488888889000002 mg/kg Barium 27.555555556 mg/kg Zinc 38.666666667 mg/kg Manganese and compounds 89.644444444 mg/kg Aluminum 4127.7777778 mg/kg Iron 8301.111111100001 mg/kg
Site ID: WP063
SEWAGE SLUDGE DISPOSAL AREAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: WP068
PAINT DISPOSAL PIT
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: XU402
40MM GRENADE RANGE
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jul 2007
Site ID: XU403
EOD PROFICIENCY RANGE
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: ZZ048
OT-48 SALVAGE YARD
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: WP040
CHEMICAL TOILET SLUDGE
Landfill
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Jun 2017
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: ZZ050
OT-50 EARTH EMBANKMENT
Contaminated Soil Piles
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: COW090
652-3 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW113
768-1(C-3) OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Sep 2010
Site ID: CTU003
12-5 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1992
Site ID: CTU020
559-3 JP-4/WATER
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU031
660-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU066
806-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU074
999 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: DP047
AIRCRAFT PARTS BURIAL
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: RW009
RADIOACTIVE DISPOSAL
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Dec 2013
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: LF044
MISC. TRASH/RUBBLE DISPOSAL
Landfill
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Dec 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.0050999999999999995 mg/kg Beryllium and compounds 0.6 mg/kg Arsenic 2.1 mg/kg Nickel (Soluble Salts) 4.9 mg/kg Antimony and compounds 9.1 mg/kg Chromium III 9.4 mg/kg Lead 12.1 mg/kg Copper and compounds 16.0 mg/kg Vanadium 40.1 mg/kg Barium 55.2 mg/kg Manganese and compounds 322.0 mg/kg Aluminum 14700.0 mg/kg Iron 18000.0 mg/kg
Site ID: OT061
SHOP WASTE DISPOSAL AREA
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: CTU036
678-1 UNKNOWN
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2001
Site ID: CTU046
707-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 2008
Site ID: CTU055
756-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: OT073
OT-73, SECOND SKEET RANGE
Firing Range
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2015
Site ID: LF008
TETRAETHYL LEAD DISPOSAI
Landfill
Cost
$1.06M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.00545 mg/kg Beryllium and compounds 0.3 mg/kg Arsenic 1.8533333333000002 mg/kg Silver and compounds 3.2 mg/kg Molybdenum 4.6000000000000005 mg/kg Cobalt 5.1666666667 mg/kg Cadmium and compounds 6.5 mg/kg Chromium 18.433333333 mg/kg Vanadium 22.966666667000002 mg/kg Barium 59.633333333 mg/kg Nickel (Soluble Salts) 76.43333333300001 mg/kg Manganese and compounds 198.33333333 mg/kg Zinc 223.63333333 mg/kg Copper and compounds 240.66666667 mg/kg Lead 300.0 mg/kg Aluminum 8246.6666667 mg/kg Iron 16933.333333000002 mg/kg
Site ID: COW110
868-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW106
785-S1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW108
832-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: CTU026
596-2 MOGAS
Duplicate Site Within Same Program
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU037
678-2 MOGAS
Site Never Existed
Cost
Unknown
Final Cleanup Action
Mar 2001
Site ID: CTU038
678-3 DIESEL
Site Never Existed
Cost
Unknown
Final Cleanup Action
Mar 2001
Site ID: CTU045
701 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 2008
Site ID: DP015
MUNITIONS/OIL
Landfill
Cost
