Back to Map
NAVY INSTALLATION ID: FL417002324400

WHITING FIELD NAS

milton, Florida

Cost So Far

$52.5M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$31.7M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2040

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

49 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

7 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00040

WHITING FIELD NAS

Surface Disposal Area

Cost

$16.3M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2020

This site is under ongoing monitoring until Jun 2047

Contaminated Areas

Groundwater: High Risk

Contaminants: Heptachlor epoxide 280.0 ppb Carbon tetrachloride 1000.0 ppb Acenaphthene 1000.0 ppb Fluorene 1000.0 ppb Chloromethane 2000.0 ppb Dichloroethane, 1,1- 2000.0 ppb Cyanide (free) 2400.0 ppb Pyrene 3000.0 ppb Methylene chloride 3000.0 ppb Fluoranthene 4000.0 ppb Trichloroethane, 1,1,1- 4000.0 ppb Phenanthrene 6000.0 ppb Silver and compounds 6600.0 ppb Carbazole 10000.0 ppb Selenium 10300.0 ppb Naphthalene 12000.0 ppb Bis(2-chloroethyl)ether 18000.0 ppb Chloroform 25000.0 ppb Antimony and compounds 27900.0 ppb Arsenic (cancer) 29300.0 ppb Cadmium and compounds 32000.0 ppb Beryllium and compounds 39000.0 ppb Mercury and compounds (inorganic) 48000.0 ppb 2,4-Dimethylphenol 54000.0 ppb 2,6-Dimethylphenol 54000.0 ppb Nickel and compounds 79000.0 ppb Acetone 130000.0 ppb Barium and compounds 143000.0 ppb Phenol 150000.0 ppb Vinyl chloride 190000.0 ppb Copper and compounds 195000.0 ppb Chromium VI and compounds 212000.0 ppb 4-Methylphenol 390000.0 ppb 2-Methylphenol 400000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 490000.0 ppb Vanadium 515000.0 ppb Zinc 1270000.0 ppb Lead 1290000.0 ppb Trichloroethylene (TCE) 1400000.0 ppb Ethylbenzene 2800000.0 ppb Manganese 3220000.0 ppb Xylene (mixed) 12000000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 14000000.0 ppb Toluene 47000000.0 ppb Aluminum 53900000.0 ppb Iron 110000000.0 ppb

See more details...

Site ID: SITE 00039

WHITING FIELD NAS

Contaminated Sediments

Cost

$986K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

Contaminated Areas

Sediment (Fresh): High Risk

Contaminants: Dieldrin 0.29 ppb DDE 0.83 ppb Cacodylic acid 19.8 ppb Arsenic (cancer) 20.0 ppb Nickel and compounds 23.8 ppb Silver and compounds 105.0 ppb Copper and compounds 438.0 ppb Lead 825.0 ppb Zinc 1270.0 ppb Aluminum 66000.0 ppb

See more details...

Site ID: UXO 000002

WHITING FIELD NAS

Unexploded Munitions and Ordnance Area

Cost

$216K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 2019

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: UXO 000001

WHITING FIELD NAS

Firing Range

Cost

$2.52M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2021

This site is under ongoing monitoring until Oct 2049

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo(a)Pyrene 406.0 ppb Lead 1300.0 ppb

See more details...

Site ID: SITE 00007

WHITING FIELD NAS

Underground Tank Farm

Cost

$3.12M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2006

This site is under ongoing monitoring until Jul 2051

Contaminated Areas

Soil: High Risk

Contaminants: Mercury and compounds (inorganic) 0.15 ppb Beryllium and compounds 0.39 ppb Carbon tetrachloride 1.0 ppb Methylene chloride 1.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 2.0 ppb Chloroform 2.0 ppb Selenium 2.1 ppb Silver and compounds 6.6 ppb Naphthalene 9.0 ppb Carbazole 10.0 ppb Nickel and compounds 19.6 ppb Chromium VI and compounds 26.5 ppb Antimony and compounds 27.9 ppb Arsenic (cancer) 29.3 ppb Copper and compounds 29.9 ppb Cadmium and compounds 32.0 ppb Vanadium 36.4 ppb 2,4-Dimethylphenol 54.0 ppb 2,6-Dimethylphenol 54.0 ppb Barium and compounds 112.0 ppb Acetone 130.0 ppb Phenol 150.0 ppb Zinc 186.0 ppb Vinyl chloride 190.0 ppb 4-Methylphenol 390.0 ppb 2-Methylphenol 400.0 ppb Manganese 725.0 ppb Lead-198 1290.0 ppb Trichloroethylene (TCE) 1400.0 ppb Ethyl benzene 2400.0 ppb Aluminum 7370.0 ppb Xylene (mixed) 12000.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 14000.0 ppb Iron 42500.0 ppb Toluene 47000.0 ppb

See more details...

Site ID: UXO 000003

WHITING FIELD NAS

Small Arms Range

Cost

$6.91M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2022

This site is under ongoing monitoring until Aug 2052

Site ID: SITE 00004

WHITING FIELD NAS

Underground Tank Farm

Cost

$3.64M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2007

This site is under ongoing monitoring until Aug 2055

Contaminated Areas

Soil: High Risk

Contaminants: Mercury and compounds (inorganic) 0.25 ppb Beryllium and compounds 1.6 ppb Phenanthrene 2.0 ppb Methylene chloride 3.0 ppb Fluoranthene 4.0 ppb 2,4-Dimethylphenol 6.0 ppb Naphthalene 10.0 ppb Arsenic (cancer) 17.2 ppb Cadmium and compounds 17.2 ppb Bis(2-chloroethyl)ether 18.0 ppb Chloroform 25.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 32.0 ppb Nickel and compounds 33.6 ppb Phenol 43.0 ppb 2-Methylphenol 46.0 ppb Acetone 49.0 ppb 4-Methylphenol 58.0 ppb Copper and compounds 60.3 ppb Chromium VI and compounds 84.0 ppb Barium and compounds 92.8 ppb Zinc 186.0 ppb Vanadium 196.0 ppb Lead 481.0 ppb Trichloroethylene (TCE) 510.0 ppb Manganese 605.0 ppb Ethyl benzene 2000.0 ppb Xylene 5100.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 5500.0 ppb Toluene 23000.0 ppb Aluminum 29200.0 ppb Iron 78300.0 ppb

See more details...

42 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00013

WHITING FIELD NAS

Landfill

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: Low Risk

Contaminants: Fluoranthene 0.05 ppb Mercury and compounds (inorganic) 0.05 ppb Pyrene 0.06 ppb Beryllium and compounds 0.16 ppb Copper and compounds 0.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.45 ppb Silver and compounds 0.76 ppb Nickel and compounds 2.9 ppb Arsenic (cancer endpoint) 6.9 ppb Barium and compounds 9.5 ppb Lead 10.5 ppb Zinc 17.5 ppb Chromium (total) 18.6 ppb Vanadium 42.0 ppb Aluminum 20900.0 ppb

See more details...

Site ID: SITE 00015

WHITING FIELD NAS

Landfill

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.09 ppb Xylene (mixed) 2.0 ppb Arsenic (cancer endpoint) 2.2 ppb Barium and compounds 9.0 ppb Chromium (total) 10.8 ppb Zinc 11.3 ppb Copper and compounds 12.5 ppb Vanadium 20.6 ppb Bis(2-ethylhexyl)phthalate (DEHP) 41.0 ppb Lead 59.9 ppb Aluminum 11800.0 ppb

See more details...

Site ID: SITE 00016

WHITING FIELD NAS

Landfill

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 1999

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: Medium Risk

Contaminants: Mercury and compounds (inorganic) 0.1 ppb Beryllium and compounds 0.12 ppb Silver and compounds 0.87 ppb Arsenic (cancer endpoint) 3.1 ppb Xylene (mixed) 5.0 ppb DDD 5.5 ppb Nickel and compounds 5.5 ppb Chromium (total) 14.9 ppb Vanadium 28.9 ppb Dieldrin 33.0 ppb Barium and compounds 42.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 43.0 ppb Copper and compounds 50.8 ppb Lead 121.0 ppb Zinc 128.0 ppb Aluminum 18600.0 ppb

See more details...

Site ID: SITE 00018

WHITING FIELD NAS

Fire/Crash Training Area

Cost

$125K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: High Risk

Contaminants: Carbon disulfide 0.01 ppb Methylene chloride 0.08 ppb Beryllium and compounds 0.14 ppb Mercury 0.25 ppb Silver and compounds 0.35 ppb Toluene 0.39 ppb Fluorene 0.44 ppb Thallium sulfate 0.53 ppb Ethylbenzene 0.8 ppb Benzo[a]pyrene 1.2 ppb Benz(a)anthracene 1.3 ppb Chrysene 1.4 ppb Acetone 1.4 ppb Phenanthrene 2.2 ppb Arsenic (cancer) 3.1 ppb Fluoranthene 3.5 ppb Bis(2-ethylhexyl)phthalate (DEHP) 5.6 ppb Antimony and compounds 5.8 ppb Xylene 7.0 ppb Pyrene 7.7 ppb Naphthalene 8.0 ppb Vanadium 12.1 ppb Nickel and compounds 19.7 ppb Methylnaphthalene,2 33.0 ppb Cadmium and compounds 38.0 ppb Chromium VI and compounds 95.7 ppb Lead 168.0 ppb Barium and compounds 290.0 ppb Manganese 467.0 ppb Zinc 779.0 ppb Copper and compounds 864.0 ppb Aluminum 13500.0 ppb Iron 61700.0 ppb

See more details...

Site ID: SITE 00030

WHITING FIELD NAS

Underground Storage Tanks

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: High Risk

Contaminants: DDD 0.01 ppb Methyl ethyl ketone 0.01 ppb Diethyl phthalate 0.04 ppb Mercury and compounds (inorganic) 0.06 ppb Beryllium and compounds 0.14 ppb Trichloroethylene (TCE) 0.18 ppb Pyrene 0.33 ppb Dimethyl phthalate 0.33 ppb Cyanide (free) 0.6 ppb Acetone 0.69 ppb Cadmium and compounds 0.71 ppb Silver and compounds 0.84 ppb Selenium 3.1 ppb Nickel and compounds 3.3 ppb Copper and compounds 4.8 ppb Arsenic (cancer endpoint) 8.6 ppb Zinc 10.5 ppb Chromium (total) 15.6 ppb Lead 16.0 ppb Barium and compounds 26.1 ppb Vanadium 43.9 ppb Manganese 898.0 ppb Aluminum 15900.0 ppb

See more details...

Site ID: SITE 00032

WHITING FIELD NAS

Underground Storage Tanks

Cost

$26K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2000

This site is under ongoing monitoring until Nov 2044

Contaminated Areas

Soil: High Risk

Contaminants: Di-n-octyl phthalate 0.04 ppb Carbazole 0.04 ppb Fluoranthene 0.05 ppb Mercury and compounds (inorganic) 0.05 ppb Methyl ethyl ketone 0.05 ppb Acetone 0.23 ppb Cadmium and compounds 0.44 ppb Cyanide (free) 0.58 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.6 ppb Toluene 1.1 ppb Pyrene 1.2 ppb Silver and compounds 1.2 ppb Acenaphthene 1.4 ppb Dimethylphenol, 2,4- 1.5 ppb Fluorene 2.6 ppb Selenium 3.7 ppb Nickel and compounds 4.7 ppb Phenanthrene 5.1 ppb Arsenic (cancer endpoint) 6.0 ppb Barium and compounds 6.2 ppb Naphthalene 7.2 ppb Copper and compounds 8.4 ppb Zinc 10.6 ppb Chromium (total) 26.3 ppb Lead 30.7 ppb Vanadium 50.5 ppb Aluminum 33200.0 ppb

See more details...

Site ID: SITE 00033

WHITING FIELD NAS

Underground Storage Tanks

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: High Risk

Contaminants: DDT 0.01 ppb Dieldrin 0.01 ppb Pyrene 0.04 ppb Butyl benzyl phthalate 0.04 ppb Trichloroethylene (TCE) 0.05 ppb Acetone 0.15 ppb Fluorene 0.15 ppb Mercury and compounds (inorganic) 0.17 ppb Phenanthrene 0.24 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.41 ppb Naphthalene 0.61 ppb Selenium 0.64 ppb Cadmium and compounds 0.68 ppb Ethylbenzene 1.5 ppb Nickel and compounds 3.8 ppb Xylene (mixed) 4.8 ppb Lead 7.5 ppb Copper and compounds 11.1 ppb Arsenic (cancer endpoint) 11.5 ppb Chromium (total) 12.8 ppb Barium and compounds 14.3 ppb Zinc 19.3 ppb Vanadium 61.5 ppb Aluminum 47800.0 ppb

See more details...

Site ID: SITE 00035

WHITING FIELD NAS

Contaminated Ground Water

Cost

$33K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2006

This site is under ongoing monitoring until Jun 2045

Contaminated Areas

Soil: Medium Risk

Contaminants: Acetone 0.1 ppb Mercury and compounds (inorganic) 0.15 ppb Selenium 0.31 ppb Beryllium and compounds 0.45 ppb Arsenic (cancer) 2.3 ppb Ethylbenzene 3.6 ppb Nickel and compounds 4.9 ppb Copper and compounds 10.1 ppb Chromium (III) 10.9 ppb Lead 17.4 ppb Xylenes (isomers and mixtures) 18.0 ppb Vanadium 22.6 ppb Barium and compounds 37.8 ppb Zinc 83.4 ppb Manganese and compounds 133.0 ppb Iron 9370.0 ppb Aluminum 16800.0 ppb

See more details...

Site ID: SITE 00002

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1999

Contaminated Areas

Soil: Low Risk

Contaminants: Chlordane 0.01 ppb Dieldrin 0.01 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.12 ppb Beryllium and compounds 0.15 ppb Cadmium and compounds 0.24 ppb Silver and compounds 0.42 ppb Phenanthrene 0.52 ppb Arsenic (cancer) 0.91 ppb Methylnaphthalene,2 0.94 ppb Nickel and compounds 1.7 ppb Copper and compounds 1.8 ppb Chromium VI and compounds 5.8 ppb Barium and compounds 10.4 ppb Vanadium 10.5 ppb Zinc 12.0 ppb Lead 18.9 ppb Iron 3470.0 ppb Aluminum 5950.0 ppb

See more details...

Site ID: SITE 00003

WHITING FIELD NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2004

Site ID: SITE 00005

WHITING FIELD NAS

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Apr 1987

Site ID: SITE 00008

WHITING FIELD NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jan 1994

Site ID: SITE 00009

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2000

Contaminated Areas

Soil: Medium Risk

Contaminants: Mercury 0.03 ppb 1,2,4-Trichlorobenzene 0.11 ppb 1,4-Dichlorobenzene 0.12 ppb Beryllium and compounds 0.14 ppb Nickel and compounds 6.1 ppb Copper and compounds 9.0 ppb Arsenic (cancer) 10.1 ppb Antimony and compounds 12.0 ppb Lead 12.3 ppb Zinc 14.4 ppb Barium and compounds 21.7 ppb Chromium VI and compounds 46.2 ppb Manganese 52.9 ppb Vanadium 76.7 ppb Magnesium-28 227.0 ppb Iron 29800.0 ppb Aluminum 33100.0 ppb

See more details...

Site ID: SITE 00014

WHITING FIELD NAS

Landfill

Cost

Unknown

Final Cleanup Action

Dec 2001

Contaminated Areas

Soil: Medium Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.04 ppb Beryllium and compounds 0.15 ppb Chrysene 0.38 ppb Cadmium and compounds 0.94 ppb Arsenic (cancer endpoint) 4.2 ppb Lead 5.7 ppb Copper and compounds 7.8 ppb Zinc 7.8 ppb Barium and compounds 17.1 ppb Chromium (total) 17.6 ppb Vanadium 42.1 ppb Aluminum 20400.0 ppb

See more details...

Site ID: SITE 00031

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2001

Site ID: SITE 00036

WHITING FIELD NAS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jul 1999

Contaminated Areas

Soil: Low Risk

Contaminants: Mercury 0.04 ppb Selenium 0.25 ppb Arsenic (cancer) 2.4 ppb Copper and compounds 4.1 ppb Nickel and compounds 5.5 ppb Barium and compounds 6.9 ppb Manganese and compounds 18.1 ppb Vanadium 18.3 ppb Zinc 38.0 ppb Lead 53.5 ppb Iron 7090.0 ppb Aluminum 9180.0 ppb

See more details...

Site ID: SITE 00037

WHITING FIELD NAS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

May 2000

Contaminated Areas

Soil: Low Risk

Contaminants: DDT 0.01 ppb DDE,4,4- 0.01 ppb Mercury 0.15 ppb Anthracene 0.22 ppb Benzo[k]fluoranthene 0.52 ppb Phenanthrene 0.63 ppb Indeno[1,2,3-cd]pyrene 0.66 ppb Arsenic (cancer) 0.8 ppb Benzo[a]pyrene 0.89 ppb Chrysene 1.0 ppb Benzo[b]fluoranthene 1.1 ppb Pyrene 1.5 ppb Fluoranthene 2.1 ppb Vanadium 6.9 ppb Copper and compounds 7.1 ppb Chromium VI and compounds 12.6 ppb Barium and compounds 14.6 ppb Manganese and compounds 101.0 ppb Lead 124.0 ppb Zinc 177.0 ppb Iron 3590.0 ppb Aluminum 4990.0 ppb

See more details...

Site ID: SITE 00038

WHITING FIELD NAS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Dec 2006

Contaminated Areas

Soil: Low Risk

Contaminants: Selenium 0.44 ppb Arsenic (cancer) 0.68 ppb Copper and compounds 2.0 ppb Zinc 3.1 ppb Lead 3.4 ppb Chromium VI and compounds 6.6 ppb Vanadium 6.6 ppb Barium and compounds 8.8 ppb Manganese and compounds 182.0 ppb Iron 3240.0 ppb Aluminum 4540.0 ppb

See more details...

Site ID: SITE 00010

WHITING FIELD NAS

Landfill

Cost

$35K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2000

This site is under ongoing monitoring until Jun 2045

Contaminated Areas

Soil: Medium Risk

Contaminants: Chlordane, alpha- (2) 0.01 ppb Dieldrin 0.02 ppb DDT 0.04 ppb DDE,4,4- 0.04 ppb Arochlor 1260 0.06 ppb Butyl benzyl phthalate 0.09 ppb Diethyl phthalate 0.1 ppb Acenaphthene 0.11 ppb Fluorene 0.12 ppb Thallium 0.13 ppb Carbazole 0.16 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.2 ppb Cyanide (free) 0.2 ppb Mercury and compounds (inorganic) 0.2 ppb Anthracene 0.27 ppb Selenium 0.29 ppb Arochlor 1254 0.39 ppb Dibenz[ah]anthracene 1.0 ppb Phenanthrene 1.2 ppb Benz[a]anthracene 1.4 ppb Chrysene 1.6 ppb Pyrene 1.8 ppb Fluoranthene 2.3 ppb Benzo[k]fluoranthene 2.3 ppb Cadmium and compounds 2.4 ppb Benzo[b]fluoranthene 2.5 ppb Benzo[a]pyrene 2.5 ppb Indeno[1,2,3-cd]pyrene 3.2 ppb Nickel and compounds 7.0 ppb Arsenic (cancer endpoint) 8.8 ppb Copper and compounds 24.2 ppb Beryllium and compounds 26.0 ppb Lead 47.8 ppb Vanadium 63.4 ppb Potassium cyanide 299.0 ppb Barium and compounds 361.0 ppb Sodium cyanide 387.0 ppb Manganese 389.0 ppb Zinc 705.0 ppb Magnesium-28 5910.0 ppb Calcium cyanide 23200.0 ppb Chromium (total) 23200.0 ppb Iron 23800.0 ppb Aluminum 37000.0 ppb

See more details...

Site ID: UST 000001

WHITING FIELD NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1996

Contaminated Areas

Groundwater: High Risk

Contaminants: Carbon tetrachloride 1000.0 ppb Chloroform 2000.0 ppb Methylene chloride 3000.0 ppb Dichloroethylene, 1,1- 5000.0 ppb Acetone 130000.0 ppb Dichloroethylene, 1,2- (mixture) 170000.0 ppb Methyl ethyl ketone 190000.0 ppb Trichloroethylene (TCE) 1400000.0 ppb Ethylbenzene 2400000.0 ppb Xylene (mixed) 12000000.0 ppb Benzene 14000000.0 ppb Toluene 39000000.0 ppb

See more details...

Site ID: SITE 00119

WHITING FIELD NAS

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Sep 1997

Site ID: SITE 00120

WHITING FIELD NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1997

Site ID: SITE 00121

WHITING FIELD NAS

Landfill

Cost

Unknown

Final Cleanup Action

Jun 1995

Site ID: SITE 00122

WHITING FIELD NAS

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Oct 1998

Site ID: SITE 00123

WHITING FIELD NAS

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Sep 1995

Site ID: SITE 00124

WHITING FIELD NAS

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Sep 1997

Site ID: SITE 00125

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

May 1996

Site ID: SITE 00126

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 1995

Site ID: SITE 00128

WHITING FIELD NAS

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Jul 1995

Site ID: UST 000002

WHITING FIELD NAS

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Toluene 780000.0 ppb Ethylbenzene 880000.0 ppb Benzene 1600000.0 ppb Xylenes(mixed isomers) 3300000.0 ppb

See more details...

Site ID: UST 000003

WHITING FIELD NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1995

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Dichloroethylene, 1,1- 4000.0 ppb Trichloroethane, 1,1,1- 5000.0 ppb Methyl tertbutyl ether (MTBE) 11000.0 ppb

See more details...

Site ID: UST 000004

WHITING FIELD NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1993

Site ID: UST 000005

WHITING FIELD NAS

POL (Petroleum/Oil/Lubricants) Lines

Cost

Unknown

Final Cleanup Action

Jan 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Dibromoethane, 1,2- 90.0 ppb Lead 20000.0 ppb

See more details...

Site ID: UST 000006

WHITING FIELD NAS

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Jul 1994

Site ID: SITE 00029

WHITING FIELD NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2005

Contaminated Areas

Soil: High Risk

Contaminants: Methyl ethyl ketone 0.01 ppb DDE 0.02 ppb DDD 0.03 ppb Butyl benzyl phthalate 0.04 ppb Beryllium and compounds 0.09 ppb Mercury and compounds (inorganic) 0.17 ppb Acetone 0.4 ppb Cyanide (free) 0.68 ppb Selenium 1.4 ppb Nickel and compounds 2.8 ppb Arsenic (cancer endpoint) 3.7 ppb Silver and compounds 5.9 ppb Copper and compounds 8.1 ppb Barium and compounds 12.6 ppb Zinc 13.6 ppb Lead 20.1 ppb Chromium (total) 145.0 ppb Vanadium 513.0 ppb Aluminum 22300.0 ppb

See more details...

Site ID: SITE 00001

WHITING FIELD NAS

Landfill

Cost

$550K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1999

This site is under ongoing monitoring until Oct 2044

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.15 ppb Mercury and compounds (inorganic) 0.34 ppb Cadmium and compounds 0.71 ppb Dieldrin 1.5 ppb Xylene (mixed) 2.0 ppb Arsenic (cancer endpoint) 3.2 ppb Nickel and compounds 3.6 ppb Copper and compounds 7.1 ppb Lead 8.9 ppb Zinc 11.7 ppb Barium and compounds 15.7 ppb Chromium (total) 48.0 ppb Aluminum 14800.0 ppb

See more details...

Site ID: SITE 00006

WHITING FIELD NAS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jun 2000

Site ID: SITE 00041

WHITING FIELD NAS

Pesticide Shop

Cost

$64K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2014

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: Low Risk

Contaminants: Dieldrin 0.0041 ppb DDT 0.0052 ppb Benzo(a)Pyrene 0.358 ppb

See more details...

Site ID: SITE 00017

WHITING FIELD NAS

Fire/Crash Training Area

Cost

$126K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium and compounds 0.45 ppb Silver and compounds 0.61 ppb Selenium 4.5 ppb DDE 6.5 ppb Arsenic (cancer endpoint) 8.0 ppb Antimony and compounds 10.3 ppb Nickel and compounds 14.7 ppb DDT 19.0 ppb Cadmium and compounds 30.6 ppb Chromium (total) 82.1 ppb Diethyl phthalate 94.0 ppb Vanadium 105.0 ppb Acetone 130.0 ppb Copper and compounds 139.0 ppb Zinc 179.0 ppb Lead 207.0 ppb Mercury and compounds (inorganic) 226.0 ppb Barium and compounds 1350.0 ppb Aluminum 55200.0 ppb

See more details...

Site ID: SITE 00127

WHITING FIELD NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1995

Site ID: SITE 00012

WHITING FIELD NAS

Contaminated Soil Piles

Cost

Unknown

Final Cleanup Action

Dec 2000

Contaminated Areas

Soil: Low Risk

Contaminants: Chromium VI and compounds 0.01 ppb Copper and compounds 0.01 ppb Zinc 0.01 ppb Barium and compounds 0.02 ppb Vanadium 0.02 ppb Lead 0.03 ppb Manganese 0.22 ppb Sodium cyanide 0.23 ppb Potassium cyanide 0.23 ppb Magnesium-28 1.13 ppb Cadmium and compounds 5.96 ppb Iron 8.92 ppb Aluminum 16.5 ppb

See more details...

Site ID: SITE 00011

WHITING FIELD NAS

Landfill

Cost

$35K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2001

This site is under ongoing monitoring until Dec 2044

Contaminated Areas

Soil: Medium Risk

Contaminants: Mercury and compounds (inorganic) 0.06 ppb Beryllium and compounds 0.14 ppb Indeno[1,2,3-cd]pyrene 0.23 ppb Anthracene 0.28 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.54 ppb Benzo[b]fluoranthene 0.71 ppb Benzo[k]fluoranthene 0.87 ppb Benzo[a]pyrene 0.91 ppb Fluoranthene 1.3 ppb Benz[a]anthracene 1.8 ppb Silver and compounds 1.9 ppb Phenanthrene 2.1 ppb Chrysene 2.5 ppb Pyrene 3.4 ppb Antimony and compounds 3.5 ppb Arsenic (cancer endpoint) 3.8 ppb Nickel and compounds 10.0 ppb Copper and compounds 19.4 ppb Chromium (total) 19.6 ppb Vanadium 20.3 ppb Barium and compounds 96.0 ppb Zinc 260.0 ppb Lead 2230.0 ppb Aluminum 10800.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »