Cost So Far
$223M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$115M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2059
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
126 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, dig permits, signs. see more » environmental covenants dig permits landfill cap fences signs the grantee covenants either to: (a) design and construct any structure intended for human occupancy in a manner that would mitigate unacceptable risk; or (b) evaluate the potential for risk prior to the erection of structure with regard to svi. the grantee will comply with the provisions of any health or safety plan in effect or any hazardous substance remediation or response agreement with environmental regulatory authorities during the course of any response or remedial action. grantee covenants that it will not engage in or allow others to engage in activities that interfere with the effectiveness of any component of the remedial systems used in the remediation of soils on the property or limit access to these systems. grantee covenants that it will not conduct any surface activities that introduce or allow infiltration of water/other fluids into the groundwater, without the written approval of the air force, usepa, and the state. grantee covenants that it will not damage/disturb/tamper with, or allow others to damage/disturb/tamper with, any component of the remedial system. grantee covenants and agrees for itself and its successors and assigns that it will not damage/disturb/tamper with or allow others to damage/disturb/tamper with any component of the remedial systems. prior to any construction on the property within 1,000· feet of the and fill, blueprints and/or other documentation demonstrating compliance with the following requirements of title 27, c.c.r., section 21190(g), shall be submitted for approval. surface application of water (i.e., irrigation) that might result in ponding on the cap or erosion sufficient to degrade the cap. grantee will not disturb equipment or facilities associated with monitoring and maintenance of the landfills or limit access. grantee covenants and agrees for itself and its successors and assigns that it will obtain approval for any change in land use or site improvements within 1,000 feet of sites lf-03 or lf-04. grantee covenants not to conduct any surface activities that introduce or allow infiltration of water/other fluids into the groundwater without the written approval of the air force, usepa), and the state. grantee covenants and agrees for itself and its successors and assigns that it will obtain approval for any change in land use or site improvements within 1,000 feet of wp-07. « see less
11 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: ST037
BUILDING 3389, FIVE ABANDOED UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1999
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Ethyl benzene 0.031 ug/L n-Butylbenzene 0.052 ug/L Chloroform 0.2 ug/L Trichloroethylene (TCE) 0.2 ug/L Carbon Tetrachloride 2.0 ug/L Carbon Dichloride 4.8 ug/L
Site ID: OT023
SANITARY SEWER SYSTEM (EAST-WEST LINE)
Waste Lines
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2000
This site is under ongoing monitoring until Oct 2046
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Ethyl benzene 0.045 ug/L Benzene 0.054 ug/L 1,2-Dichlorobenzene 0.059 ug/L Benzene, p-dichloro- 0.066 ug/L 1,3-Dichlorobenzene 0.069 ug/L 1-Phenylpropane 0.072 ug/L sec-Butylbenzene 0.079 ug/L Chloroform 0.1 ug/L Chloromethane (methyl chloride) 0.1 ug/L Carbon Dichloride 0.11 ug/L Naphthalene 0.11 ug/L Benzene, methyl- 0.13 ug/L n-Butylbenzene 0.17 ug/L Vinyl Chloride 0.19 ug/L Carbon Tetrachloride 0.3 ug/L Bromomethane 0.4 ug/L Methylene Chloride 0.68 ug/L cis-1,2-Dichloroethylene 1.1 ug/L Trichloroethylene (TCE) 2.4 ug/L
Site ID: ST039
HAZARDOUS WASTE CENTRAL STORAGE FACILITY
Underground Storage Tanks
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1999
This site is under ongoing monitoring until Sep 2045
Site ID: LF004
NORTHEAST PERIMETER LANDFILL NO. 2
Landfill
Cost
$6.65M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Sep 2067
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1-Dichloroethane 0.08 ug/L Chloroform 0.1 ug/L Vinyl Chloride 0.1 ug/L Dichloropropane 0.1 ug/L 1,2-Dichloroethane (EDC) 0.2 ug/L Benzene, chloro- 0.2 ug/L Chloromethane (methyl chloride) 0.2 ug/L Beryllium and compounds 0.34 ug/L Selenium 0.72 ug/L Silver and compounds 0.87 ug/L Ethyl benzene 1.1 ug/L Arsenic 1.2 ug/L Benzene 1.3 ug/L Methylene Chloride 1.7 ug/L Benzene, methyl- 1.8 ug/L 1,2-trans-dichloroethylene 1.9 ug/L Lead 1.9 ug/L Antimony and compounds 2.085 ug/L Vanadium 2.3 ug/L Copper and compounds 3.0 ug/L 1,1,1-Trichloroethane 3.3 ug/L 1,1,2,2-Tetrachloroethane 3.3 ug/L Trichloroethylene (TCE) 7.6 ug/L Cobalt 10.0 ug/L Molybdenum 22.5 ug/L Zinc 23.0 ug/L Chromium 31.0 ug/L Carbon Dichloride 32.0 ug/L cis-1,2-Dichloroethylene 37.5 ug/L Barium 54.0 ug/L Fluoride 110.0 ug/L Aluminum 112.0 ug/L Nickel (Soluble Salts) 240.0 ug/L Manganese and compounds 250.0 ug/L Iron 1200.0 ug/L
Site ID: SD059
OWS 4251
Oil/Water Separator
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2000
This site is under ongoing monitoring until Sep 2048
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.1 ug/L Carbon Tetrachloride 0.2 ug/L Chloromethane (methyl chloride) 0.2 ug/L Methylene Chloride 0.2 ug/L cis-1,2-Dichloroethylene 0.3 ug/L Trichloroethylene (TCE) 0.4 ug/L Benzene, methyl- 1.7 ug/L Carbon Dichloride 4.8 ug/L
Site ID: SS054
HAZARDOUS WASTE ACCUMULATION POINT 4348
Storage Area
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1999
This site is under ongoing monitoring until Sep 2045
Site ID: WP012
AC&W SITE NPL-12
Disposal Pit and Dry Well
Cost
$1.33M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 1997
This site is under ongoing monitoring until Sep 2021
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.2 ug/L Chloromethane (methyl chloride) 0.2 ug/L 1,2-trans-dichloroethylene 0.43 ug/L Carbon Dichloride 0.57 ug/L cis-1,2-Dichloroethylene 0.6 ug/L Manganese and compounds 0.92 ug/L Ethyl benzene 1.6 ug/L Benzene, p-dichloro- 1.6 ug/L Benzene, methyl- 2.0 ug/L Copper and compounds 2.1 ug/L 1,1,1-Trichloroethane 4.5 ug/L Trichloroethylene (TCE) 6.1 ug/L Zinc 9.7 ug/L Methylene Chloride 17.0 ug/L Benzene 22.0 ug/L Lead 69.5 ug/L Fluoride 300.0 ug/L Iron 370.0 ug/L
Site ID: SD057
OWS 7019
Oil/Water Separator
Cost
$48.8M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 1998
This site is under ongoing monitoring until Sep 2088
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,3,5-Trimethylbenzene 0.036 ug/L 1,1-Dichloroethane 0.071 ug/L n-Butylbenzene 0.072 ug/L Chloroform 0.084 ug/L cis-1,2-Dichloroethylene 0.092 ug/L Benzene, p-dichloro- 0.1 ug/L 1,2-Dichloroethane (EDC) 0.1 ug/L Benzene, chloro- 0.1 ug/L Beryllium and compounds 0.1 ug/L Benzene, methyl- 0.11 ug/L 1,3-Dichlorobenzene 0.11 ug/L Bromodichloromethane 0.12 ug/L Hexachlorobutadiene 0.12 ug/L Cobalt 0.13 ug/L Benzene, 1,2,4-trichloro- 0.14 ug/L Chloromethane (methyl chloride) 0.15 ug/L Vinyl Chloride 0.2 ug/L Trichlorofluoromethane 0.2 ug/L 1,1,2-Trichloroethane 0.2 ug/L 1,1-Dichloroethylene 0.24 ug/L Dichloropropane 0.3 ug/L Methylene Chloride 0.4 ug/L Manganese and compounds 0.43 ug/L Bromomethane 0.6 ug/L Selenium 0.6 ug/L 1,2-trans-dichloroethylene 0.62 ug/L Carbon Tetrachloride 0.635 ug/L Benzene 0.7 ug/L Chlorodibromomethane 0.72 ug/L Bromoform 0.9 ug/L Lead 1.2 ug/L Ethyl benzene 1.3 ug/L 1,1,2,2-Tetrachloroethane 1.4 ug/L Antimony and compounds 1.5 ug/L Arsenic 1.5 ug/L Nickel (Soluble Salts) 1.8 ug/L Bis(2-Ethylhexyl)Phthalate 2.4 ug/L Copper and compounds 2.6 ug/L Trichloroethylene (TCE) 3.3 ug/L Chromium 4.0 ug/L Zinc 7.3 ug/L Carbon Dichloride 8.2 ug/L Vanadium 9.5 ug/L Molybdenum 20.6 ug/L Barium 61.0 ug/L Iron 167.0 ug/L Fluoride 200.0 ug/L Aluminum 207.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Ethyl benzene 0.0007 mg/kg o-Xylene 0.0008 mg/kg Benzene, methyl- 0.0017 mg/kg Methylene Chloride 0.0024500000000000004 mg/kg Bromoform 0.0039 mg/kg Carbon Tetrachloride 0.008400000000000001 mg/kg
Site ID: WP007
7100 AREA DISPOSAL
Contaminated Ground Water
Cost
$11M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 1998
This site is under ongoing monitoring until Sep 2067
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.1 ug/L 1,1-Dichloroethylene 0.2 ug/L Beryllium and compounds 0.21 ug/L Cobalt 0.26 ug/L 1,2-trans-dichloroethylene 0.27 ug/L Manganese and compounds 0.27 ug/L Chloromethane (methyl chloride) 0.3 ug/L Methylene Chloride 0.3 ug/L Dichloropropane 0.3 ug/L Antimony and compounds 0.31 ug/L 1,1-Dichloroethane 0.4 ug/L 1,2-Dichlorobenzene 0.4 ug/L Cadmium and compounds 0.42 ug/L Selenium 0.42 ug/L Trichlorofluoromethane 0.455 ug/L 1,2-Dichloroethane (EDC) 0.5 ug/L Vinyl Chloride 0.5 ug/L Bromomethane 0.7 ug/L Benzene, p-dichloro- 0.8 ug/L 1,1,1-Trichloroethane 1.0 ug/L Silver and compounds 1.1 ug/L cis-1,2-Dichloroethylene 1.2 ug/L Benzene, methyl- 1.7 ug/L Benzene, chloro- 1.75 ug/L Lead 1.8 ug/L Arsenic 1.8 ug/L Chlorodibromomethane 2.1 ug/L Carbon Dichloride 2.1 ug/L Benzene 2.8 ug/L Copper and compounds 2.9 ug/L Chromium 6.2 ug/L Zinc 7.9 ug/L Nickel (Soluble Salts) 10.0 ug/L Trichloroethylene (TCE) 13.0 ug/L Iron 14.0 ug/L Vanadium 14.0 ug/L Cyanide (free) 25.0 ug/L Barium 87.0 ug/L Fluoride 150.0 ug/L Aluminum 172.0 ug/L
Site ID: FR011
EXISTING FIRE PROTECTION TRAINING AREA
Fire/Crash Training Area
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1998
This site is under ongoing monitoring until Sep 2046
Site ID: FT011P
PFC - FIRE PROTECTION TRAINING AREA - EXISTING
Fire/Crash Training Area
Cost
$15.3M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
115 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: ST072
BUILDING 3975, TANK 3965
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: XU403
PRACTICE BOMBING (FORMERLY BOMB1)
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2008
Site ID: ST080
GOLF COURSE DRAINAGE DITCH
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: FT009
FIRE DEPARTMENT TRAINING AREA NO. 2
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: MY082
GOLF COURSE MAINTENANCE AREA OF CONCERN
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: SD014
DRAINAGE DITCH NO. 2
Storm Drain
Cost
Unknown
Final Cleanup Action
Jun 1996
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Ethyl benzene 0.8 ug/L Benzene, methyl- 1.2 ug/L Trichloroethylene (TCE) 2.2 ug/L Lead 4.15 ug/L Methylene Chloride 8.0 ug/L Manganese and compounds 110.0 ug/L Fluoride 200.0 ug/L Iron 260.0 ug/L
Site ID: SD061
OWS 6905
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST073
BUILDING 10015, ILS, FACILITY ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: CTU001
10052 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1998
Site ID: CTU004
17760 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 2004
Site ID: CTU014
13025-C MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2000
Site ID: CTU024
4225-2 WASTE FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: ST077
TANK 4853
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: WP017
WEAPONS STORAGE SEPTIC TANK
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: CCB026
4376 AIRCRAFT MAINTENANCE, ACM PRESENT = FLOOR TILE.
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CTU007
18015-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 2002
Site ID: CTU023
4225-1 WASTE FUEL/ SOLVENT
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CCB025
4120 PETROLEUM OPERATIONS, ACM PRESENT = CEILING SHEET ROCK.
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: CCB027
7040 MAINTENANCE HANGAR, ACM PRESENT = FLOOR TILE.
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: GR405
MATHER LAKE PRACTICE GRENADE LAUNCHER TRAINING RANGE
Grenade Range
Cost
$78K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2011
This site is under ongoing monitoring until Sep 2045
Site ID: CTA028
10402
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jan 2012
Site ID: CTA029
10403
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jan 2012
Site ID: CTU025
8195 UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: DD085
SOUTH DITCH
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: CTA015
7100 FIRE TRAINING FACILITY
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: FR086
MILITARY FIRING RANGE
Firing Range
Cost
Unknown
Final Cleanup Action
Jun 1999
This site is under ongoing monitoring until Aug 1999
Site ID: FT008
FIRE DEPARTMENT TRAINING AREA NO. 1
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Sep 1998
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, methyl- 0.2 ug/L Ethyl benzene 0.5 ug/L cis-1,2-Dichloroethylene 1.1 ug/L Carbon Dichloride 2.3 ug/L
Site ID: LF001
RUNWAY OVERRUN LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Jul 1995
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1-Dichloroethylene 0.2 ug/L Benzene, methyl- 0.21 ug/L Chloromethane (methyl chloride) 0.3 ug/L Chloroform 0.5 ug/L cis-1,2-Dichloroethylene 0.7 ug/L Ethyl benzene 0.8 ug/L Methylene Chloride 0.9 ug/L Lead 2.0 ug/L Carbon Tetrachloride 8.1 ug/L Trichloroethylene (TCE) 11.0 ug/L Carbon Dichloride 69.0 ug/L
Site ID: CTU002
10087 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: CTU003
14995 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU005
10550-1 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 2001
Site ID: CTU006
10550-2 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 2001
Site ID: CTU008
7022-1 MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU009
7022-2 JP-4
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU010
7022-3 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU012
13025-A MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2000
Site ID: CTU013
13025-B MOGAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2000
Site ID: CTU016
4587 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU017
7010 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1996
Site ID: CTU018
7033 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU019
7039 WASTE OIL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU020
7100 WASTE POL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: CTU021
8150 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CTU022
14517 DIESEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: FT010
FIRE DEPARTMENT TRAINING AREA NO. 3
Fire/Crash Training Area
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1998
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene 0.4 ug/L Chloroform 0.42 ug/L Carbon Dichloride 0.48 ug/L Benzene, methyl- 0.5 ug/L Ethyl benzene 1.3 ug/L 1,2-Dichloroethane (EDC) 1.7 ug/L Trichloroethylene (TCE) 18.0 ug/L cis-1,2-Dichloroethylene 39.0 ug/L
Soil: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 3.0e-05 mg/kg 1,1-Dichloroethylene 0.00013333329999999999 mg/kg Chloroform 0.0002 mg/kg Benzene, chloro- 0.00035 mg/kg Ethyl benzene 0.0011 mg/kg o-Xylene 0.00125 mg/kg Benzene 0.0025 mg/kg Methylene Chloride 0.0034333333000000003 mg/kg Benzene, methyl- 0.0037 mg/kg Benzo(def)Phenanthrene 0.097 mg/kg Lead 10.02 mg/kg
Site ID: OT089
OLD SKEET RANGE
Firing Range
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2006
This site is under ongoing monitoring until Sep 2045
Site ID: LF002
8150 AREA LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Nov 1996
This site is under ongoing monitoring until Dec 1997
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Ethyl benzene 0.4 ug/L Benzene, methyl- 0.7 ug/L Methylene Chloride 1.0 ug/L Arsenic 3.5 ug/L Zinc 11.3 ug/L Barium 12.1 ug/L Vanadium 12.3 ug/L Iron 21.2 ug/L Fluoride 130.0 ug/L
Site ID: LF005
NORTHEAST PERIMETER LANDFILL NO. 3
Landfill
Cost
Unknown
Final Cleanup Action
Jan 1997
This site is under ongoing monitoring until Sep 2006
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,2-Dichloroethane (EDC) 0.1 ug/L Chloroform 0.1 ug/L Trichloroethylene (TCE) 0.1 ug/L Antimony and compounds 0.16 ug/L Benzene 0.2 ug/L Selenium 0.26 ug/L Dichloropropane 0.5 ug/L Chromium 0.685 ug/L cis-1,2-Dichloroethylene 0.7 ug/L Manganese and compounds 0.77 ug/L Arsenic 0.94 ug/L Silver and compounds 0.99 ug/L Ethyl benzene 1.0 ug/L Cobalt 1.3 ug/L Carbon Dichloride 1.4 ug/L Copper and compounds 1.5 ug/L Lead 1.6 ug/L Zinc 2.3 ug/L Nickel (Soluble Salts) 2.4 ug/L Vanadium 7.0 ug/L Benzene, methyl- 25.0 ug/L Barium 39.5 ug/L Fluoride 105.0 ug/L
Site ID: LF006
FIRING RANGE LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Jan 1997
This site is under ongoing monitoring until Apr 2002
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 0.06 ug/L Benzene, methyl- 0.3 ug/L Chloroform 0.31 ug/L Trichloroethylene (TCE) 0.5 ug/L Ethyl benzene 0.8 ug/L 1,1,2,2-Tetrachloroethane 0.8 ug/L Methylene Chloride 1.2 ug/L Arsenic 3.6 ug/L Lead 4.3 ug/L Vanadium 16.1 ug/L Molybdenum 18.7 ug/L Zinc 20.2 ug/L Barium 33.4 ug/L Iron 82.6 ug/L Fluoride 160.0 ug/L
Site ID: OT021
ASPHALT RUBBLE STORAGE
Storm Drain
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: OT022
ASPHALT RUBBLE STORAGE
Storm Drain
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: OT062
OWS 7110 AND JET ENGINE TEST CELL
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1997
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methyl Ethyl Ketone 0.011 mg/kg DDT 0.34 mg/kg DDD 0.34 mg/kg Chlordane 0.36 mg/kg Polychlorinated Biphenyls 6.8 mg/kg Cadmium and compounds 16.2 mg/kg Mercury (Inorganic) 37.0 mg/kg Chromium III 277.0 mg/kg Zinc 625.0 mg/kg Lead 654.0 mg/kg
Site ID: OT067
SAC AREA SHOP DRAINAGE SYSTEMS
Waste Lines
Cost
Unknown
Final Cleanup Action
Sep 1998
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chlordane 0.002 mg/kg Polychlorinated Biphenyls 0.324 mg/kg Lead 12100.0 mg/kg
Site ID: OT069
OPEN BURN/OPEN DETONATION PIT
Burn Area
Cost
Unknown
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Sep 2012
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Contaminants: Hexachlorodibenzo-p-dioxin mixture (HxCDD) 7.2e-05 mg/kg Toluene 0.005 mg/kg
Soil: Risk Not Evaluated
Contaminants: Barium 0.00134 mg/kg Methyl Ethyl Ketone 0.014 mg/kg DDD 0.046 mg/kg Hexachlorodibenzo-p-dioxin mixture (HxCDD) 0.0504 mg/kg DDE 0.076 mg/kg DDT 0.3 mg/kg Lead 66.3 mg/kg Zinc 200.0 mg/kg
Site ID: SD013
DRAINAGE DITCH NO. 1
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Oct 1997
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloroform 0.41 ug/L 1,2-trans-dichloroethylene 0.7 ug/L Ethyl benzene 0.9 ug/L 1,1,2,2-Tetrachloroethane 0.9 ug/L Methylene Chloride 1.3 ug/L Trichloroethylene (TCE) 1.6 ug/L
Site ID: SD015
DRAINAGE DITCH NO. 3
Storm Drain
Cost
Unknown
Final Cleanup Action
Aug 1999
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Carbon Tetrachloride 0.2 ug/L Chloroform 0.25 ug/L Trichloroethylene (TCE) 0.3 ug/L 1,1,1-Trichloroethane 0.52 ug/L Benzene 0.9 ug/L 1,1-Dichloroethylene 1.0 ug/L Benzene, p-dichloro- 1.9 ug/L 1,1-Dichloroethane 2.4 ug/L cis-1,2-Dichloroethylene 2.8 ug/L Carbon Dichloride 4.05 ug/L Manganese and compounds 5.0 ug/L Methylene Chloride 5.0 ug/L Lead 6.35 ug/L Benzene, methyl- 6.7 ug/L Nickel (Soluble Salts) 41.0 ug/L Fluoride 200.0 ug/L Iron 920.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Benzene, p-dichloro- 0.0011 mg/kg Silver and compounds 0.73 mg/kg Cadmium and compounds 4.65 mg/kg Nickel (Soluble Salts) 26.2 mg/kg Lead 44.300000000000004 mg/kg Chromium 53.800000000000004 mg/kg
Site ID: SD055
OWS 7038
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SD056
OWS 2989
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Aug 1998
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Cadmium and compounds 1.6 mg/kg Trichloroethylene (TCE) 2.5 mg/kg Benzo(a)Anthracene 4.2 mg/kg Benzo(b)Fluoranthene 8.8 mg/kg 1,1,1-Trichloroethane 9.200000000000001 mg/kg Benzo(a)Pyrene 14.0 mg/kg Arsenic 16.8 mg/kg Lead 374.0 mg/kg
Site ID: SD058
OWS 4771
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SD060
OWS 6900
Storm Drain
Cost
Unknown
Final Cleanup Action
Aug 1998
Site ID: SD063
OWS 3321
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SD064
OWS 4120
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SD088
MORRISON CREEK
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: SD046
OWS 4120
Duplicate Site Within Same Program
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SR401
MACHINE GUN RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Oct 2008
Site ID: ST024
1983 JP-4 SPILL SITE AND REFUELING APRON
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: LF003
NORTHEAST PERIMETER LANDFILL NO. 1
Landfill
Cost
$4M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 1997
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, chloro- 0.3 ug/L Ethyl benzene 1.0 ug/L Benzene, methyl- 1.5 ug/L
Site ID: LF018
OLD BURIAL SITE
Landfill
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1999
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,2-Dichloroethane (EDC) 0.3 ug/L Chloroform 0.7 ug/L cis-1,2-Dichloroethylene 1.2 ug/L Ethyl benzene 1.3 ug/L 1,1,2,2-Tetrachloroethane 1.4 ug/L Carbon Tetrachloride 1.5 ug/L Methylene Chloride 2.4 ug/L Carbon Dichloride 3.5 ug/L Benzene, methyl- 6.0 ug/L Manganese and compounds 6.35 ug/L Trichloroethylene (TCE) 7.9 ug/L Nickel (Soluble Salts) 10.0 ug/L Vanadium 10.3 ug/L Zinc 13.9 ug/L Molybdenum 19.5 ug/L Barium 25.3 ug/L Iron 38.4 ug/L Aluminum 192.5 ug/L
Site ID: ST026
BUILDING 10072, ONE ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST027
BUILDING 10060, ONE ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST028
FUEL SPILL AT BUILDING 16100
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST030
BUILDING 10300
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1993
Site ID: ST031
BUILDING 10090, ONE ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST032
FUEL SPILL AT AAFES SERVICE STATION
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Toluene 0.005 mg/kg
Site ID: ST033
BUILDING 3308, SIX ABANDONED UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST034
FUEL SPILL AT FAMILY HOUSING SERVICE STATION
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1997
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Benzene 0.12 mg/kg Toluene 0.23 mg/kg Ethylbenzene 0.37 mg/kg Xylene (Mixed) 1.9000000000000001 mg/kg
Site ID: ST035
BUILDING 3226, FOUR ABANDONED UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1997
Site ID: ST036
BUILDING 3286, FOUR ABANDONED UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1997
Site ID: ST038
BUILDING 3388
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST040
BUILDING 3875
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST042
BUILDING 2898
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST043
BUILDING 10150, TWO ABANDONED UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST044
BUILDING 8540
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST045
BUILDING 7003
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST046
BUILDING 8158(TANK 8158A)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST047
UNDERGROUND STORAGE TANKS 10400B
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1993
Site ID: ST049
BUILDING 10450, ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST051
BUILDING 10030
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST052
BUILDING 10400, ABANDONED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST053
BUILDING 18051, ABANONDED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST070
BUILDING 1226, TANK 1226
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST025
BUILDING 10100
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1993
Site ID: ST074
10065
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST075
TANK 18015
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST076
TANK 18020
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST078
UNDERGROUND STORAGE TANKS EAST OF BUILDING 2527
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1997
Site ID: ST079
BUILDING 4540, TANK 4540
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1997
Site ID: ST081
SEWAGE OXIDATION PONDS
Sewage Effluent Settling Ponds
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: WL084
SANITARY SEWER LINE FROM SAC AREA TO SEWAGE TREATMENT FACILITY
Waste Lines
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: WP019
FUEL TANK SLUDGE BURIAL SITE
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Jul 1997
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, chloro- 0.2 ug/L Benzene, methyl- 0.4 ug/L Ethyl benzene 0.8 ug/L Lead 5740.0 ug/L
Soil: Risk Not Evaluated
Contaminants: 1,1,1-Trichloroethane 0.0001 mg/kg Chloroform 0.0002 mg/kg Benzene, methyl- 0.0004 mg/kg Ethyl benzene 0.00185 mg/kg Methylene Chloride 0.0045000000000000005 mg/kg
Site ID: WR083
HELICOPTER WASHRACK
Washrack
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: XE402
UNEXPLODED ORDNANCE BURIAL SITE (FORMERLY ORD01)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 2007
Site ID: XE404
OB/OD PIT (FORMER IRP SITE 69)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: ST071
BUILDING 3271, TANK 3273E
Underground Storage Tanks
Cost
$2.09M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 1996
This site is under ongoing monitoring until Sep 2045
Site ID: XU400
GRENADE PRACTICE
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Sep 2009
Site ID: ST029
POL YARD NO. 4
Underground Storage Tanks
Cost
$2.09M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 1996
This site is under ongoing monitoring until Sep 2045
Site ID: ST068
UNDERGROUND STORAGE TANKSS AT FUEL TRANSFER STATION
Underground Storage Tanks
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1998
This site is under ongoing monitoring until Sep 2045
Site ID: ST020
DIESEL SPILL SITE (SEWAGE TREATMENT PLANT)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1998
This site is under ongoing monitoring until May 2012
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Benzene, chloro- 0.27 ug/L 1,1,2,2-Tetrachloroethane 0.3 ug/L Carbon Dichloride 0.44 ug/L Chloroform 0.46 ug/L 1,1-Dichloroethane 0.46 ug/L Ethyl benzene 0.7 ug/L Benzene, methyl- 0.8 ug/L Trichloroethylene (TCE) 0.81 ug/L Methylene Chloride 1.9 ug/L Lead 30.0 ug/L
Site ID: ST048
BUILDING 10410, ONE (OR TWO) ABANDONED UNDERGROUND STORAGE TANKS(S)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: CCB011
7035 CORROSION CONTROL HANGAR, ACM PRESENT = FLOOR TILE, MECHANI
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Oct 1996
Site ID: SD065
OWS 6910
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Sep 1996
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chlordane 0.0035 mg/kg Methyl Ethyl Ketone 0.02 mg/kg Polychlorinated Biphenyls 0.33 mg/kg Cadmium and compounds 9.6 mg/kg Chromium III 3140.0 mg/kg
Site ID: FR087
SKEET AND TRAP RANGE
Firing Range
Cost
$2.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1999
This site is under ongoing monitoring until Sep 2045
Site ID: RW016
ELECTRON TUBE BURIAL SITE
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SD066
OWS 6915
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: ST041
BUILDING 2995
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1996
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.