$1.06M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Radium 226 0.0027 mg/kg Thorium 228 0.0037 mg/kg DDE 0.01 mg/kg Toluene 0.013000000000000001 mg/kg Methylene Chloride 0.029 mg/kg Chromium VI and compounds 0.2 mg/kg Mercury (Inorganic) 0.21 mg/kg Thallium 0.51 mg/kg Beryllium and compounds 1.3 mg/kg Selenium 1.9000000000000001 mg/kg Phenol 2.2 mg/kg Molybdenum 5.5 mg/kg Cadmium and compounds 6.5 mg/kg Antimony and compounds 10.1 mg/kg Arsenic 19.0 mg/kg Chromium III 37.1 mg/kg Vanadium 77.10000000000001 mg/kg Nickel (Soluble Salts) 205.0 mg/kg Lead 300.0 mg/kg Barium 468.0 mg/kg Manganese and compounds 662.0 mg/kg Copper and compounds 662.0 mg/kg Aluminum 27600.0 mg/kg Iron 132000.0 mg/kg
Site ID: DP033
MUNITIONS
Landfill
Cost
$71K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Dec 2016
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Methylene Chloride 0.65 ug/L Acetone 1.8 ug/L Bis(2-Ethylhexyl)Phthalate 2.3 ug/L Beryllium and compounds 2.4 ug/L Arsenic 11.0 ug/L Lead 18.0 ug/L Cobalt 34.0 ug/L Copper and compounds 50.0 ug/L Nickel (Soluble Salts) 53.0 ug/L Chromium 85.0 ug/L Vanadium 220.0 ug/L Zinc 250.0 ug/L Barium 300.0 ug/L Fluoride 420.0 ug/L Manganese and compounds 1700.0 ug/L Phosphorus (white) 2100.0 ug/L Aluminum 50000.0 ug/L Iron 78300.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.6933333333 mg/kg Benzenol 1.2333333333 mg/kg Selenium 1.9000000000000001 mg/kg Nickel (Soluble Salts) 7.8 mg/kg
Site ID: OT072
OT-72, CURRENT SKEET RANGE
Firing Range
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2015
Site ID: SS053
JET FUEL SPILL
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.05 ug/L Benzene, chloro- 0.1 ug/L 1,1,1-Trichloroethane 0.1 ug/L Trichloroethylene (TCE) 0.2 ug/L 1,1-Dichloroethylene 0.22 ug/L 1,2,4-Trimethylbenzene 0.245 ug/L Carbon Dichloride 0.28 ug/L Benzene 0.305 ug/L 1,1-Dichloroethane 0.35 ug/L 1,3,5-Trimethylbenzene 0.41 ug/L Methylene Chloride 0.5 ug/L o-Xylene 0.505 ug/L Naphthalene 1.0 ug/L 1,2-Dichlorobenzene 1.2 ug/L Chloromethane (methyl chloride) 1.4 ug/L Silver and compounds 3.0 ug/L Beryllium and compounds 5.0 ug/L Lead 7.0 ug/L Tetrahydrofuran 11.0 ug/L Methyl Ethyl Ketone 11.0 ug/L Chromium 17.0 ug/L Nickel (Soluble Salts) 43.5 ug/L Copper and compounds 55.5 ug/L Zinc 139.0 ug/L Ethyl benzene 400.0 ug/L Benzene, methyl- 4400.0 ug/L Iron 23500.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Ethyl benzene 0.0024 mg/kg Acetone 0.014199999999999999 mg/kg Benzene 0.023100000000000002 mg/kg Benzene, methyl- 0.033 mg/kg Naphthalene 3.8000000000000003 mg/kg 2-Methylnaphthalene 5.6333333333 mg/kg Phosphorus (white) 651.45454545 mg/kg
Site ID: SR405
ORIGINAL SKEET RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Mar 2008
Site ID: SR406
SECOND SKEET RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Mar 2008
Site ID: SR407
FORMER SKEET SHOOTING RANGE (FACILITIES 576-580)
Small Arms Range
Cost
Unknown
Final Cleanup Action
Apr 2008
Site ID: WP016
POL LEACH FIELD
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: DP004
PESTICIDE AND OIL BURIAL
Disposal Pit and Dry Well
Cost
$1.36M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: DDE 0.24 mg/kg DDT 0.52 mg/kg Arsenic 2.8000000000000003 mg/kg Lead 3.5700000000000003 mg/kg Polychlorinated Biphenyls 4.4 mg/kg Chromium III 12.8 mg/kg Nickel (Soluble Salts) 15.5 mg/kg Mercury (Inorganic) 16.0 mg/kg Copper and compounds 24.2 mg/kg Vanadium 24.2 mg/kg Beryllium and compounds 26.0 mg/kg Barium 94.2 mg/kg Manganese and compounds 217.0 mg/kg Aluminum 9460.0 mg/kg Iron 12200.0 mg/kg
Site ID: DP003
ACID AND OIL BURIAL
Disposal Pit and Dry Well
Cost
$1.36M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.03 mg/kg Arsenic 2.1 mg/kg Benzo(a)Anthracene 5.0 mg/kg Chrysene 5.5 mg/kg Benzo(b)Fluoranthene 5.8 mg/kg Benzo(a)Pyrene 5.8 mg/kg Methylene Chloride 6.0 mg/kg Phenanthrene 6.3 mg/kg Fluoranthene 8.1 mg/kg Nickel (Soluble Salts) 8.9 mg/kg Pyrene 9.5 mg/kg Lead 16.8 mg/kg Vanadium 26.8 mg/kg Copper and compounds 34.5 mg/kg Chromium III 45.6 mg/kg Zinc 45.6 mg/kg Barium 62.6 mg/kg Manganese and compounds 195.0 mg/kg Aluminum 8790.0 mg/kg Iron 15800.0 mg/kg
Site ID: COW107
789-1 OIL/WATER
Oil/Water Separator
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1995
This site is under ongoing monitoring until Dec 2015
Site ID: COW112
555-1(C-19) OIL/WATER MAINT. FACILITY - NORTH
Oil/Water Separator
Cost
$107K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 1995
This site is under ongoing monitoring until Dec 2017
Site ID: LF012
LANDFILL STREET SWEEPINGS DISPOSAL SITE
Landfill
Cost
$1.39M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Dieldrin 0.0004 ug/L DDE 0.00135 ug/L DDD 0.0016 ug/L DDT 0.0067 ug/L Chloromethane (methyl chloride) 0.23 ug/L Trichloroethylene (TCE) 0.31 ug/L Chloroform 0.53 ug/L Methylene Chloride 0.54 ug/L Carbon Dichloride 0.63 ug/L Beryllium and compounds 4.8 ug/L Arsenic 6.1 ug/L Cobalt 13.0 ug/L Bis(2-Ethylhexyl)Phthalate 15.0 ug/L Lead 21.3 ug/L Molybdenum 28.0 ug/L Copper and compounds 45.0 ug/L Vanadium 52.5 ug/L Nickel (Soluble Salts) 60.0 ug/L Barium 315.0 ug/L Fluoride 390.0 ug/L Chromium 455.0 ug/L Manganese and compounds 505.0 ug/L Phosphorus (white) 530.0 ug/L Zinc 740.0 ug/L Aluminum 17900.0 ug/L Iron 20100.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.41500000000000004 mg/kg Benzenol 1.41 mg/kg Arsenic 1.5075 mg/kg Bis(2-Ethylhexyl)Phthalate 3.0 mg/kg Cobalt 4.9 mg/kg Lead 5.2 mg/kg Chromium 8.825000000000001 mg/kg Molybdenum 9.0 mg/kg Nickel (Soluble Salts) 11.700000000000001 mg/kg Copper and compounds 24.6 mg/kg Vanadium 34.525 mg/kg Zinc 39.2 mg/kg Barium 73.0 mg/kg Manganese and compounds 462.75 mg/kg Aluminum 9082.5 mg/kg Iron 13627.5 mg/kg
Site ID: LF014
BASE LANDFILL
Landfill
Cost
$1.51M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1-Dichloroethane 0.22 ug/L Chloromethane (methyl chloride) 0.32 ug/L Chloroform 0.39 ug/L Bromodichloromethane 0.49 ug/L Carbon Dichloride 0.68 ug/L Methylene Chloride 0.72 ug/L Dichlorodifluoromethane 0.76 ug/L Benzene 0.81 ug/L Naphthalene 0.89 ug/L Ethyl benzene 1.1 ug/L tert-Butylbenzene 1.1 ug/L Acetone 1.3 ug/L Cumene 1.3 ug/L sec-Butylbenzene 1.4 ug/L 1-Phenylpropane 1.5 ug/L Trichloroethylene (TCE) 1.6 ug/L 1,4-Diethylene Dioxide 1.7 ug/L Beryllium and compounds 2.5 ug/L 1,3,5-Trimethylbenzene 3.0 ug/L 1,2,4-Trimethylbenzene 5.6 ug/L Arsenic 6.1 ug/L Silver and compounds 7.0 ug/L o-Xylene 8.25 ug/L Cobalt 10.0 ug/L Bis(2-Ethylhexyl)Phthalate 11.0 ug/L Lead 12.0 ug/L Benzene, methyl- 17.05 ug/L Chromium 22.0 ug/L Copper and compounds 31.0 ug/L Nickel (Soluble Salts) 42.0 ug/L Manganese and compounds 47.2 ug/L Iron 49.0 ug/L Vanadium 51.0 ug/L Barium 190.0 ug/L Phosphorus (white) 310.0 ug/L Zinc 360.0 ug/L Fluoride 430.0 ug/L Aluminum 18900.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Benzenol 0.36 mg/kg Selenium 0.55 mg/kg
Site ID: COW094
670-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: CTU018
559-1 JP-4/WATER
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU044
700 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: CTU061
763-2 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: ZZ022
OT-22 GOLF COURSE
Surface Runoff
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: ZZ049
OT-49 AIRCRAFT CRASH RESIDUE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: COW098
683-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW109
867-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Site ID: COW126
BUILDING 722/756 OWS
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: CTU030
653 OIL/DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CTU117
724-3 MOGAS
Underground Storage Tanks
Cost
$39K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2011
This site is under ongoing monitoring until Mar 2016
Site ID: CTU043
694 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: CTU056
756-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: CTU072
841 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: OT064
TRANSFORMER SITES
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1998
Site ID: COW082
14-1 OIL/WATER
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Oct 2009
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »