Cost So Far

$223K

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$21.9M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2045

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

A total of 11,520 acres were acquired for Camp Coxcomb. This site is located in an undeveloped region of Riverside County California, approximately 24 miles so the west of Freda, California, and 16 miles northeast of Desert Center. Camp Coxcomb is... see more » A total of 11,520 acres were acquired for Camp Coxcomb. This site is located in an undeveloped region of Riverside County California, approximately 24 miles so the west of Freda, California, and 16 miles northeast of Desert Center. Camp Coxcomb is located within T2S, R16E, Sections 35 an Meridian); T3S ions 1, 2 11-C 15 34, 35, and 36 (south 1/2). Approximately 8,563 acres of the site are currently owned by the U.S. Department of the Interior and under the jurisdiction of the Bureau of Land Management. Approximately 2,957 acres of the site are owned by the Metropolitan Water District of Southern California and various private parties. In addition, approximately 50 mining claims have been located on the Camp Coxcomb site. This property is known or suspected to contain military munitions and explosives of concern (e.g., unexploded ordnance) and therefore may present an explosive hazard. (Source: U.S. Army Corps of Engineers) « see less

7 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

7 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: 06OEW

MULTI USE RANGE

Multi Use Range

Cost

$6.61M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

This site is under ongoing monitoring until Sep 2078

Contaminated Areas

Soil: Low Risk

Contaminants: Nickel 5.1 mg/kg Lead 16.0 mg/kg Strontium 29.0 mg/kg Zinc 85.0 mg/kg Barium 260.0 mg/kg Manganese 290.0 mg/kg Copper 380.0 mg/kg Titanium 830.0 mg/kg Aluminum 8700.0 mg/kg Iron 24000.0 mg/kg

See more details...

Site ID: 07OEW

OE DUMP AREA

Munitions Burial

Cost

$2.9M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

This site is under ongoing monitoring until Sep 2078

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony 0.18 mg/kg Nickel 5.2 mg/kg Lead 7.9 mg/kg Copper 11.0 mg/kg Strontium 29.0 mg/kg Zinc 62.0 mg/kg Manganese 220.0 mg/kg Titanium 610.0 mg/kg Aluminum 7200.0 mg/kg Iron 16000.0 mg/kg

See more details...

Site ID: 01OEW

GARBAGE DUMP AREA

Munitions Burial

Cost

$2.87M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

This site is under ongoing monitoring until Sep 2078

Contaminated Areas

Soil: Low Risk

Contaminants: Nickel 4.2 mg/kg Copper 9.2 mg/kg Lead 15.0 mg/kg Strontium 30.0 mg/kg Manganese 190.0 mg/kg Aluminum 6400.0 mg/kg Iron 14000.0 mg/kg

See more details...

Site ID: 04OEW

AREA I DISPOSAL AREA

Munitions Burial

Cost

$2.76M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

This site is under ongoing monitoring until Sep 2078

Site ID: 02OEW

HEADQUARTERS AREA PBR

Air to Land

Cost

$2.54M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

This site is under ongoing monitoring until Sep 2078

Site ID: 05OEW

SMALL ARMS RANGE 3

Small Arms Range

Cost

$2.15M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2035

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony 0.17 mg/kg Nickel 5.4 mg/kg Copper 8.9 mg/kg Strontium 22.0 mg/kg Lead 44.0 mg/kg Zinc 57.0 mg/kg Barium 250.0 mg/kg Manganese 260.0 mg/kg Titanium 1000.0 mg/kg Aluminum 10000.0 mg/kg Iron 20000.0 mg/kg

See more details...

Site ID: 03OEW

SMALL ARMS RANGE 2

Small Arms Range

Cost

$2.12M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2045

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »